Utilities
A.
Electricity and telecommunications. All electric service lines and telecommunications lines shall be located underground. The county engineer may at his/her discretion approve overhead electric distribution lines when the respective utility has demonstrated physical constraints that warrant such placement. [Amended Ord. 08/03/04].
B.
Stormwater. All development shall comply with state and local regulations regarding stormwater and erosion control. At a minimum, stormwater detention systems will be designed for the 100-year storm event and current best management practices (BMP) at the time of development. Drainage plans shall conform to the "Manual for Erosion and Sediment Control in Georgia" from the Georgia State Soil and Water Conservation Service and to the Subdivision Ordinance.
C.
[Deleted Ord. 10/04/05]
D.
[Deleted Ord. 10/04/05]
E.
State waters. All proposed development within the corridor boundary must be more than 200 feet from state waters and must disturb less than one acre to be exempt from an LDA (Land Disturbance Activity) permit. Otherwise, an E&S (Erosion & Sedimentation) plan and permit is required prior to the issuance of a building permit. [Amended Ord. 08/03/04].
ARTICLE IV. LANDSCAPE REQUIREMENTS
Utilities
A.
Electricity and telecommunications. All electric service lines and telecommunications lines shall be located underground. The county engineer may at his/her discretion approve overhead electric distribution lines when the respective utility has demonstrated physical constraints that warrant such placement. [Amended Ord. 08/03/04].
B.
Stormwater. All development shall comply with state and local regulations regarding stormwater and erosion control. At a minimum, stormwater detention systems will be designed for the 100-year storm event and current best management practices (BMP) at the time of development. Drainage plans shall conform to the "Manual for Erosion and Sediment Control in Georgia" from the Georgia State Soil and Water Conservation Service and to the Subdivision Ordinance.
C.
[Deleted Ord. 10/04/05]
D.
[Deleted Ord. 10/04/05]
E.
State waters. All proposed development within the corridor boundary must be more than 200 feet from state waters and must disturb less than one acre to be exempt from an LDA (Land Disturbance Activity) permit. Otherwise, an E&S (Erosion & Sedimentation) plan and permit is required prior to the issuance of a building permit. [Amended Ord. 08/03/04].
ARTICLE IV. LANDSCAPE REQUIREMENTS