Even if a separate service lateral is not required, repairs to existing utility connections may be required when, in the opinion of the City Engineer, the existing lateral is substandard or lacks adequate capacity to serve the new JADU/ADU, creating a health and safety risk. To confirm the adequacy and safety of the existing lateral, the applicant shall provide the City Engineer with evidence confirming the existing lateral's size and materials (e.g., photos of existing service laterals), hydraulic conditions (e.g., pressures and flows, slopes, and sizes), and CCTV footage (with Public Works staff present). The applicant is responsible for all costs related to providing this evidence to the satisfaction of the City Engineer.