search icon

Dupont City Zoning Code

Division V

General Development Requirements

[1]
Prior legislation: Ords. 02-707, 12-937, and 18-1034.

§ 25.75.010 Purpose and intent.

The purpose of this chapter is to promote the public health, safety, and general welfare by establishing goals and requirements for employers to implement commute trip reduction programs in accordance with RCW 70.94.521 through 70.94.551. The city recognizes the importance of increasing citizens' awareness of climate changes, air quality, energy consumption, and traffic congestion and the contribution individual actions can make toward addressing these issues. The intent of this chapter is to achieve the following objectives:
(a) 
To improve air quality, reduce traffic congestion, and reduce the consumption of petroleum fuels through employer-based programs that encourage the use of alternatives to the single occupant vehicle (SOV) for the commute trip.
(b) 
To make optimal use of existing and planned transportation facilities to minimize development costs and preserve business opportunities in DuPont, Pierce County and the state of Washington.
(c) 
To adopt a cooperative and coordinated approach to reducing the number of SOV trips and average vehicle miles traveled (VMT) to ensure consistency regarding CTR policies and implementation.
(d) 
To treat affected employers in a fair and reasonable manner.
(Ord. 10-896 § 1)

§ 25.75.020 Definitions.

The following definitions shall apply in the interpretation and enforcement of this chapter:
“Affected employee”
means a full-time employee who begins his or her regular workday at a single worksite covered by the commute trip reduction plan between 6:00 a.m. and 9:00 a.m. (inclusive) on two or more weekdays for at least 52 continuous weeks. Independent contract employees are excluded. Seasonal agriculture employees, including seasonal employees of processors of agricultural products, are excluded from the count of affected employees. Construction workers who work at a construction site with an expected duration of less than two years are excluded from this definition.
“Affected employer”
means an employer who employs 100 or more affected employees.
“Affected employer worksite”
means a building or group of buildings that are on physically contiguous parcels of land or on parcels separated solely by private or public roadways or rights-of-way, and at which there are 100 or more affected employees.
“Alternative commute mode”
refers to any means of commuting other than that in which the single-occupant motor vehicle is the dominant mode, including teleworking/telecommuting and compressed work week schedules that result in the reduction of commute trips.
“Carpool”
means a motor vehicle occupied by two to four people of at least 16 years of age traveling together for their commute trip that results in the reduction of a minimum of one motor vehicle commute trip.
“Commute trip”
means a trip that is made from a worker's home to a worksite.
“Commute trip reduction (CTR) plan”
means the adopted city of DuPont plan and ordinance to regulate and administer the CTR programs of affected employers.
“Compressed work week”
means a full-time employee work schedule that allows an employee to eliminate at least one workday every two weeks by working more hours during the remaining days, resulting in fewer commute trips by the employee. Examples would include working four workdays per week or nine workdays in two weeks. Compressed work weeks are understood to be an ongoing arrangement.
“CTR”
is the abbreviation of commute trip reduction.
“CTR program”
means an employer’s strategies to reduce employees’ SOV trips and average VMT per employee.
“Day”
means calendar day.
“Department”
means the Pierce County public works and utilities department.
“Dominant mode”
means the mode of travel used for the greatest distance of a commute trip.
“Employee transportation coordinator”
means a designated person who is responsible for the development, implementation and monitoring of an employer’s CTR program.
“Employer”
means a sole proprietorship, partnership, corporation, unincorporated association, cooperative, joint venture, agency, department, district or other individual or entity, whether public, nonprofit, or private, that employs workers.
“Flex-time”
is a flexible work schedule which is a mutual agreement between the employee and the employer to choose the work time, but not the number of working hours. Flex-time is understood to be an ongoing arrangement.
“Full-time employee”
means a person, other than an independent contractor, scheduled to be employed on a continuous basis for 52 weeks for an average of at least 35 hours per week.
“Good faith effort”
means that an employer has met the minimum requirements identified in RCW 70.94.534(2) and this chapter and is working collaboratively with the county to continue its existing CTR program or is developing and implementing program modifications likely to result in improvements to its CTR program over an agreed-upon length of time.
“Implementation” or “implement”
means active pursuit by an employer to achieve the CTR goals of RCW 70.94.521 through 70.94.551 and this chapter.
“Mode”
means the type of transportation used by employees, such as single-occupant motor vehicle, rideshare vehicle (carpool, vanpool), transit, train, ferry, bicycle, compressed work week schedules, teleworking/telecommuting, and walking.
“Newly affected employer”
refers to an employer that is not an affected employer upon the effective date of this chapter but who becomes an affected employer subsequent to the effective date of this chapter.
“Proportion of single-occupant vehicle trips”
means the number of commute trips over a set period made by employees in SOVs divided by the number of potential trips taken by employees working during that period.
“Single-occupant vehicle” or “SOV”
means a motor vehicle occupied by one person for commute purposes, including a motorcycle.
“Single worksite”
means a building or group of buildings on physically contiguous parcels of land or on parcels separated solely by private or public roadways or rights-of-way.
“Teleworking/telecommuting”
means the authorization of an employee to work from home, satellite office or from a teleworking center, thus eliminating a commute trip or reducing the distance traveled in a commute trip by at least half of the employee’s regular commute distance.
“Transit”
means a multiple-occupant vehicle operated on a shared-ride basis, including bus, ferry, or rail.
“Transportation management organization (TMO)” or “transportation management association (TMA)”
means a group of employers or an association representing a group of employers in a defined geographic area. A TMO/TMA may represent employers within specific city limits, or may have a sphere of influence that extends beyond city limits.
“Vanpool”
means a vehicle occupied by five to 15 people of 16 or more years of age traveling together for their commute trip that results in the reduction of motor vehicle trips.
“Vehicle miles traveled (VMT) per employee”
means the sum of the individual vehicle commute trip lengths in miles made by affected employees over a set period divided by the number of affected employees during that period.
“Week”
means a seven-day calendar period, starting on Sunday and continuing through Saturday.
“Weekday”
means any day of the week except Saturday or Sunday.
“Writing,” “written,” or “in writing”
means original signed and dated documents. Facsimile (fax) transmissions and electronic transmissions are a temporary notice of action that must be followed by the original, signed and dated, via mail or delivery.
(Ord. 10-896 § 1)

§ 25.75.030 City CTR plan.

The county has a variety of responsibilities pursuant to the requirements of RCW 70.94.521 through 70.94.551. The city CTR plan addresses these responsibilities and establishes the goals for the city and the CTR-affected employers and is incorporated herein by reference.
(Ord. 10-896 § 1)

§ 25.75.040 Responsible official/agency.

The city employee transportation coordinator and the county are jointly responsible for implementing this chapter.
(Ord. 10-896 § 1)

§ 25.75.050 Applicability.

(a) 
Affected Employer. The provisions of this chapter shall apply to any affected employer at any single worksite within the limits set forth in the city CTR plan.
(b) 
Change in Status as an Affected Employer. Any of the following changes in an employer’s status may change the employer’s CTR program requirements:
(1) 
Change from Affected to a Nonaffected Status. If an employer initially designated as an affected employer no longer employs 100 or more affected employees and expects not to employ 100 or more affected employees for the next 12 months, that employer is no longer an affected employer. It is the responsibility of the employer to notify the county in writing that it is no longer an affected employer and provide supporting evidence.
(2) 
Change in Status Within a 12-Month Period. If an employer drops below the threshold and then returns to the threshold level of 100 or more affected employees within the same 12 months, that employer will be considered an affected employer for the entire 12 months, and will be subject to the program requirements as other affected employers.
(3) 
Change in Status After a 12-Month Period. If an employer drops below the threshold and then returns to the threshold level of 100 or more affected employees 12 or more months after its change in status to an “unaffected” employer, that employer shall be treated as a newly affected employer.
(c) 
Newly Affected Employers.
(1) 
Identification. Newly affected employers must identify themselves to the county within 30 days of either moving into the boundaries as set forth in the city CTR plan or growing in employment at a worksite to 100 or more affected employees. It is the responsibility of the employer to notify the county of its affected employer status. Newly affected employers who do not identify themselves within 30 days will be considered to be in violation of this chapter.
(2) 
Survey. Newly affected employers shall perform a baseline measurement within 90 days after the adoption of the CTR program. The employer shall utilize the state-provided survey measurement tool or state-approved equivalent format and strive to achieve at least a 70 percent response rate from employees at the worksite. Employers who do not perform a baseline measurement within 90 days of receiving written notification that they are subject to this chapter are in violation of this chapter.
(3) 
Program Development. Not more than 90 days after receiving notification of the results of the baseline measurement, the newly affected employer shall develop and submit a CTR program to the county, utilizing the format provided by the county. The program shall be developed in consultation with the county to be consistent with the goals of the CTR plan. Employers who do not submit their CTR program within 90 days are in violation of this chapter.
(4) 
Implementation. The program shall be implemented not more than 90 days after approval by the county. Employers who do not implement an approved CTR program within 90 days are in violation of this chapter.
(Ord. 10-896 § 1)

§ 25.75.060 Notification of applicability.

(a) 
Notice to Known Affected Employers. Known affected employers located in the city shall receive written notification that they are subject to this chapter and any revisions to this chapter. Such notice shall be by certified mail or delivery, return receipt, addressed to the company’s chief executive officer, senior official, or CTR manager at the worksite. Such notification shall be delivered 30 days after the adoption of this chapter or any revisions to this chapter.
(b) 
Self-Identification of Affected Employers. Employers who, for whatever reasons, do not receive notice within 30 days of adoption or amendment of this chapter shall identify themselves to the county within 60 days of the adoption of this chapter.
(c) 
Notification of Nonapplicability. The employer shall notify the county, in writing, the nonapplicability of this chapter to their worksite.
(Ord. 10-896 § 1)

§ 25.75.070 Employer program requirements.

An affected employer shall make a good faith effort as defined in RCW 70.94.534(2) and this chapter to develop and implement a CTR program that will encourage their employees to reduce VMT per employee and SOV trips. The employer shall provide effective staffing levels and financial resources to support the following employer requirements:
(a) 
CTR Program Description Requirements. The CTR program description presents the strategies to be undertaken by an employer to achieve the CTR goals for each goal year. Employers are encouraged to consider innovative strategies and combine program elements in a manner that will best suit their location, site characteristics, business type, and employees’ commuting needs. Employers are further encouraged to cooperate with each other and to form or use transportation management organizations in developing and implementing CTR programs.
At a minimum, the employer’s description must include:
(1) 
General description of the employment site location, transportation characteristics, and surrounding services, including unique conditions experienced by the employer or its employees;
(2) 
Number of employees affected by the CTR program;
(3) 
Documentation of compliance with the mandatory CTR program elements;
(4) 
Description of the additional elements included in the CTR program; and
(5) 
Schedule of implementation, assignment of responsibilities, and commitment to provide appropriate resources.
(b) 
Employee Transportation Coordinator.
(1) 
The employer shall designate an employee transportation coordinator to administer the CTR program. The coordinator or designee’s name, location, and telephone number must be displayed prominently at each affected worksite. The coordinator shall oversee all elements of the employer’s CTR program and act as liaison between the employer and the county.
(2) 
Employers with multiple affected worksites located in the county shall have effective program administration at each affected worksite.
(3) 
An employer may utilize the employee transportation coordinator services of a TMO/ TMA. If a TMO/TMA is utilized, the employer shall still be responsible for meeting all the requirements of RCW 70.94.521 through 70.94.551 and this chapter.
(c) 
Information Distribution.
(1) 
Information about alternatives to SOV commuting as well as a summary of the employer’s CTR program shall be provided to employees at least once a year.
(2) 
All new employees at the time of hire or during the employer’s new hire orientation shall receive information about alternatives to SOV commuting, a summary of the employer’s CTR program and information to access a ride-matching database.
(3) 
At least once a month, the employer shall provide information to employees about commute options, employer program elements, or county-wide/state-wide commuter services, programs and events.
(4) 
At least once a year the employer shall conduct a transportation event or promotional campaign.
(d) 
Emergency Ride Home. The employer shall offer to its employees an emergency ride home program that guarantees employees a free ride home in emergency situations when they use alternative commute modes.
(e) 
Additional Program Elements Designed to Achieve the Goals. In addition to the specific program elements described above, employer CTR programs shall include, but are not limited to, one or more of the following measures:
(1) 
Provide preferential parking for high-occupancy vehicles;
(2) 
Reduce parking charges for high-occupancy vehicles;
(3) 
Institute or increase parking charges for SOV commuters;
(4) 
Eliminate free parking;
(5) 
Decrease the number of parking stalls within the constraints of the parking code regulations;
(6) 
Provide a parking incentives program such as a rebate for employees who do not use the parking facilities;
(7) 
Provide commuter ride-matching services to facilitate employee ride-sharing for commute trips;
(8) 
Provide subsidies for transit, rail, or vanpool fares and/or passes;
(9) 
Provide subsidies for carpools, walking, bicycling, telework/telecommuting or compressed work week schedules;
(10) 
Provide incentives for employees who do not drive alone to work;
(11) 
Provide vans for vanpools;
(12) 
Permit the use of the employer’s vehicles for carpooling or vanpooling;
(13) 
Permit the use of the employer’s vehicles for emergency ride home or personal errands;
(14) 
Establish a flex-time policy;
(15) 
Establish a compressed work week schedules policy;
(16) 
Establish a telework/telecommute policy;
(17) 
Cooperate with transit providers to provide additional regular or express service to the worksite;
(18) 
Construct special loading and unloading facilities for transit, carpool, and vanpool users;
(19) 
Provide bicycle parking facilities, changing areas, showers and clothes lockers for employees who bicycle or walk to work;
(20) 
Implement other measures designed to facilitate the use of high-occupancy vehicles, such as on-site services like a cafeteria or day care facility;
(21) 
Other ideas that facilitate the reduction of SOV trips.
(f) 
CTR Program Reporting.
(1) 
Quarterly Reporting. Affected employers shall submit to the county a quarterly progress report in accordance with the format provided by the county.
(2) 
Due Dates for Quarterly Reporting. First quarter (January, February and March), second quarter (April, May and June) and third quarter (July, August and September) reports shall be due 10 days past the end of the quarter. Fourth quarter (October, November, and December) reports shall be due the second Wednesday in December.
(3) 
Annual Reporting. Affected employers shall review their CTR program and implementation progress by submitting an annual report with the county in accordance with the format provided by the county. The annual report shall outline the strategies undertaken by an employer to achieve the CTR for the reporting period and the strategies to be undertaken for the next reporting year. The employer should evaluate the effectiveness of the CTR program, and, if necessary, propose modifications to achieve the CTR goals.
(4) 
Due Date for Annual Reporting. All annual reports shall be due by the second Wednesday of December.
(5) 
Annual Reporting Extension. An employer may request an extension of up to 30 days for submitting the annual report. The request shall be made in writing to the county no less than 15 days prior to the due date.
(g) 
Biennial Survey Measure of Employee Commute Behavior. In addition to the baseline measurement, employers shall conduct a program evaluation as a means of determining worksite progress toward meeting CTR goals. As part of the program evaluation, the employer shall utilize the state-provided survey measurement tool or state-approved equivalent format and strive to achieve at least a 70 percent response rate from employees at the worksite. The county will establish a countywide measurement schedule that will require employers to conduct the measurement survey on a two-year cycle. Depending on when a newly affected employer is identified, a baseline survey and measurement survey may be required during the established measurement schedule. For the purpose of this chapter, an employer shall not be required to survey more than once in a 12-month period.
(h) 
Recordkeeping. Affected employers shall maintain a copy of official correspondences between the employer and the county, measurement results, and all supporting documentation for the descriptions and assertions made in any CTR report to the county for a minimum of 48 months. The county and the employer shall agree on the recordkeeping requirements as part of the accepted CTR program.
(Ord. 10-896 § 1)

§ 25.75.080 Program modifications and exemptions.

(a) 
At any time, any affected employer may request that the county grant a modification from a CTR program requirement other than designation of the employee transportation coordinator, information distribution, surveying, and annual reports.
(b) 
Modification of individual program measures shall not exempt an affected employer from complying with other required program measures.
(1) 
Employee Adjustment. Groups of (A) employees who are required to drive alone to work as a condition of employment, or (B) employees who work variable shifts throughout the year and do not rotate as a group to identical shifts may be exempted from a worksite’s survey measurement. Affected employees who are exempted from a worksite’s CTR program shall be counted when determining the total number of affected employees at the worksite.
(2) 
Hardship. A one-year program waiver may be granted only if an affected employer demonstrates extraordinary circumstances, such as bankruptcy, and is unable to implement any measures that would reduce the proportion of SOV trips or average VMT per employee.
(c) 
Affected Employer May Request a CTR Program Modification or Waiver at Any Time. The department shall review such requests and notify the employer of its decision in writing within 30 days of the date the department receives the written request. The department shall review annually all modifications and exemptions and shall determine whether they will remain in effect during the following program year.
(Ord. 10-896 § 1)

§ 25.75.090 Review of CTR programs.

(a) 
Newly Affected Employer. The first annual report submitted by a newly affected employer shall be accepted by the department as long as it addresses necessary baseline information and all required elements.
(b) 
Review and Evaluation. The department’s review and evaluation shall address the employer’s good faith efforts toward meeting the CTR goals. Programs may be deemed acceptable or unacceptable based on the employer’s progress in reducing commute trips, as measured by reduction in SOV trips or reduction in average VMT. The employer shall provide adequate information and documentation of program implementation when required by the county.
(c) 
Document Review. Within 90 days of the date the department receives an employer’s annual report, the department shall provide the employer with written notification of whether a CTR program is deemed acceptable or unacceptable. If the CTR program is deemed unacceptable, the notification must give cause for the rejection. The department may extend the review period up to 90 days. If the review period is extended, the implementation date for the employer’s CTR program shall be extended an equivalent number of days.
(d) 
Review Criteria. The county shall use the following criteria to determine whether an affected employer shall be required to make modifications to its CTR program.
(1) 
If an employer makes a good faith effort, as defined in RCW 70.94.534(2) and this chapter, and meets or exceeds either the applicable SOV or VMT reduction goal, the employer has satisfied the objectives of this chapter, and will not be required to modify its CTR program.
(2) 
If an employer makes a good faith effort, as defined in RCW 70.94.534(2) and this chapter, but fails to meet both the applicable SOV and VMT reduction goals, the county shall work collaboratively with the employer to implement program modifications likely to result in improvements to the program over an agreed-upon length of time.
(3) 
If an employer fails to make a good faith effort, as defined in RCW 70.94.534(2) and this chapter, and fails to meet both the applicable SOV and VMT reduction goals, the county shall work collaboratively with the employer to identify modifications to the CTR program and shall direct the employer to revise its program accordingly and submit the revised program to the county within 30 days.
(e) 
Request for Conference. Within 10 days of receipt of written notice for an unacceptable CTR program, the county or employer may request a conference to discuss the department’s decision. This conference shall be scheduled during county official hours.
(f) 
Implementation of CTR Program Modifications. If the county proposes modifications to an affected employer’s CTR program due to the CTR program’s unacceptability, the affected employer shall have 30 days to submit a revised CTR program that includes the proposed or other mutually agreed modifications.
(g) 
Employer Intent to Modify. The employer shall notify the county in writing of its intent to substantially change or modify its approved program. Within 30 days, the county shall review the request. If found unacceptable, the county shall work collaboratively with the employer to design program modifications likely to result in improvements to the program over an agreed-upon length of time.
(h) 
Leadership Certificate. Employers who meet at least one goal will receive a CTR certificate of leadership from the county.
(Ord. 10-896 § 1)

§ 25.75.100 Enforcement and penalties.

(a) 
Compliance. For purposes of this chapter, “compliance” shall mean fully implementing all provisions in an approved CTR program or making a good faith effort as defined in RCW 70.94.534(2) and this chapter.
(b) 
Violations. The following constitute violations of this chapter:
(1) 
Failure to develop and/or submit a complete program by the applicable deadlines as stated in this chapter.
(2) 
Failure to implement an approved CTR program by the applicable deadlines as stated in this chapter.
(3) 
Failure to modify an unacceptable CTR program by the applicable deadlines as stated in this chapter.
(4) 
Failure of an affected employer to identify itself to the department within 60 days of the effective date of this chapter.
(5) 
Failure of a newly affected employer to identify itself to the department within 30 days of becoming an affected employer.
(6) 
Failure to submit quarterly and annual reports by the applicable deadlines as stated in this chapter.
(7) 
Failure to complete the survey measurement by the applicable deadlines as stated in this chapter.
(8) 
Failure to maintain CTR program records.
(9) 
Intentionally submitting fraudulent or false information, data and/or survey results.
(c) 
Penalties.
(1) 
Penalties shall be levied per the applicable section of the Pierce County Code.
(Ord. 10896 § 1)

§ 25.75.110 Appeals of administrative decisions.

(a) 
Appeals. Any affected employer may appeal administrative decisions of the department director or designee regarding modification of goals, modification of CTR program elements, and penalties to the county hearing examiner pursuant to Pierce County Code Chapter 1.22. Appeals shall be filed within 30 days of the administrative decision.
(b) 
Criteria. The hearing examiner will evaluate administrative decision appeals by determining whether the department’s decisions were consistent with CTR law, Chapter 468-63 WAC and this chapter. An appeal may be granted if the employer can show:
(1) 
The violation for which the penalty was imposed occurred for reasons beyond the control of the employer.
(2) 
The measures that the department directed the employer to incorporate into its CTR program are unlikely to reduce the proportion of SOV trips or VMT per employee.
(c) 
Judicial Appeal. An affected employer may appeal any decision of the hearing examiner to the Pierce County district court and any such appeal shall be limited to the record made before the examiner.
(Ord. 10-896 § 1)

§ 25.75.120 CTR program for employees of city government.

In accordance with RCW 70.94.521 through 70.94.551, the city shall implement a CTR program for city employees. A copy of the city’s CTR program is on file at DuPont City Hall, 1700 Civic Drive, DuPont, Washington 98327.
(Ord. 10-896 § 1)

§ 25.80.010 Purpose.

This chapter is to encourage identification, protection, preservation and/or restoration of cultural resource sites of documented significance. Important cultural resource sites are identified so that they may be incorporated into open space areas and connected to the recreational trail system.
(Ord. 02707 § 1)

§ 25.80.020 Cultural resource sites.

(1) 
The following are designated cultural resource sites:
(a) 
1833 site of Fort Nisqually;
(b) 
1843 site of Fort Nisqually;
(c) 
Site of Methodist/Episcopal Mission; and
(d) 
Wilkes Observatory site.
(2) 
The city council may designate additional cultural resource sites eligible for inclusion in the State or National Registers of Historic Places.
(Ord. 02-707 § 1)

§ 25.80.030 Prohibition of construction within designated sites.

No structures, roads or utilities are permitted within 50 feet of the markers identifying cultural resource sites designated under DMC § 25.80.020.
(Ord. 02-707 § 1)

§ 25.80.040 Construction within areas of potential historical or cultural resources.

The city shall maintain a map showing potential cultural resource areas, and shall review every development proposal to ensure appropriate measures are taken to protect such areas. Auger tests may be required before construction and representatives of the State Historical Preservation Office or the Nisqually Indian Tribe may be invited to observe any tests and construction work. If auger or historical data indicate probable presence of cultural resources which may be disturbed by excavation, the mayor or his or her designee shall meet the developer and may impose conditions on any plat, site plan or permit to assure that such resources are protected, preserved or collected.
(Ord. 02-707 § 1)

§ 25.85.010 Purpose.

The incentives and regulations offered in this chapter are used by the city as one means of meeting its commitment to encourage housing affordable to all economic groups, and to meet its regional share of affordable housing requirements. The purpose of this chapter is to:
(1) 
Help achieve comprehensive plan goals of affordable housing;
(2) 
Implement through regulations the responsibility of the city under state law to provide for housing opportunities for all economic segments of the community;
(3) 
Preserve opportunities for affordable housing as the city continues to grow;
(4) 
Create affordable housing opportunities as a result of increased development capacity in various zones of the city;
(5) 
Encourage developments that include affordable housing and that combine local incentives provided by the city with resources available from other public and private sources.
(Ord. 171017 § 2 (Exh. B))

§ 25.85.020 Locations and descriptions of affordable housing incentive programs.

(1) 
Optional Residential Density Bonus for Affordable Housing.
(a) 
Applicability. This section applies to all land use applications, except the following: the construction of one single-family dwelling on one lot that can accommodate only one dwelling based upon the underlying zoning designation, which is not eligible for density bonuses.
(b) 
Rental Affordable Housing. Density for land subject to the provisions of this section may be increased by up to 50 percent above the underlying base density when each of the additional units is provided for households whose incomes are at or below low income.
(c) 
For-Purchase Affordable Housing. Density for land subject to the provisions of this section may be increased above the base density by the following amounts:
(i) 
Up to a maximum of 50 percent above the underlying base density when each of the additional units or residential building lots is provided for households whose incomes are at or below low income.
(ii) 
Up to a maximum of 40 percent above the underlying base density when each of the additional units or residential building lots is provided for households whose incomes are at or below moderate income.
(iii) 
Up to a maximum of 20 percent above the underlying base density when the first 10 percent of the housing units are affordable to households with incomes at or below moderate income. The remaining 10 percent may be affordable to households whose incomes are at or below middle income.
(d) 
Summary Table. The provisions of subsections (1)(b) and (c) of this section are summarized in Table 25.85.
Table 25.85: Affordable Housing Density
Bonus Provision Summary
Affordable Housing – Optional for Purchase
For Rent
Up to 50% density bonus if each of the bonus units is affordable to households whose incomes are at or below low income.
Up to 50% density bonus when each of the bonus units is affordable to households with incomes at or below low income.
Up to a 40% density bonus if each of the bonus units is affordable to households whose incomes are at or below moderate income.
Up to a maximum of 20% above the underlying base density when the first 10% of the housing units are affordable to households with incomes at or below moderate income. The remaining 10% may be affordable to households whose incomes are at or below middle income.
(2) 
Impact Fee Exemption. Within all zones, exemptions from impact fees for new residential construction are permitted in accordance with DMC § 26.05.120.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.85.030 Modifications of development standards.

An applicant may request a modification of the minimum required number of parking spaces pursuant to Chapter 25.95 DMC.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.85.040 Affordable housing agreement.

Prior to issuing any building permit, an agreement in a form approved by the director that addresses price restrictions, homebuyer or tenant qualifications, phasing of construction, monitoring of affordability, duration of affordability, and any other applicable topics of the affordable housing units shall be recorded with Pierce County auditor department. This agreement shall be a covenant running with the land and shall be binding on the assigns, heirs and successors of the applicant. The city may agree, at its sole discretion, to subordinate any affordable housing regulatory agreement for the purpose of enabling the owner to obtain financing for development of the property.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.85.060 Implementation provisions.

The following requirements shall be met for all affordable units created through any of the incentive programs referenced in DMC § 25.85.020:
(1) 
Duration. Affordable housing units that are provided under this section shall remain as affordable housing for a minimum of 50 years except, at the sole discretion of the city, approval may be for a shorter period so that federal underwriting standards are met. But in no case shall the time period be less than 30 years from the date of initial owner occupancy for ownership affordable housing units and for the life of the project for rental affordable housing units.
(2) 
Designation of Affordable Housing Units. Prior to the issuance of any permit(s), the city shall review and approve the location and unit mix of the affordable housing units consistent with the following standards:
(a) 
Location. The location of the affordable housing units shall be approved by the city, with the intent that they generally be intermingled with all other dwelling units in the development.
(b) 
Tenure. The tenure of the affordable housing units (ownership or rental) shall be the same as the tenure for the rest of the housing units in the development.
(c) 
Size (Bedroom). The affordable housing units shall consist of a range of number of bedrooms that are comparable to units in the overall development.
(d) 
Size (Square Footage). The size of the affordable housing units, if smaller than the other units with the same number of bedrooms in the development, must be approved by the director. If there is a proposal that the affordable units be smaller than the market rate units, in no case shall the affordable housing units be less than 500 square feet for a studio unit, 600 square feet for a one-bedroom unit, 800 square feet for a two-bedroom unit, or 1,000 square feet for a three-bedroom unit.
(e) 
Design. The exterior design of the affordable housing units must be compatible and comparable with the rest of the dwelling units in the development and must comply with any design standards for the underlying zoning district. The interior finish and quality of construction of the affordable housing units shall at a minimum be comparable to entry level rental or ownership housing in the city.
(3) 
Timing/Phasing. The affordable housing units shall be available for occupancy in a time frame comparable to the availability of the rest of the dwelling units in the development.
(4) 
Monitoring and Fee. The city reserves the right to establish in the affordability agreement referred to in DMC § 25.85.040 monitoring fees for the affordable housing unit, which can be adjusted over time to account for inflation. The purpose of any monitoring fee is for the review and processing of documents to maintain compliance with income and affordability restrictions of the affordability agreement.
(5) 
Administrative Official. The director shall be responsible for administration of this chapter. The director may adopt administrative procedures for implementation of this section.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.90.010 Purpose.

(1) 
The purpose of this chapter is to:
(a) 
Protect natural habitats, air quality, and ground water recharge;
(b) 
Improve the appearance of the community;
(c) 
Provide shade and wind protection;
(d) 
Reduce stormwater discharge; and
(e) 
Conserve water supplies.
(2) 
This chapter is intended to help achieve these purposes by:
(a) 
Retaining trees, without reducing developmental densities from those indicated in the comprehensive plan;
(b) 
Requiring landscaping;
(c) 
Reducing the need to irrigate; and
(d) 
Requiring that landscapes be adequately maintained and irrigated.
(Ord. 02-707 § 1)

§ 25.90.020 Substantive requirements – Proportion of landscape areas (see definitions).

(1) 
Whereas some of these requirements preserve certain trees and other requirements, such as parking lot landscaping, soften particular site features, the community as a whole needs a balance between its landscape areas and its pavements and structures. To this end, a portion of the land surface of certain types of development shall be landscape areas.
(2) 
The minimum portion which must be a landscape area depends on the type or use, as follows:
(a) 
Single-family: 30 percent;
(b) 
Multifamily: 30 percent;
(c) 
Commercial, office, mixed use, school, business and technology, and manufacturing/ research: 20 percent;
(d) 
Industrial: 10 percent for those properties that adjoin DuPont Steilacoom Road or Center Drive. All other industrial properties shall be required to landscape abutting a public right-of-way or residential district.
(3) 
Sensitive areas, sensitive area buffers, public parks, and land designated as open space shall not count toward this requirement. All other lands, including lands devoted to meeting other requirements of this chapter, shall count toward this requirement.
(4) 
The city encourages some of the required percentage of landscape areas to be met by leaving land at its natural grade with native vegetation.
(Ord. 02-707 § 1)

§ 25.90.030 Substantive requirements – Landscaping.

(1) 
Street Trees. At time of street construction, or time of development of the adjoining land, street trees and related landscaping shall be provided in medians and parking strips within the right-of-way in accordance with the city's public works standards. Street trees shall be:
(a) 
Provided at least one per 40 to 50 feet of frontage, depending on the tree species and other circumstances;
(b) 
Located within the street right-of-way;
(c) 
Of the same species as other street trees in the same streetscape;
(d) 
Spaced to accommodate sight distance requirements for driveways and intersections; and
(e) 
At least two inches caliper measured six inches above the ground line with a single-stem and minimum branch height of six feet.
(2) 
Interior Parking Lot Landscaping. To provide shade and visual relief, the interior of surface parking lots with 10 or more stalls shall be landscaped with at least one tree per six stalls.
(3) 
Buffers. Though the comprehensive plan is designed to minimize adjacent, incompatible land uses, such incompatibilities sometimes arise in detailed site planning. In these cases, a buffer (see DMC § 25.10.020, B definitions) is required, as follows:
(a) 
A moderate buffer shall be provided between parking lots and any adjacent public right-of-way.
(b) 
In the process of reviewing development proposals, the city will require full, moderate, or light buffers as necessary to mitigate incompatibility, for example between residential and nonresidential development, or between an outdoor storage or trash receptacle area and surrounding high-use areas.
(Ord. 02-707 § 1; Ord. 07-854 § 1)

§ 25.90.040 Substantive requirements – Water conservation.

(1) 
The city encourages landscape design which requires minimal irrigation. Water-conservative landscaping is generally achieved by:
(a) 
Mulching or otherwise improving soils to retain moisture and increase fertility;
(b) 
Minimizing irrigation-intensive plantings, especially lawns, and maximizing drought-tolerant species and retention of pre-existing vegetation;
(c) 
In lawns, using grass species which require less water and tolerate drought;
(d) 
Separating drought-tolerant and nondrought tolerant species as necessary to irrigate by zones; and
(e) 
Installing irrigation systems that:
(i) 
Irrigate by zones according to water need (pre-existing vegetation, drought-tolerant plantings, and naturally moist areas rarely require irrigation);
(ii) 
Use devices such as moisture sensors and automatic timers to operate only when necessary, and when evaporation is least; and
(iii) 
Use pressure-regulating devices.
(2) 
All required landscape plans except those listed in subsection (4) of this section shall include a water conservation element including:
(a) 
A statement of the techniques proposed to conserve water; and
(b) 
A projection, prepared by a state-registered landscape architect, Washington certified nurseryman, or Washington certified landscaper, of the amount of irrigation the proposed landscape will require, in gallons per square foot of landscaping, excluding retained native vegetation, per year.
(3) 
No landscape plan except those listed in subsection (4) of this section shall be approved whose irrigation projection exceeds the following per year, where the area is that of the proposed landscaping excluding retained native vegetation:
(a) 
11.6 inches; or
(b) 
7.2 gallons per square foot; or
(c) 
313,632 gallons per acre.
(4) 
Subsections (2) and (3) of this section shall not apply to:
(a) 
Projects with a total landscape area of less than 500 square feet;
(b) 
Projects irrigated with water that is not supplied by the city; or
(c) 
Turf intended for use as an athletic playing surface.
(Ord. 02-707 § 1)

§ 25.90.050 Substantive requirements – Maintenance and irrigation.

To the extent necessary to remain healthy and attractive, all nonnative landscaping shall be watered, weeded, pruned, freed of pests, and replaced if necessary. Shrubs near parking lots or driving lanes shall be cropped to prevent blockage of vision necessary for safe driving. Shrubs shall not be allowed to grow so as to block sidewalks.
(Ord. 02-707 § 1)

§ 25.90.060 Landscape plan approval process.

(1) 
Before any land development to which this chapter is applicable, and before any land is cleared or graded, except when the clearing is pursuant to a forest practice permit which does not allow the land to convert to urban use, the proponent shall, along with other permit applications, submit a landscape plan. The landscape plan shall address all substantive requirements (see DMC §§ 25.90.020 through 25.90.050) applicable to the development.
(2) 
The landscape plan may be conceptual in the early review phase of a development proposal, but by the time of formal permit application it shall contain sufficient information to determine whether the proposed landscape will satisfy this chapter. The administrator may provide proponents with standard form or list of landscape plan submittal requirements.
(3) 
The landscape plan shall be designed or approved by a registered landscape architect or other professional deemed qualified by the administrator.
(4) 
Review of landscape plans separate from formal land use applications shall be processed with a Type I procedure per DMC § 25.175.010(4) at no additional cost.
(5) 
The landscaping plan shall be implemented before issuance of a certificate of occupancy, except that, with adequate assurance from the proponent, which may include posting of a performance bond, the administrator may extend the installation deadline to the next appropriate planting season.
(Ord. 02-707 § 1; Ord. 05-790 § 3)

§ 25.90.070 Modifications.

Repealed by Ord. 05-790.
(Ord. 02-707 § 1)

§ 25.90.080 Appeals.

Repealed by Ord. 05-790.
(Ord. 02-707 § 1)

§ 25.95.010 Purpose.

The purpose of this chapter is to:
(1) 
Assure that the supply of off-street parking spaces reasonably satisfies demand at all but the peak demand times of year;
(2) 
Avoid over-reliance on on-street parking; and
(3) 
Retain enough scarcity so drivers have an incentive to utilize modes of transportation other than single-occupancy vehicles, and so permeable soils are not unnecessarily paved over.
(Ord. 02707 § 1)

§ 25.95.020 Applicability.

Off-street parking shall be provided in accordance with this chapter whenever and to the extent that any building is built, enlarged, moved onto a lot, or occupied by a new use requiring more off-street parking.
(Ord. 02-707 § 1)

§ 25.95.030 Number of spaces.

(1) 
The minimum required and maximum allowed number of parking spaces shall be as follows, computed to the nearest whole number:
Land Use
Minimum # of Spaces
Maximum # of Spaces
Per
Housing reserved for senior citizens
0.5
N/A
Dwelling unit
Group home
0.25
N/A
Maximum occupancy
Transient guest facility
0.5
N/A
Transient unit
Single-family and multifamily housing
2
N/A
Dwelling unit
Office, clinic, and bank
2
4
1,000 square feet
Eating and drinking establishment
8
16
1,000 square feet open to the public
Low-intensity sales and service
1
3
1,000 square feet
High-intensity sales and service
2
5
1,000 square feet
Places of public assembly
0.15
0.4
Person at maximum occupancy
Hospital and residential health care facilities
0.2
0.4
Bed
Day care and preschools
2
4
Working at maximum shift
Industries, research facilities, print shops, bakeries, wholesales, and warehouses
0.3
1
Working at maximum shift
Commercial parking
Not applicable (N/A)
(2) 
The administrator shall determine parking requirements for uses not listed above, such as open-air activities, schools, plant nurseries, public utilities, outdoor recreation, mini-storage, and drive thru facilities (car wash, service stations, etc.) on a case-by-case basis.
(3) 
For employers implementing commute trip reduction programs, whether over or under 100 employees, the administrator may reduce the required minimum number of parking spaces to reflect the reduction in parking needs caused by the commute trip reduction program.
(Ord. 02-707 § 1)

§ 25.95.040 Location.

(1) 
Required off-street parking spaces shall be located in an appropriately zoned area within 500 feet walking distance from an entrance to the building served.
(2) 
Parking spaces shall not be located within any required vision clearance triangle.
(3) 
In residential areas, parking spaces shall not be located in required front yards.
(4) 
In commercial areas, parking spaces shall not be located in required front yards or in required side yards abutting residential areas.
(5) 
In manufacturing/research park areas, parking shall not be located in required front yards or within five feet of any property line.
(6) 
In industrial areas, parking spaces shall not be located within 20 feet of the front property line.
(Ord. 02-707 § 1)

§ 25.95.050 Development standards.

Off-street parking facilities shall:
(1) 
Access a public thoroughfare(s) by means of a driveway(s) that is at least 10 feet wide per lane and located with respect to intersections and crosswalks so as not to endanger or impede traffic;
(2) 
Incorporate maneuvering room so as not to require backing out onto a public street, except that parking spaces serving single-family residences and duplexes may utilize a street to back out provided the street is not an arterial and the driveway is at least 50 feet from the nearest street intersection;
(3) 
Be surfaced with a dust-free, durable material;
(4) 
Be designed to avoid on-site and off-site drainage problems;
(5) 
Incorporate adequate traffic control devices to inform users of the designed use of spaces, ingress, egress, and maneuvering spaces. Parking spaces other than those for single-family residences shall be separately identified by striping, wheel-stops, or similar means;
(6) 
Provide for convenient pedestrian movement from parking spaces to building entrances, sufficiently separated from vehicular traffic to ensure safety; and
(7) 
Conform to the landscaping provisions of this title; and
(8) 
All off-street parking lots shall be designed in accordance with city standards for stalls and aisles as set forth in the following table and figures:
A
=
Parking Angle
B
=
Basic Stall Width
C
=
Stall Depth (no bumper overhang)
D
=
Aisle Width
E
=
Stall Width (parallel to aisle)
F
=
Module Width (no bumper overhang)
G
=
Bumper Overhang
H
=
Backing Area
I
=
Module Intermesh
Notes:
1)
For one row of stalls use “C” plus “D” as minimum bay width.
2)
Public alley width may be included as part of dimension “D,” but all parking stalls must be on private property, off the public right-of-way.
3)
For estimating available parking area, use 350 square feet per vehicle for stall, aisle and access areas.
4)
The minimum aisle width for two-way traffic and for emergency vehicle operations area is 26 feet. The minimum aisle width for emergency vehicle access (one-way traffic) is 20 feet.
5)
Where appropriate, bumper overhang area is provided (extruded curbs), “G” can be subtracted from “C” to determine stall depth.
6)
“G” is the overhang from the wheel side of a wheel stop to the clear point of the front overhang of the vehicle.
7)
Off-street parallel parking spaces shall be a minimum of eight feet wide and 23 feet long. Aisle dimensions for parallel parking are to be a minimum of 12 feet for one-way aisles and 24 feet for two-way aisles.
8)
In the manufacturing/research park and industrial districts the minimum stall width shall be 9.0 feet. In all other districts the minimum stall width shall be 10.0 feet.
DIAGRAM IDENTIFICATION: OFF-STREET PARKING MINIMUM DIMENSIONS IN FEET
A
B
C
D
E
F
G
H
I
Designed Parking Angle
Basic Stall Width
Stall Depth (No overhang)
Aisle Width
Stall Width (Parallel to aisle)
Module Width (No overhang)
Bumper Overhang
Backing Area
Module Intermesh
90 Degrees Two-Way Aisle
8.75
18.0
26.0
9.0
62.0
2.0
5.0
61.0
60 Degrees Two-Way Aisle
8.75
18.5
26.0
10.0
63.0
2.0
NA
60.0
75 Degrees One-Way Aisle
8.75
19.0
22.0
9.0
60.0
2.0
NA
58.0
60 Degrees One-Way Aisle
8.75
18.5
18.0
10.0
55.0
2.0
NA
52.0
45 Degrees One-Way Aisle
8.75
17.0
15.0
12.3
49.0
2.0
NA
45.0
Figure 1: ONE-WAY ANGLE PARKING
Figure 2: TWO-WAY ANGLE PARKING
Figure 3: TWO-WAY 90% HEAD-IN PARKING
(a) 
Sidewalk Used as Wheel Stop. When any parking space uses a raised sidewalk for the wheel stop a minimum additional sidewalk width of three feet is required.
(b) 
Stall markings:
(i) 
Four-inch minimum width for stall markings.
(ii) 
Six-inch maximum width for stall markings.
(iii) 
Standard stall marking color: White.
(Ord. 02-707 § 1; Ord. 03-752 § 1; Ord. 07-854 § 1)

§ 25.95.060 Preferential parking and high-occupancy vehicles.

(1) 
Disabled parking shall be provided as required by state law.
(2) 
For land uses for which this chapter requires a minimum number of parking spaces per employee, at least one of every 20 employee parking spaces, rounded to the nearest whole number, shall be reserved for high-occupancy vehicles.
(3) 
Disabled parking, high-occupancy vehicles, and bicycles shall be given locational priority in parking space layout.
(Ord. 02-707 § 1)

§ 25.95.070 Loading.

Whenever a building is erected, enlarged, or its use changed, and the building’s use requires deliveries which could significantly endanger or impede traffic, adequate off-street loading facilities and maneuvering space for delivery vehicles shall be provided to prevent such danger or impedance.
(1) 
Loading Facilities Location. Off-street loading facilities shall be in all cases on the same lot or parcel of land as the structure they are intended to serve. In no case shall the off-street loading space be part of the area used to satisfy the off-street parking requirements.
No space for loading or unloading vehicles shall be so located that a vehicle using such loading space projects into any public street. Loading spaces shall be provided with access to an alley or street. Any required front, side, or rear yard may be used for loading an off-street loading space unless otherwise prohibited by this code.
(2) 
Loading Berth Design.
(a) 
All off-street loading spaces shall have a minimum unobstructed vertical clearance of not less than 15 feet.
(b) 
Required off-street loading spaces shall be provided in berths which conform to the following minimum specifications:
L
=
Minimum Loading Berth Length = 55 feet
 
 
See DMC § 25.95.070(2)(c) for modified loading berth length
Δ
=
Dock Angle
W
=
Berth Width
A
=
Apron Width
D
=
Clearance
T
=
Total Offset
(c) 
A Type 1 administrative approval may be granted for a single reduced size loading space based on principal building use. If granted, such space shall be no smaller than 10-foot by 40-foot.
DIAGRAM IDENTIFICATION: OFF-STREET LOADING SPACE MINIMUM DIMENSIONS
Dock Angle
(Δ)
Berth Width
(W)
Clearance
(D)
Apron
(A)
Total Offset
(T)
90°
12'
55'
75'
130'
60°
12'
48'
55'
103'
45°
12'
39'
45'
84'
Figure 1: 90-DEGREE DOCKS
Figure 2: ANGLED DOCKS
(3) 
It shall be unlawful to store or accumulate goods in a loading space if it renders the loading space useless for loading and unloading operations.
(Ord. 02-707 § 1; Ord. 03-752 § 1)

§ 25.95.080 Cooperative provisions.

Parking and loading facilities may be provided cooperatively. If the land uses subject to a cooperative parking provision generate their peak parking demand at different times, the administrator may reduce the total parking requirement to a number representative of the greatest demand likely to occur at any one time.
(Ord. 02-707 § 1)

§ 25.95.090 Third-party consents.

If the parking or loading facility is to be on land not owned or leased by the applicant, proof shall be supplied of the owner's consent.
(Ord. 02-707 § 1)

§ 25.95.100 Enforcement.

Compliance with this parking chapter shall be verified before issuance of any land use or building permit.
(Ord. 02-707 § 1)

§ 25.100.010 Purpose.

The purpose of this chapter is to assist effective waste reduction and recycling strategies for residential, commercial and industrial uses within the city, prevent air, land, and water pollution.
(Ord. 02-707 § 1)

§ 25.100.020 Applicability.

All uses shall provide at least one storage enclosure for refuse and recycling receptacles and material generated on-site except that the following uses are exempt from the requirements of this section:
(1) 
Single-family and multifamily dwelling that will be served by curbside recycling at each dwelling unit;
(2) 
Public or private park;
(3) 
Unstaffed facility;
(4) 
Construction site; and
(5) 
Structural alteration or increases in gross floor area that do not exceed 20 percent of the existing building.
(6) 
Sites in which screening of the garbage and recycling area is accomplished by the buildings or other site improvements such that the garbage or recycling area is not visible from an adjacent lot or public street.
(Ord. 02-707 § 1)

§ 25.100.030 Location.

Refuse and recycling enclosures, including underground facilities:
(1) 
May not be located in required yards required by the DMC;
(2) 
May not be located in buffer areas required by the DMC;
(3) 
Shall comply with the requirements of Chapter 25.70 DMC.
(Ord. 02-707 § 1)

§ 25.100.040 Accessibility.

All recyclable storage enclosures that contain receptacles served by commercial collection equipment shall:
(1) 
Be located adjacent to the refuse area, easily accessible to users and have adequate vertical and turning clearances for collection equipment;
(2) 
Not interfere with the primary use of the site including the use by vehicles or pedestrians. The storage area shall not be located in area incompatible with noise, odor and increased pedestrian or vehicular traffic.
(Ord. 02-707 § 1)

§ 25.100.050 Design.

The following provision apply to all storage enclosures:
(1) 
On lots with zero setback requirements, the enclosure shall be located at least five feet from the respective property line;
(2) 
The enclosure shall be designed and finished to match the primary building in terms of design and materials;
(3) 
The enclosure shall be sized for both general refuse and recycling bins;
(4) 
The enclosure shall be located on a flat and level area of a minimum of 100 square feet, surfaced with concrete with a concrete apron and at the same grade as the service vehicle access;
(5) 
Service opening shall be 10 feet wide and designed such that the refuse and recycling bins are not visible from public streets, on-site access route or parking area, or the enclosure shall be fully gated. If gated, a separate three-foot wide pedestrian opening is required unless the service gate includes an automated closing assembly.
(Ord. 02707 § 1)

§ 25.105.010 Purpose.

This chapter has been prepared to express the citizens of DuPont's desire to preserve, restore, and protect critical areas within the city in compliance with the Washington State Growth Management Act (GMA). The GMA requires that critical areas within the city are to be protected by establishing protection standards for minimizing the impact of development of properties within and adjacent to critical areas. The goal of this chapter is to protect and improve the city of DuPont's critical areas for the present and future generations. Wetlands, streams, geologically hazardous areas, aquifer recharge areas, and associated buffers together constitute environmentally critical areas that are of special concern to the city of DuPont.
The purposes of this chapter are to protect the public health, safety and welfare by preventing the adverse environmental impacts of development by:
(1) 
Preserving and protecting critical areas by regulating development adjacent to and within them and their buffers;
(2) 
Educating the public as to the long-term importance of environmentally critical areas and the responsibilities of the city to protect and preserve the natural environment for future generations;
(3) 
Directing a policy of no net loss of wetland and stream function, value, and area within the city;
(4) 
Preventing, to the extent practicable, adverse cumulative impacts to water quality, wetlands, stream corridors, and fish and wildlife habitats using best available science;
(5) 
Encouraging improvements to, and good stewardship of, surface water bodies and watercourses;
(6) 
Protecting the public from injury, loss of life, property damage or financial loss due to flooding, erosion, landslides, seismic events, soil subsidence or steep slope failures;
(7) 
Providing the city of DuPont with information necessary to approve, condition, or deny public or private development proposals;
(8) 
Alerting appraisers, assessors, owners, potential buyers, or lessees to the development limitations of critical areas while also providing city officials, officers and agents with sufficient information to adequately protect critical areas when approving, conditioning or denying;
(9) 
Providing predictability and consistency to the city of DuPont's development review process;
(10) 
Implementing the policies of the State Environmental Policy Act, the Growth Management Act, Chapter 43.21C RCW, the city of DuPont comprehensive plan (adopted 2015 and as amended), and city-related plans and policies.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.020 General provisions.

Regulated critical areas are defined in this chapter and include the following areas and ecosystems: wetlands, critical potable water aquifer recharge areas, fish and wildlife habitat conservation areas and geologically hazardous areas. Frequently flooded areas have been incorporated in the Wetlands and Fish and Wildlife Habitat Conservation Areas sections of this chapter. Critical areas shall also include their protective buffers as set forth in this chapter. The following general provisions will apply to the implementation of this chapter:
(1) 
Abrogation and Greater Restrictions. This chapter shall be so construed as to achieve its purposes without abrogating any existing regulations. However, where this chapter imposes greater restrictions, the provisions of this chapter shall prevail.
(2) 
Interpretation. The provisions of this chapter shall be held to be minimum requirements in their interpretation and application and shall be liberally construed to serve the purposes of this chapter.
(3) 
Compliance with this chapter shall constitute adequate mitigation of impacts to sensitive areas pursuant to the State Environmental Policy Act.
(4) 
This chapter addresses only the city's critical areas – it does not designate any natural resource lands as defined by the Growth Management Act.
(5) 
Regulations in this chapter shall be implemented to protect the public health, safety, and welfare by:
(a) 
Providing special consideration to the conservation or protection measures necessary to preserve or enhance anadromous fish in accordance with RCW 36.70A.172(1).
(b) 
Applying the hierarchal ARC approach to development or alteration impacts in and adjacent to critical areas in order of preference – avoid, reduce, and compensate:
(i) 
Avoid adverse impact entirely, if reasonable;
(ii) 
Reduce adverse impacts, if avoidance is not reasonable:
(A) 
Minimizing or limiting the degree or magnitude of the development and its implementation by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts;
(B) 
Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the development activity;
(iii) 
Compensating for unavoidable adverse critical area impacts by:
(A) 
Rectifying the adverse impact by repairing, rehabilitating, or restoring the affected environment;
(B) 
Compensating for unavoidable impacts by replacing, enhancing, or providing substitute resources or environments.
(c) 
This chapter shall be applied to avoid publicly financed expenditures due to the misuse of critical areas which cause on-site or off-site impacts:
(i) 
Unnecessary maintenance and replacement of public facilities;
(ii) 
Public funding of mitigation for avoidable impacts.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.030 Definitions.

For the purposes of this chapter the following definitions shall apply; these definitions shall be narrowly construed to protect critical areas and their buffers:
.005 
Alteration.
Means, with respect to critical areas, any human-induced action within critical areas or their buffers that impacts the existing condition of the area. Alteration includes, but is not limited to:
(a) 
Grading, filling, dredging, draining, channelizing, cutting, topping;
(b) 
Clearing, relocating, or removing vegetation or fauna;
(c) 
Paving, construction, modifying for surface water management purposes;
(d) 
Human activity that impacts the existing topography, vegetation, hydrology, or wildlife habitat;
(e) 
Alteration does not include walking, passive recreation, nonvegetative or faunal litter removal, regular maintenance of existing trails, or similar activities.
.010 
Applicant.
Means a person who files an application for a development permit under this code and who is either the owner of the land on which that proposed activity would be located, a contract vendee, a lessee of the land, the person who would actually control and direct the proposed activity, or the authorized agent of such a person.
.015 
Aquifer recharge area.
Means geological and soil formations with recharging areas influencing aquifers used for potable water where ground water is vulnerable to contamination.
.020 
Best available science.
Means current scientific information used in the process to designate, protect, or restore critical areas that is derived from a valid scientific process as defined by WAC 365-195-900.
.025 
Best management practices (BMPs).
Means conservation practices or systems of practices and management measures that:
(a) 
Avoid or control soil loss and protect water quality from degradation caused by nutrients, animal waste, toxins, and sediment; and
(b) 
Avoid or minimize adverse impacts to surface water and ground water flow, and circulation patterns; and
(c) 
Avoid or control the movement of sediment and erosion control caused by land alteration activities; and
(d) 
Avoid or minimize adverse impacts to the chemical, physical, and biological characteristics of critical areas.
“BMPs” are those practices as defined by the State of Washington Department of Agriculture, Washington State Department of Ecology, Washington State Department of Health, Washington State Department of Fish and Wildlife, and other professional organizations.
.030 
Buffer.
Means an area on a landscape adjacent to any critical area which:
(a) 
Physically isolates the critical area from surrounding areas using distance, height, visual and/or sound barriers;
(b) 
Acts to minimize risk to the public from loss of life, well-being or property damage resulting from natural disasters associated with the critical area;
(c) 
Protects the functions and values of the critical area from adverse impacts of adjacent activities;
(d) 
Provides shading, input of organic debris and coarse sediments and room for variation and changes in natural critical area characteristics;
(e) 
Provides habitat for wildlife; and/or
(f) 
Provides protection from harmful intrusion.
These buffer functions protect the public from losses suffered when the functions and values of critical areas are degraded.
.035 
Building pad.
Means a portion of a lot which has been altered or designated to provide an acceptable location for a structure on a short plat, subdivision, or lot line revision or other development application.
.040 
Classified species.
Means endangered, threatened and priority species as defined by the State Department of Fish and Wildlife.
.045 
Compensatory mitigation.
Means replacing or rectifying a critical area impact or buffer loss. Compensatory mitigation can include, but is not limited to, restoration or creation of lost or impacted functional values. Enhancement of critical areas may be used for partial compensatory mitigation per the requirements of this chapter.
.050 
Creation.
Refers to a particular mitigation approach for wetland impact which involves the conversion of a persistent upland or shallow water area into a wetland by human activity. Of these, constructed wetlands, also referred to as treatment wetlands, are created for the primary purpose of contaminant or pollution removal from wastewater or runoff.
.055 
Critical areas.
For the purposes of this chapter, “critical areas” include aquifer recharge areas used for potable water, fish and wildlife habitat conservation areas, geologically hazardous areas, and wetlands. Under the GMA, critical areas are to be classified, designated, and protected. In designating and protecting critical areas, the city shall use the best available science, consistent with RCW 36.70A.172. As used in this chapter, the term “critical area” shall also encompass any required buffer or setback associated with that critical area. The Departments of Fish and Wildlife and Ecology, and various federal agencies, offer online mapping tools to help define general critical area locations and may be used for illustrative and informational purposes only.
.060 
Critical drainage corridor or area.
Means an area which has been determined (by the city of DuPont department of public works) to require more restrictive regulation than city-wide standards afford, to mitigate flooding, drainage, erosion, or sedimentation problems which have resulted or will result from the cumulative impacts of development and urbanization. A critical drainage corridor is characterized as a year-round or intermittent naturally flowing watercourse which exhibits but is not limited to one or more of the following characteristics:
(a) 
A stream or watercourse formed by nature or modified by humans;
(b) 
Generally consisting of a defined channel with a bed for a substantial portion of its length on the lot;
(c) 
Watercourses which exhibit the above characteristics and have been channelized or piped; and/or
(d) 
Perched ponds, ravines, or other natural drainage features.
.065 
Critical facility.
Means a facility for which even a slight chance of being located within a hazard area would be too great. Critical facilities include, but are not limited to, schools, hospitals, police, fire, and emergency response installations which produce, use or store hazardous materials or hazardous waste.
.070 
Critical habitat.
Means habitat areas associated with endangered, threatened or priority species as defined by the State Department of Fish and Wildlife. These habitats, if altered, could reduce the likelihood that the species will maintain population levels, survive, and reproduce over the long term. Such habitat areas are documented regarding lists, categories, and definitions of species promulgated by the Washington State Department of Fish and Wildlife or by regulations adopted currently or thereafter by the U.S. Fish and Wildlife Service.
.075 
Critical slope.
Means any area with slopes of 40 percent or steeper that exceed a vertical height of 10 feet. Critical slope is determined by measuring the vertical rise over any 25-foot horizontal run for a specific area that results in a percentage of 40 or more. The critical slope hazard area includes the area of land that extends for 10 feet from the top and toe of the slope.
.080 
Cumulative adverse impact.
Is the impact on the environment which results from the incremental impact of the action when added to other past, present and reasonably foreseeable future actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time.
.090 
DMC.
DuPont Municipal Code.
.095 
Delineation.
Means a process used to locate and mark a critical area's edge or boundary in the field. Delineations are valid for a period of three years from the date that the city approves the delineation report is complete and accurate.
.100 
Development.
Means any alteration, grading, filling, building, earth moving, etc., as well as any structure or utility building operations. Preliminary mapping and survey work that are completed using best management practices and result in insignificant disturbance of vegetation and soil are not considered to be development activity. Development shall not include selective pruning of trees and shrubs for safety and view protection and the removal of noxious weeds; provided, that no heavy equipment is utilized and disturbance of vegetation and soil is insignificant.
.105 
Development proposal.
Means a building permit, clearing and grading permit, shoreline permit, rezone, conditional use permit, variance, lot line revision, planned unit development, short and formal subdivision, street development permit, utility development permit, or any development subject to stormwater drainage requirements under DuPont ordinance.
.110 
Diameter at breast height (d.b.h.).
Means a tree's trunk diameter in inches measured four and one-half feet above the ground. On multi-stemmed or trunked trees, where the diameter at four and one-half feet above grade is greater than at a lower point on the tree, d.b.h. shall be measured at the narrowest diameter below four and one-half feet. In such cases the height of the measurement should be noted. For leaning trees, diameter shall be measured four and one-half feet up the stem in the direction of the lean. On multi-trunked trees, where tree splits into several trunks close to ground level, the diameter shall be the diameter equivalent to the sum of each individual trunk measured according to the principals listed above.
.115 
Director.
Means the director of the city of DuPont department of community development or their designee.
.120 
Enhancement.
Means an action approved by the director and taken with the intention and probable effect of improving the condition and function of a critical area, such as improving environmental functions in an existing, viable critical area by means of increasing plant diversity, increasing wildlife habitat, installing environmentally compatible erosion controls, or removing nonindigenous plant and/or animal species. Enhancement of one function should not result in the degradation of other functions.
.125 
Endangered species.
Means any species which is in danger of extinction throughout all or a significant portion of its range.
.130 
Erosion hazard area.
Means those areas containing soils which, according to the USDA Soil Conservation Service, may experience severe to very severe erosion.
.135 
Exotic species.
Means plants or animals that are not native to the Puget Sound region.
.140 
Fish and wildlife habitat conservation areas.
The following areas are defined as fish and wildlife habitat conservation areas and are identified under this chapter:
(a) 
Areas with which state or federally designated endangered, threatened, and sensitive species have a primary association. Federally designated endangered and threatened species are those fish and wildlife species identified by the U.S. Fish and Wildlife Service and the National Marine Fisheries Service that are in danger of extinction or threatened to become endangered. State designated endangered, threatened, and sensitive species are those fish and wildlife species native to the state of Washington identified by the Department of Fish and Wildlife;
(b) 
Lands and waters containing documented habitats for plant and animal species listed in the Washington Department of Fish and Wildlife's Priority Habitats and Species Program List. Habitats and species of local significance may be added by action of the city council where the value and significance of such species locally can be established and sound scientific evidence can be presented to establish that the species' existence is determined to be locally significant;
(c) 
Public and private tidelands or bedlands are regulated under the City of DuPont 2013 Shoreline Master Program (SMP), as amended;
(d) 
Streams and waters of the state (see WAC 190-080(5)(a)(vi)) that provide habitat to endangered or threatened species, or certain species that have been identified as being sensitive to habitat manipulation, as defined in WAC 222-16-030, Forest Practices Rules and Regulations; lakes, ponds and streams planted with game fish, including those planted under the auspices of a federal, state, local or tribal program; and waters which support priority fish species as identified by the Department of Fish and Wildlife.
.145 
Frequently flooded areas.
Means lands subject to a one percent or greater chance of flooding in any given year or are mapped as such by the Federal Emergency Management Agency or the National Flood Insurance Program, or areas identified by the public works department as critical drainage corridors, lakes, coastal areas, and wetlands.
.150 
Functions.
Means the beneficial roles served by critical areas including, but not limited to: water quality protection and enhancement of fish and wildlife habitat; food chain support; food storage, conveyance, and attenuation; ground water recharge and discharge; erosion control; wave attenuation; aesthetic value protection; and recreation.
.155 
Geologically hazardous areas.
Are susceptible to erosion, sliding or other potentially hazardous geological events. They pose a threat to the health and safety of citizens when used as sites for incompatible development. Geologically hazardous areas include erosion hazard areas, landslide hazard areas, steep slopes, and seismic hazard areas.
.160 
Geotechnical engineer.
Means a practicing geotechnical/civil engineer who has a valid Washington State engineering license and a valid certificate of registration in civil engineering, at least four years of professional employment as a geotechnical engineer with experience in landslide evaluation, and appropriate training and experience as specified in Chapter 18.43 RCW.
.165 
Hillsides.
The side of a hill which is sloped and lies between the foot and apex of the hill.
.170 
Hydric soils.
Means those soils which are saturated, flooded or ponded long enough during the growing season to reduce oxygen conditions, thereby influencing the growth of plants. The presence of hydric soil shall be determined following the criteria and methods described in the approved federal wetland delineation manual and applicable regional supplements adopted under WAC 173-22-080.
.175 
Hydrophytic vegetation.
Means plant life growing in water or soil that is at least periodically deficient in oxygen because of excessive water content.
.180 
Impervious surfaces.
Means areas or surfaces that cannot be easily penetrated by rain or surface water runoff. These areas include structures and roof projections, impervious decks, roads, driveways, and surfaces which substantially reduce and alter the natural filtration characteristics of the soil.
.185 
Infill development.
Means the development of a vacant or underutilized parcel or parcels that are similar in size and configuration to those found in the adjacent developed area. Infill development minimizes the need for new utilities and streets and supports the more efficient delivery of urban services through compact development patterns.
.190 
In-lieu fee.
An approved in-lieu fee program sells compensatory mitigation credits to permittees whose obligations to provide compensatory mitigation are then transferred to the in-lieu fee program sponsor, a governmental or nonprofit natural resource management entity.
.195 
Lakes.
A lake is a large body of water that is surrounded by land. The lake's water can be fresh or, more rarely, salty. A lake is generally accepted as being bigger than a “pond.” In Washington State, lakes larger than 20 acres are commonly managed under the Shoreline Management Act.
.200 
Landslide hazard areas.
Means those areas potentially subject to risk of mass movement due to a combination of geologic, topographic, and hydrologic factors, including historic slope failures. These areas may be identified in the City of DuPont Comprehensive Plan, U.S. Geological Service Maps, the Department of Ecology Coastal Zone Atlas, or through site-specific indicators or conditions.
.205 
Low Impact Development Technical Guidance Manual for Puget Sound.
Means the most current manual developed by the Puget Sound Action Team that describes environmentally friendly techniques to develop land and manage stormwater runoff.
.210 
Mass wasting.
Also known as slope movement or mass movement, is the geomorphic process by which soil, sand, and rock move downslope typically as a mass, largely under the force of gravity, but frequently affected by water and water content.
.215 
Mitigation.
Means a process used to reduce the severity of impacts from activities that potentially affect critical areas by the following means:
(a) 
Avoiding the impact altogether by not taking a certain action or parts of an action;
(b) 
Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts;
(c) 
Rectifying the impact by repairing, rehabilitating, or restoring the affected environment;
(d) 
Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action;
(e) 
Compensating for the impact by replacing, enhancing, or providing substitute resources or environments; and/or
(f) 
Monitoring the impact and taking appropriate corrective measures.
.220 
Monitoring.
Is defined as the establishment and operation of appropriate devices, methods, systems and procedures necessary to monitor, compile, and analyze data on the condition of wetlands or other critical areas.
.225 
Native vegetation.
Means plant species which are indigenous to the Puget Sound region.
.230 
Noxious weed.
Means any plant which is invasive – for example, blackberries or nettles – and listed on the state noxious weed list in Chapter 16-750 WAC.
.235 
Off-site compensation.
Means to compensate for lost or degraded critical areas by creating or restoring these areas at or adjacent to the site on which the impacts were located.
.240 
On-site compensation.
Means to compensate for lost or degraded critical areas by creating or restoring similar critical areas at a location outside the immediate area of the impacted critical area.
.245 
Out-of-kind mitigation.
Means to compensate for lost or degraded critical areas by creating or enhancing critical areas whose characteristics do not closely approximate those destroyed or degraded by a development activity.
.250 
Ordinary high water mark.
(OHWM) as defined in the Shoreline Management Act (SMA) is a biological vegetation mark. Ecology's rules include a default tidal or freshwater elevation line for locations where the OHWM cannot be found.
.255 
Peer review.
Means a review of a submitted critical areas report by a second practicing, licensed professional not associated with the original submittal selected and retained by the city. The second review must verify the adequacy of the information, the adequacy of the analysis, and the completeness of the original checklist. The cost for the peer review will be borne by the applicant.
.260 
Pond.
A body of standing water, either natural or artificial, that is smaller than a lake.
.265 
Pond, perched.
A pond or lake that is isolated above the ground water table by a layer of impervious soil such as rock or clay.
.270 
Practicable alternative.
Means an alternative available and capable of being carried out after taking into consideration cost, existing technology, and logistics in light of overall project purposes, and having less impacts to critical areas. It may include using an area not owned by the applicant which can reasonably be obtained, utilized, expanded, or managed in order to fulfill the basic purpose of the proposed development.
.275 
Pretreatment facilities.
See “Wetlands, constructed.”
.280 
Procedures manual.
Means a document that may be prepared by the director, which outlines the process for determining whether critical areas are present on a lot as well as specific application and procedural details for permitting, site development and other requirements as described in this chapter.
.285 
Qualified critical area consultant.
Means a person who has the qualifications specified below to conduct critical areas studies pursuant to this chapter, and to make recommendations for critical area mitigation. For areas of potential geologic instability, the qualified critical areas consultant shall be an engineering geologist with a Washington specialty license in engineering geology as specified in Chapter 18.220 RCW or geotechnical engineer; provided, that:
(a) 
An engineering geologist may provide a study including interpretation, evaluation, analysis, and application of geological information and data and may predict potential or likely changes in types and rates of surficial geologic processes due to proposed changes to a location, and mitigation measures, provided it does not contain specific engineering design; and
(b) 
Engineering geologists may not provide engineering recommendations or design recommendations, but may contribute to a complete geotechnical report that is co-sealed by a geotechnical engineer.
(c) 
For wetlands the qualified consultant shall possess, at a minimum, a Bachelor of Science or Bachelor of Arts or equivalent degree in hydrology, soil science, botany, ecology, or related field, and have at least two years of full-time work experience as a wetlands professional including delineating wetlands using state or federal manuals, preparing wetland reports, conducting function assessments, and developing and implementing mitigation plans.
.290 
Rehabilitation.
Means actions to return a critical area to a state in which its stability, functions and values are improved to more closely approach its unimpacted state. This definition is closely aligned with restoration (DMC § 25.105.030.305).
.295 
Repair.
Means activities that restore the character, size, or scope of a project only to the previously authorized condition.
.300 
Reports and surveys.
Means required documents prepared by a professional to delineate areas and make recommendations for critical area delineations and related regulations. Examples of these reports and surveys include, but are not limited to:
(a) 
Site inventory and/or survey;
(b) 
Application and site construction plan;
(c) 
Critical area report;
(d) 
Site mitigation plan;
(e) 
Stormwater management plan.
.305 
Restoration.
Means actions to bring a critical area to a state in which its stability, functions and values approximate its unaltered state.
.310 
Retention/detention facility.
Means a drainage facility designed either to:
(a) 
Retain runoff for a considerable length of time and release via evaporation, plant transpiration, and/or infiltration into the ground; or
(b) 
To detain runoff for a short period of time, and release to an associated surface/stormwater system at a rate not exceeding predevelopment (historical) flows.
.315 
Seismic hazard areas.
Includes areas subject to severe risk of damage because of seismic induced ground shaking, slope failure, settlement, soil liquefaction or surface faulting. Ground shaking is a primary risk, followed by slope failure. Soils on slopes greater than 40 percent that are expected to be seasonally or perpetually saturated pose a specific risk of settlement, movement, or liquefaction. When saturated, these soils tend to be cohesionless and are unsuitable for foundations.
.320 
Setback.
Means the distance specified by these regulations between a structure and a buffer, property line, road, etc.
.325 
Significant vegetation.
Means any tree with a diameter of six inches or more at breast height, native “understory” vegetation from four to 10 feet in height, and any species listed in the Washington State Department of Wildlife Priority Habitats and Species Program Report.
.330 
Site.
Means the entire lot, series of lots or parcels on which a development is located or proposed to be located, including contiguous undeveloped lots or parcels under common ownership of the applicants, or the client(s) represented by the applicant.
.335 
Slope.
Means an inclined ground surface, the inclination of which is expressed as a ratio (percentage) of vertical distance to horizontal distance by the following formula:
Vertical distance/Horizontal distance x 100 = % slope
.340 
Species of local significance.
Means those species that are of local concern due to their population status or their sensitivity to habitat manipulation or that are game species.
.345 
Steep slope.
As used in this chapter means a geologically hazardous area exhibiting all three of the following characteristics:
(a) 
Slopes steeper than 15 percent;
(b) 
Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment or bedrock; and
(c) 
Springs or ground water seepage.
.350 
Stormwater Management Manual.
Means the 2012 Department of Ecology Stormwater Management Manual for Western Washington and as amended.
.355 
Swale.
Means a shallow drainage conveyance facility with relatively gentle side slopes, and generally flow depths of less than one foot.
.360 
Terrestrial habitats and species.
Terrestrial habitats are entirely located on land, as compared with aquatic habitat, which is entirely in the water. Terrestrial species are those animals that reside and rely on the terrestrial (land-based habitats). Some species share terrestrial and aquatic habitats for varying life cycles or stages. Waterfowl and amphibians are good examples.
.365 
Threatened species.
Means any species which is likely to become an endangered species within the foreseeable future throughout all or a significant portion of its range.
.370 
Top of slope and toe of slope.
The “top of slope” is a distinct, topographical break in slope that separates slopes inclined at less than 40 percent from slopes 40 percent or steeper. When no distinct break exists, the top of slope is the uppermost limits of the area where the ground surface drops 10 feet or more vertically within a horizontal distance of 25 feet. The “toe of slope” is a distinct topographical break in slope that separates slopes inclined at less than 40 percent from slopes 40 percent or steeper. When no distinct break exists, the toe of slope of a steep slope is the lowermost limit of the area where the ground surface drops 10 feet or more vertically within a horizontal distance of 25 feet.
.375 
Utilities.
Means conduits, lines, and facilities used to distribute, collect, transmit, or control electrical power, natural gas, petroleum products, information (telecommunications), water, and sewage.
.380 
Wetland classification.
For the purposes of general inventory, wetlands are defined by the criteria defined in the approved federal wetland delineation manual and applicable regional supplements, adopted under WAC 173-22-080 as amended.
.385 
Wetlands, constructed, or constructed wetlands.
Means intentional construction of a wetland on an area that was previously nonwetland for purposes of wetlands mitigation, wastewater or stormwater treatment, and managed as such.
.390 
Wetland or wetlands.
Means those areas that are inundated or saturated by ground or surface water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include bogs, swamps, marshes, ponds, and similar areas. Wetlands do not include those artificial wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created because of construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from nonwetland areas created to compensate for wetland impacts, including conversion of wetlands to mitigate (RCW 36.70A.030(20)).
.395 
Wetland edge.
Means the boundary of a wetland as delineated based on the definitions contained in the Washington State Wetland Identification and Delineation Manual (Ecology Publication No. 96-94, adopted under WAC 173-22-080).
.400 
Wetland hydrology.
Means the characteristics of water movement on, over and through a wetland system; the science dealing with the properties, distribution, and circulation of water through a wetland.
.405 
Wetlands, isolated, or isolated wetlands.
Means wetlands that meet the following criteria:
(a) 
Are outside of and not contiguous to any 100-year floodplain of a lake, river, or stream; and
(b) 
Have no contiguous hydric soil or hydrophytic vegetation between the wetland and any surface water; and
(c) 
Have no surface water connection to lake, stream, estuary, or marine water body.
.410 
Wetland rating.
The rating for a wetland is as defined in the Washington State Wetlands Rating System for Western Washington – 2014 Update (Ecology Publication No. 14-06-029, October 2014, as amended).
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.040 Applicability.

(1) 
This chapter establishes regulations for the protection of properties which contain or are adjacent to critical areas. Critical areas are those which are now or may in the future be identified under the provisions of this chapter. The provisions of this chapter apply to development projects and actions undertaken by individuals and private or public entities. Actions may include, but are not limited to, landscaping and planting of exotic or ornamental vegetation; erection of garden structures such as sheds, fences, gazebos, etc.; clearing or alteration of existing natural vegetation; habitat enhancement or restoration; other alteration of property within or adjacent to a critical area; or any submitted development project.
(2) 
Conflicting Provisions. The regulations in this chapter do not abrogate the DuPont Municipal Code but do supersede any conflicting regulations in the DuPont Municipal Code. If more than one regulation applies to the subject property, then the regulation that provides the greatest protection to critical areas applies. For properties within jurisdiction of the Shoreline Management Act, the regulations of the City of DuPont Shoreline Master Program supersede any conflict in regulation in this chapter.
(3) 
Other Jurisdictions. Nothing in these regulations eliminates or otherwise affects the responsibility of the applicant or property owner to comply with applicable local, state, and federal laws regulating development activities in critical areas, as herein defined.
(4) 
SEPA Compliance. Nothing in these regulations or the decisions made pursuant to these regulations affects the authority of the city to review, condition, and deny projects under the State Environmental Policy Act, Chapter 43.21C RCW.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.050 Critical areas.

Within the jurisdiction of the city of DuPont, there are four critical area categories known to exist: wetlands and lakes; fish and wildlife habitat conservation areas; landslide and erosion hazard areas; and aquifer recharge areas. This section provides: descriptions and requirements for critical area identification and delineation; required buffers for critical areas; required mitigation sequence and measures if development or alteration impacts are unavoidable in or adjacent to a critical area; and requirements for management and protection of critical areas.
(1) 
Wetlands and Lakes. Wetland and lake ecosystems in the city of DuPont support a diverse, unique, and rich group of plant and animal life. Habitat is especially productive at the interface between land and water ecosystems. This interface fluctuates seasonally based on hydrologic conditions and is subject to localized flooding at times which accentuates the function and importance of assigned buffers. Some species require wetland habitats for breeding, nesting, rearing of young, and feeding. Wetlands in DuPont also have a positive effect on water quality downstream or in aquifers by removing pollutants through the processes of sediment trapping, nutrient removal, and chemical detoxification. Wetlands also regulate the flow, retention, and release of stormwater to surface and ground water systems. Eleven of the 14 wetlands historically identified in DuPont appear to be hydrologically connected to ground water sources. Development in or adjacent to wetlands can, therefore, result in: increased soil erosion and sedimentation of downstream water bodies; degraded water quality in streams and aquifers; loss of wildlife habitat; loss of ground water discharge and recharge areas; loss of stormwater retention and detention capacity. Development or alterations in or adjacent to, or in close enough proximity as determined by the director to, wetlands, lakes, and their riparian buffers must incorporate the ARC mitigation sequencing during the planning process. DuPont encourages impact avoidance as the preferred alternative to any proposal.
(a) 
Wetland Categories.
(i) 
Identification of wetlands and delineation of their boundaries pursuant to this chapter shall be done in accordance with the approved federal wetland delineation manual and applicable regional supplement. All areas within the city meeting the wetland designation criteria in that procedure are hereby designated critical areas and are subject to the provisions of this chapter. Wetland delineations are valid for five years; after which time the director may determine whether a revision or additional assessment is necessary.
(ii) 
Wetlands shall be rated according to the Washington State Department of Ecology wetland rating system, as set forth in the Washington State Wetland Rating System for Western Washington: 2014 Update (Ecology Publication No. 04-06-029, or as revised and approved by Ecology), which contains the definitions, methods and criteria for determining a wetland's categorization as Category I, II, III or IV.
(iii) 
Wetland rating categories shall not change due to illegal modifications.
(b) 
Wetland Buffers.
(i) 
A buffer shall be established adjacent to designated wetland areas. The purpose of the buffer area shall be to protect the integrity, functions, and values of the wetland area. Buffer widths shall be appropriate for the sensitivity of the wetland and for the risks associated with land use development. The following standard buffers have been established in accordance with the best available science (codified at WAC 365-195-900 through 365-195-925). They are based on the category of wetland and the combined function score as determined by a qualified wetland professional.
(A) 
Category I, 200 feet.
(B) 
Category II, 100 feet.
(C) 
Category III, 75 feet.
(D) 
Category IV, 50 feet.
(ii) 
Increased buffer widths may be required by the city on a case-by-case basis when necessary to protect wetlands functions and values. This determination shall be supported by a critical area report or other appropriate documentation showing that it is reasonably related to protection of the functions and values of the wetland, or when:
(A) 
The buffer is within 25 feet of the top or toe of a slope that is greater than 30 percent; or
(B) 
The slope is susceptible to erosion and standard best management practices (BMPs) and erosion-control measures will not prevent adverse impacts to the wetland.
(iii) 
Buffer width averaging may be allowed by the city in accordance with an approved critical area report; provided, that all of the following criteria are met:
(A) 
It will not reduce protection to wetlands;
(B) 
The total area contained in the buffer after averaging on the development proposal site does not decrease;
(C) 
The buffer at its narrowest point is not less than 75 percent of the standard width; and
(D) 
The critical area report shall describe the current functions and values of the wetland and its buffer, and the measures that will be taken to ensure that there is no loss of wetland function due to averaging.
(iv) 
Reduced buffers may be allowed, with enhancements, in accordance with an approved critical area report provided:
(A) 
The existing condition of the buffer is degraded; and
(B) 
Additional protection to the wetland is provided through the implementation of a buffer enhancement plan.
(v) 
Buffer enhancement may include, but is not limited to:
(A) 
Planting native vegetation that would increase value for fish and wildlife habitat, improve water quality, or provide aesthetic or recreational value;
(B) 
Enhancement of wildlife habitat by incorporating structures that are likely to be used by wildlife, including wood duck boxes, bat boxes, nesting platforms, snags, rootwads, stumps, birdhouses, and nesting areas;
(C) 
Removing nonnative plant species and noxious weeds from the buffer area and replanting the area.
(c) 
Allowed Activities in Wetlands and Wetland Buffers.
(i) 
Wetland enhancement, rehabilitation, or restoration or activities that contribute to the enhancement, rehabilitation, or restoration of DuPont's wetlands and their associated stream complexes may be allowed if accomplished according to a plan, approved by the director, for its design, implementation, maintenance and monitoring prepared by a civil engineer and a qualified biologist and carried out under the direct supervision of a qualified biologist.
(ii) 
Invasive species removal not involving mechanical methods or chemicals.
(iii) 
Garbage, litter, and trash removal completed by use of hand tools.
(iv) 
Hazard tree removal when deemed necessary by a certified arborist.
(v) 
Passive recreation activities (such as bird watching, hiking, canoeing, and other similar activities).
(vi) 
Alteration of other wetlands (other than Class I wetlands) when it can be demonstrated by the applicant through a wetlands analysis report and mitigation plan that the mitigation requirements of subsections (1)(d) and (e) of this section can be met.
(d) 
Wetland Mitigation. Other than alterations allowed under subsection (1)(c) of this section, alterations of other wetlands are allowed only when the applicant can meet the mitigation standards of this subsection.
(i) 
Requirements for Compensatory Wetland Mitigation.
(A) 
Compensatory mitigation for alterations to wetlands shall be used only:
(I) 
When impacts cannot be addressed by avoidance of impact;
(II) 
And shall achieve equivalent or greater biological functions resulting in no net loss of wetland function.
(B) 
Compensatory mitigation plans shall be consistent with this chapter and Wetland Mitigation in Washington State, Part 2: Developing Mitigation Plans, Version 1 (Ecology Publication No. 06-06-011b) or as amended, and Selecting Wetland Mitigation Sites Using a Watershed Approach (Western Washington) (Publication No. 09-06-32, Olympia, WA, December 2009).
(C) 
A performance bond or other approved financial surety is required before any project permits are issued. The purpose of the financial surety is to hold an applicant accountable for implementing the mitigation and monitoring plans. The release of financial surety is contingent on satisfactory completion of the proposed mitigation construction and monitoring by the applicant.
(D) 
Mitigation ratios shall be consistent with subsection (1)(d)(vii) of this section.
(ii) 
Compensating for Lost or Affected Functions. Compensatory mitigation shall address the functions affected by the proposed project, with an intention to achieve functional equivalency or improvement of functions. The goal shall be for the compensatory mitigation to provide similar wetland functions as those lost, except when either:
(A) 
The lost wetland provides minimal functions, and the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide functions shown to be limiting within a watershed through a formal Washington State watershed assessment plan or protocol; or
(B) 
Out-of-kind replacement will best meet formally identified regional goals, such as replacement of historically diminished wetland types or salmon habitat.
(iii) 
Preference of Mitigation Actions. Mitigation for lost or diminished wetland and buffer functions shall rely on the types below in the following order of preference:
(A) 
Restoration (reestablishment and rehabilitation) of wetlands.
(I) 
The goal of reestablishment is returning natural or historic functions to a former wetland.
(II) 
The goal of rehabilitation is repairing natural or historic functions of a degraded wetland.
(B) 
Creation (establishment) of wetlands on disturbed upland sites such as those with vegetative cover consisting primarily of nonnative species or noxious weeds.
This should be attempted only when there is an adequate source of water and it can be shown that the surface and subsurface hydrologic regime is conducive to the wetland community that is anticipated in the design.
(C) 
Enhancement of significantly degraded wetlands in combination with restoration or creation.
Enhancement should be part of a mitigation package that includes replacing the altered area and meeting appropriate ratio requirements. Applicants proposing to enhance wetlands or associated buffers shall demonstrate:
(I) 
How the proposed enhancement will increase the wetland’s/buffer’s functions and values;
(II) 
How this increase in function will adequately compensate for the impacts; and
(III) 
How other existing wetland functions and values at the mitigation site will be protected.
(D) 
Preservation of high quality, at-risk wetlands as compensation is generally acceptable when done in combination with restoration, creation, or enhancement; provided, that a minimum of 1:1 acreage replacement is provided by reestablishment or creation. Ratios for preservation in combination with other forms of mitigation generally range from 10:1 to 20:1, as determined on a case-by-case basis, depending on the quality of the wetlands being altered and the quality of the wetlands being preserved.
(iv) 
Location of Compensatory Mitigation. Mitigation actions shall be conducted within the same subdrainage basin and on the site of the development or alteration except when all of the following apply:
(A) 
There are no reasonable on-site or in subdrainage basin opportunities, or on-site and in subdrainage basin opportunities do not have a high likelihood of success due to development pressures, adjacent land uses, or on-site buffers or connectivity are inadequate;
(B) 
On-site mitigation would require elimination of high quality upland habitat;
(C) 
Off-site mitigation has a greater likelihood of providing equal or improved wetland functions; and
(v) 
Off-site locations shall be in the same subdrainage basin and in the same water resource inventory area (WRIA) unless:
(A) 
Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions and values have been established and strongly justify location of mitigation at another site; or
(B) 
Credits from a state-certified wetland mitigation bank are used as compensation, and the use of credits is consistent with the terms of the certified bank instrument;
(C) 
If compensatory wetland or wetland buffer mitigation is proposed off site, a signed statement of consent is required from owners of all affected properties. This statement shall be submitted to the city and a notice recorded with the Pierce County assessor prior to approval of a compensatory mitigation plan.
(vi) 
Timing of Compensatory Mitigation. Mitigation shall be completed immediately following disturbance and prior to use or occupancy of the activity or development causing the wetland alteration. Construction of mitigation projects shall be timed to reduce impacts to existing wildlife and flora.
(vii) 
Wetland Mitigation Ratios. In the following table the first number indicates the acreage of replacement wetlands and the second number indicates the acreage of wetlands altered:
Category and Wetland Type
Creation
Rehabilitation
Enhancement
Category I
4:1
8:1
16:1
Category II
3:1
6:1
12:1
Category III
2:1
4:1
8:1
Category IV
1.5:1
3:1
6:1
(e) 
Wetland Out-of-Kind Mitigation. Out-of-kind mitigation is allowed when the impacts from a proposal can be mitigated in a manner that achieves a higher watershed function. In such instances, a habitat management and restoration plan will be required to address the proposed mitigation benefits and compensatory results of out-of-kind mitigation.
(2) 
Fish and Wildlife Habitat Conservation Areas. The Washington State Department of Fish and Wildlife defines, identifies and maps priority habitat and species and prepares management recommendations for them. Priority habitat types found in urban growth areas like DuPont include wetlands, critical drainage corridors, marine bluffs, and urban natural open space. Fish and wildlife habitat conservation areas are defined in DMC § 25.105.030.140 and are consistent with state agency definitions. Some of these areas, especially wetlands and critical drainage corridors, provide excellent animal and bird habitat areas. This section outlines techniques for the city to use in evaluating land uses and protecting habitat areas which may be adversely impacted by these uses. These regulations are intended to provide reasonable measures to protect and conserve the habitat of fish and wildlife species and thereby maintain or increase their populations within DuPont.
(a) 
Stream and Stream Buffer Alterations.
(i) 
If alterations to or development in streams and stream buffers are not reasonably avoidable, alterations or development may be allowed only if the following requirements are met:
(A) 
Alterations may only be permitted if based upon a study meeting the necessary requirements as determined and approved by the director;
(B) 
The applicant shall notify affected communities and native tribes of proposed alteration(s) prior to any alteration if the stream is in a flood hazard area. The applicant shall submit evidence of such notification to the Federal Emergency Management Agency;
(C) 
There shall be no introduction of any plant or wildlife which is not indigenous to the state into any stream or buffer unless authorized by a state or federal permit or approval by the city;
(D) 
Unavoidable impacts to streams and stream functions shall be mitigated to achieve no net loss of stream function.
(ii) 
Utilities may be allowed in stream buffers if:
(A) 
No practical alternative location is available;
(B) 
The utility corridor meets any additional requirements set forth in administrative rules and this chapter including, but not limited to, requirements for installation, replacement of vegetation and maintenance;
(C) 
The requirements for sewer utility corridors shall also apply to streams; and
(D) 
Joint use of an approved sewer utility corridor by other utilities may be allowed.
(iii) 
The following surface water management activities and facilities may be allowed in stream buffers as follows:
(A) 
Surface water discharge to a stream from a detention facility, presettlement pond or other surface water management activity or facility may be allowed if the discharge is in compliance with the Surface Water Design Manual;
(B) 
Public and private trails may be allowed in the stream buffers only upon adoption of administrative rules consistent with the following:
(I) 
The trail surface shall not be made of impervious materials, except that public trails may be made of impervious materials if required to comply with the Americans with Disabilities Act (ADA); or to provide for emergency access to remote areas; and
(II) 
Buffers shall be expanded, where practicable, equal to the width of the trail corridor including disturbed areas.
(iv) 
Stream crossings may be allowed if:
(A) 
Road crossings use bridges or other construction techniques which do not disturb the stream bed or bank, except that bottomless culverts or other appropriate methods demonstrated to provide fisheries protection may be used if the applicant demonstrates that such methods and their implementation will pose no harm to the stream or inhibit migration of fish;
(B) 
Stream crossings are constructed during the summer low flow and are timed to avoid stream disturbance during periods when use is critical to salmonids;
(C) 
Crossings do not occur over salmonid spawning areas unless the city determines that no other possible crossing site exists;
(D) 
Bridge piers or abutments are not placed within the FEMA floodway or the ordinary high water mark;
(E) 
Crossings do not diminish the flood-carrying capacity of the stream;
(F) 
Underground utility crossings are laterally drilled and located at a depth of four feet below the maximum depth of the scour for the base flood predicted by a civil engineer licensed by the state of Washington; and
(G) 
Crossings are minimized and serve multiple purposes and properties whenever possible.
(v) 
For any stream alteration allowed by this section, the applicant shall demonstrate, based on information provided by a civil engineer and/or a qualified biologist, that:
(A) 
The equivalent base flood storage volume and function will be maintained;
(B) 
There will be no adverse impact to local ground water;
(C) 
There will be no adverse increase in velocity;
(D) 
There will be no interbasin transfer of water;
(E) 
There will be no adverse hydrologic disruption of surface water flow regimes;
(F) 
Requirements set out in the mitigation plan are met;
(G) 
The relocation conforms to other applicable laws; and
(H) 
All approved stream alteration work will be carried out under the direct supervision of a qualified biologist.
(b) 
Stream enhancement, rehabilitation, or restoration may be allowed if accomplished according to an approved plan by the director, for its design, implementation, maintenance and monitoring prepared by a civil engineer and a qualified biologist and carried out under the direct supervision of a qualified biologist pursuant to provisions.
(c) 
Mitigation Requirements.
(i) 
Mitigation shall be required when a stream or its buffer is altered in violation of law or without any specific permission or approval by the city. A mitigation plan to offset impacts shall demonstrate that:
(A) 
The stream has been degraded and will not be further degraded by the enhancement, rehabilitation, or restoration activity;
(B) 
The enhancement, rehabilitation, or restoration will reliably and demonstrably improve the water quality and fish and wildlife habitat of the stream;
(C) 
The enhancement, rehabilitation, or restoration will have no lasting, significant, adverse impact on any stream functions; and
(D) 
The enhancement, rehabilitation, or restoration will assist in stabilizing the stream channel.
(ii) 
The following minimum requirements shall be met for the enhancement, rehabilitation, or restoration of a stream:
(A) 
All approved stream work shall be carried out under the direct supervision of a qualified biologist;
(B) 
Basin analysis shall be performed to determine hydrologic conditions;
(C) 
The natural channel dimensions shall be replicated including their depth, width, length and gradient at the original location, and the original horizontal alignment (meander lengths) shall be replaced;
(D) 
The bottom shall be restored with identical or similar materials;
(E) 
The bank and buffer configuration shall be restored to its original condition;
(F) 
The channel, bank and buffer areas shall be replanted with vegetation native to the city which replicates the original vegetation in species, sizes and densities; and
(G) 
The original biologic functions of the stream shall be recreated to the extent possible.
(iii) 
The requirements in subsection (2)(c)(ii) of this section may be modified if the applicant demonstrates to the satisfaction of the director that a greater biological function can otherwise be obtained.
(iv) 
Replacement or enhancement shall be required when a stream or buffer is altered pursuant to an approved development proposal or study meeting the necessary requirements as determined by the director. There shall be no net loss of stream functions on a development proposal site and no impact on stream functions above or below the site due to approved alterations.
(v) 
The requirements which apply to the restoration of streams in subsection (2)(c)(ii) of this section shall also apply to the relocation of streams, unless the applicant demonstrates to the satisfaction of the director that a greater biological function can be obtained by modifying these requirements.
(vi) 
Replacement or enhancement for approved stream alterations shall be accomplished in streams and on the site unless the applicant demonstrates to the satisfaction of the director:
(A) 
Enhancement or replacement on the site is not possible;
(B) 
The off-site location is in the same drainage subbasin as the original stream; and
(C) 
Greater biological and hydrological functions will be achieved.
(vii) 
Surface water management or flood control alterations shall not be considered “enhancement” unless other functions are simultaneously improved.
(d) 
Performance Standards Applicable to Development in Fish and Wildlife Habitats.
(i) 
Development activities allowed in fish and wildlife habitat conservation areas shall be consistent with the species located there, and shall be regulated additionally by restrictions defined in applicable federal, state and local regulations regarding the species and their habitat.
(ii) 
Habitat conservation areas identified in required habitat management plans are to be conserved for the management and maintenance of fish and wildlife habitat. Habitat conservation areas may overlap with other identified critical areas. Likely areas of overlap include critical drainage corridors, geologically hazardous areas, and wetlands.
(iii) 
When habitat areas overlap with other critical areas, all the performance standards established for the overlying critical area(s) shall apply. If multiple critical areas overlap in an area, the most restrictive conditions shall apply.
(iv) 
Habitat management plans required under this section shall incorporate mitigation recommendations developed in consideration of the Washington State Department of Fish and Wildlife's Aquatic Habitat Guidelines, the Washington State Department of Ecology's Stormwater Management Manual for the Puget Sound (2012), and Chapter 5 of the Low Impact Development Technical Guidance Manual for the Puget Sound (2012).
(e) 
Performance Standards for Terrestrial Habitats and Species.
(i) 
A habitat management plan shall be required for any development in or adjacent to areas identified as habitat for endangered, threatened or sensitive species and for breeding or nesting habitat of priority species. The plan shall incorporate mitigation recommendations developed in consideration of Washington Department of Fish and Wildlife habitat recommendations.
(ii) 
The habitat management plan shall show the exact location and extent of habitat conservation areas and any alteration of any habitat areas that may reduce the likelihood that the above listed species will survive or reproduce.
(iii) 
Development in or adjacent to areas used by state priority species shall be designed, located and constructed in consideration of Washington Department of Fish and Wildlife habitat recommendations, and consistent with best management practices (BMPs), including measures to avoid impacts due to construction noise, light and timing.
(iv) 
Developments occurring within the shoreline jurisdiction shall comply with the DuPont shoreline master program, as amended.
(v) 
To preserve areas of native vegetation and to allow for habitat connectivity, the following development standards shall also be applied in terrestrial habitat conservation areas that lie within the shoreline jurisdiction:
(A) 
Total impervious surface area shall be limited to 40 percent or 4,000 square feet, whichever is less; and
(B) 
At least 25 percent of the lot shall be required to be retained or restored in native vegetation.
(f) 
Performance Standards for Marine Habitats and Species (Refer to City of DuPont SMP).
(i) 
Development in areas waterward of the ordinary high water mark shall require a habitat analysis and shall give special consideration to the preservation and enhancement of anadromous fish habitat.
(ii) 
Development proposals shall be designed to first avoid and then minimize environmental impacts.
(iii) 
Unavoidable impacts to marine habitat and environmental processes shall be mitigated to achieve no net loss of habitat function.
(iv) 
A habitat management plan shall be required for any development likely to cause impacts to marine habitat and environmental processes. The plan shall incorporate mitigation recommendations consistent with Washington Department of Fish and Wildlife habitat recommendations.
(v) 
All in-water development shall meet the requirements of the hydraulic project approval (HPA) process administered by the Washington Department of Fish and Wildlife.
(g) 
Buffers or Setbacks.
(i) 
A 100-foot buffer is required on each side of a stream as measured from the ordinary high water mark (OHWM). To retain adequate natural habitat for classified species the buffer widths may be adjusted on a case-by-case basis, and the process and justification shall be described in the required habitat management plan.
(ii) 
Buffers shall consider the Washington Department of Fish and Wildlife priority habitat and species management recommendations.
(iii) 
Buffer widths may be increased by the director if species present are sensitive to or endangered by habitat alteration, or if the area supports unique or rare plant communities, or contains rearing and nesting sites for endangered, threatened or priority species.
(iv) 
Buffer widths may be reduced by the director if the project includes buffer enhancement as part of an approved habitat management plan or if it is found that the affected property would be denied reasonable use.
(v) 
Building setback lines shall be measured from the outside edge of required buffers and no setback shall be less than 15 feet from an established buffer.
(h) 
Mitigation or Compensation for Terrestrial Habitats and Species.
(i) 
Mitigation measures could include, but are not limited to:
(A) 
Establishment of buffer zones;
(B) 
Preservation of critically important plants and trees;
(C) 
Limitation of access to habitat area;
(D) 
Seasonal restriction of construction activities;
(E) 
Establishing a timetable for periodic review of the development;
(F) 
Using BMPs to avoid or reduce impacts;
(G) 
Reducing the size, scope, configuration, or density of the project;
(H) 
Participation in the city's in-lieu fee program (see DMC § 25.105.060).
(i) 
Report Required. A habitat management plan shall be required for:
(i) 
Any development in or adjacent to areas identified as habitat for endangered, threatened or sensitive species or for breeding or nesting habitat of priority species.
(ii) 
Development in areas waterward of the ordinary high water mark shall require a habitat analysis.
(iii) 
Any compensatory mitigation proposed for stream enhancement, rehabilitation, or restoration associated with out-of-kind mitigation for wetland impacts.
(iv) 
Unless otherwise exempt under this chapter, a permit application to develop in the regulatory floodplain shall include an assessment of the impact of the project on federal, state or locally protected species and habitat, water quality and aquatic and riparian habitat. The assessment shall be:
(A) 
A biological evaluation or biological assessment developed per 50 CFR 402.12 to initiate federal interagency consultation under Endangered Species Act Section 7(a)(2); or
(B) 
Documentation that the activity fits within Section 4(d) of the Endangered Species Act; or
(C) 
Documentation that the activity fits within a habitat conservation plan approved pursuant to Section 10 of the Endangered Species Act, where any such assessment has been prepared or is otherwise made available; or
(D) 
An assessment prepared in accordance with Regional Guidance for Floodplain Habitat Assessment and Mitigation, FEMA Region X, 2013. The assessment shall determine if the project would adversely affect:
(I) 
Species that are federal, state or local listed as threatened or endangered;
(II) 
The primary constituent elements for critical habitat, when designated;
(III) 
Essential fish habitat designated by the National Marine Fisheries Service;
(IV) 
Fish and wildlife habitat conservation areas;
(V) 
Other protected areas and elements necessary for species conservation.
(3) 
Geologically Hazardous Areas. The bluffs, ravines and hillsides of DuPont are distinctive physical features that contribute to the natural beauty of the city. These areas provide open space and viewing points of extraordinary vistas and serve to define the boundaries between different parts of the city. These areas are stabilized by existing vegetation, which moderate the effects of runoff and erosion from wind and rain. The natural drainage patterns on hillsides contribute to the amount of ground water recharge. Development on hillsides can, therefore, result in: loss of slope and soil stability, causing increased erosion and the potential for slope failures; increased runoff from removal of vegetation, which reduces the percolation of precipitation into the soil and intensifies erosion; destruction of the city's aesthetic resources; major public expenditures to repair damaged facilities and to protect against future damages due to slope instability caused by development activities.
Lands determined to be susceptible to landslide or erosion hazard areas (including channel migration zones), are hereby designated as geologically hazardous areas. Development in these geologic hazard areas can put human life, safety, health, and development at risk, alter geologic processes, adversely affect natural resources, and put the development and surrounding developments and uses at risk.
(a) 
Classification. For purposes of this chapter, geologically hazardous areas shall include all of the following:
(i) 
Landslide Hazard Areas. Landslide hazard areas shall include areas potentially susceptible to landslides based on a combination of geologic, topographic, and hydrologic factors. They include any areas susceptible to mass movement due to any combination of bedrock, soil, slope (gradient), slope aspect, slope form (concave, convex, planar), geological structure, surface and subsurface hydrology, or other factors. Landslide hazard areas shall also include areas along which landslide material may be routed or which may be subject to deposition of landslide delivered material. Landslide hazard areas include but are not limited to the following areas:
(A) 
Areas designated as quaternary slumps, earth-flows, mudflows, or landslides on maps published by the U.S. Geological Survey, Washington State Department of Natural Resources, or other reputable sources;
(B) 
Areas with all three of the following characteristics:
(I) 
Slopes steeper than 15 percent;
(II) 
Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment or bedrock; and
(III) 
Springs or ground water seepage;
(C) 
Areas that have shown movement and/or are underlain or covered by mass wastage debris;
(D) 
Potentially unstable slopes resulting from river or stream erosion or undercutting by wave erosion;
(E) 
Areas that show past sloughing or calving of sediment or rocks resulting in a steep slope that is poorly vegetated;
(F) 
Slopes that are parallel or subparallel to planes of weakness (which may include but not be limited to bedding planes, soft clay layers, joint systems, and fault planes) in subsurface materials;
(G) 
Any area with a slope of 40 percent or steeper and with a vertical relief of 10 or more feet except areas composed of competent bedrock or a properly engineered slope designed and approved by a geotechnical engineer licensed in the state of Washington and experienced with the site;
(H) 
Areas within which land use activities could affect the slope stability, including but not limited to areas with subsurface hydrologic flow, ground water recharge areas and surface water flow;
(I) 
Areas of historical landslide movement including coastal shoreline areas mapped by the Department of Ecology Coastal Zone Atlas or the Department of Natural Resources slope stability mapping as unstable (“U” or class 3), unstable old slides (“UOS” or class 4), or unstable recent slides (“URS” or class 5).
(ii) 
Erosion Hazard Areas. Erosion hazard areas shall include:
(A) 
Channel migration zones, also known as riverine erosion areas, are defined as the areas along a river or stream within which the channel(s) can be reasonably predicted to migrate over time. This is a result of natural and normally occurring geomorphic, hydrological, and related processes when considered with the characteristics of the river or stream and its surroundings, and in consideration of river and stream management plans. Channel migration hazard areas shall include: potential channel migration, channel avulsion, bank erosion, and stability of slopes along the river or stream;
(B) 
Coastal erosion areas that are subject to shoreline retreat from wind, wave, and tidal erosion.
(b) 
Standards.
(i) 
Landslide Hazard Areas.
(A) 
General Standards. The following activities may be allowed in active landslide hazard areas when reasonable measures have been taken to minimize risks and other adverse effects associated with landslide hazards, and when the amount and degree of the alteration are limited to the minimum needed to accomplish the project purpose:
(I) 
Developments that will have no threat to the health or safety of people and will not increase potential for landslides on or off the site and meet the reasonable use standards as set forth above.
(II) 
Utility lines and pipes that are above ground, properly anchored and/or designed so that they will continue to function in the event of a slope failure or movement of the underlying materials and will not increase the risk or consequences of static or seismic slope instability or result in a risk of mass wasting. Such utility lines may be permitted only when the applicant demonstrates that no other feasible alternative is available to serve the affected population.
(III) 
Access roads and trails that are engineered and built to standards that avoid the need for major repair or reconstruction beyond that which would be required in nonhazard areas. Access roads and trails may be permitted only if the applicant demonstrates that no other feasible alternative exists, including through the provisions of Chapter 8.24 RCW. If such access through critical areas is granted, exceptions or deviations from technical standards for width or other dimensions and specific construction standards to minimize impacts, including drainage and drainage maintenance plans, may be required.
(IV) 
Stormwater conveyance through a properly designed stormwater pipe when no other stormwater conveyance alternative is available. The pipe shall be located above ground and be properly anchored and/or designed so that it will continue to function in the event of a slope failure or movement of the underlying materials and will not increase the risk or consequences of static or seismic slope instability or result in increased risk of mass wasting activity.
(B) 
Landslide Hazard Management Zone. Alteration may be allowed within 300 feet of an active landslide hazard area when the director determines that the following standards are met:
(I) 
The proposed alteration includes appropriate measures to avoid, eliminate, reduce, or otherwise mitigate risks to health and safety.
(II) 
The proposed alteration is located outside of a landslide hazard area and any required setback.
(III) 
The development will not decrease slope stability on adjacent properties. The development shall not increase the risk or frequency of landslide occurrences.
(IV) 
The removal and disturbance of vegetation, clearing, or grading shall be limited to the area of the approved development.
(V) 
The development is outside of the area of potential upslope or downslope surface movement or potential deposition in the event of a slope failure.
(VI) 
The development will not increase or concentrate surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions.
(VII) 
The proposed alterations will not adversely impact other critical areas.
(VIII) 
Structures and improvements shall minimize alterations to the slope contour, and shall be designed to minimize impervious lot coverage unless such alterations or impervious surfaces are needed to maintain slope stability.
(ii) 
Erosion Hazard Areas. For coastal, riverine, and stream erosion hazard areas, the following activities shall be allowed when the applicable general protective measures are applied as follows:
(A) 
Discharge of surface water drainage into a coastal or riverine erosion hazard area, provided there are no other alternatives for discharge, and the drainage is collected upland of the top of the active erosion hazard area and directed downhill in an appropriately designed stormwater pipe that includes an energy dissipating device at the base of the hazard area. The pipe shall be located on the surface of the ground and be properly anchored so that it will continue to function under erosion conditions and not create or contribute to adverse effects on downslope critical areas. The number of pipes should be minimized along the slope frontage.
(B) 
Stormwater retention and detention systems, such as dry wells and infiltration systems using buried pipe or French drains, provided they are located outside the identified channel migration zone, designed by a qualified professional and shall not affect the stability of the site.
(C) 
Utility lines when no feasible conveyance alternative is available. The line shall be located above ground and properly anchored and/or designed so that it will not preclude or interfere with channel migration and will continue to function under erosion conditions; provided, that utility lines may be located within channel migration zones if they are buried below the scour depth for the entire width of the CMZ.
(D) 
Public roads, bridges, and trails when no feasible alternative alignment is available. Facilities shall be designed such that the roadway prism and/or bridge structure will not be susceptible to damage from active erosion.
(E) 
Access to private development sites may be allowed to provide access to portions of the site that are not critical areas, if there are no feasible alternative alignments. Alternative access shall be pursued to the maximum extent feasible, including through the provisions of Chapter 8.24 RCW. Exceptions or deviations from technical standards for width or other dimensions, and specific construction standards to minimize impacts, may be specified.
(F) 
Stream bank stabilization and shoreline protection may be permitted subject to all the following standards:
(I) 
Shoreline protection measures located within coastal or riverine erosion areas shall use soft armoring techniques (bioengineering erosion control measures as identified by the State Department of Ecology and the Department of Fish and Wildlife guidance) unless the applicant provides a geotechnical analysis demonstrating that bioengineering approaches will not adequately protect the property.
(II) 
The armoring will not adversely affect critical areas including habitat conservation areas or mitigation will be provided to compensate for adverse effects where avoidance is not feasible.
(III) 
Hard bank armoring is discouraged and may occur only when the property contains an existing permanent structure(s) that is in danger from shoreline erosion caused by wave action or riverine processes and not erosion caused by upland conditions, such as the alteration of natural vegetation or drainage, and the armoring shall not increase erosion on adjacent properties and shall not eliminate or reduce sediment supply.
(IV) 
The erosion is not being caused by upland conditions, such as the removal of vegetation or human alteration of existing drainage.
(V) 
Nonstructural measures, such as placing or relocating the development further from the shoreline, planting vegetation, or installing onsite drainage improvements, are not feasible or not sufficient.
(G) 
New public flood protection measures and expansion of existing ones may be permitted, subject to a state hydraulic project approval; provided, that bioengineering or soft armoring techniques shall be used where feasible. Hard bank armoring may occur only in situations where soft approaches do not provide adequate protection.
(c) 
Setbacks.
(i) 
Landslide Hazard Area. The director shall require setbacks from the edges of any identified landslide hazard area in accordance with the following:
(A) 
The size of the setback shall be based on the findings of a qualified professional and shall minimize the risk of property damage, death, or injury resulting from landslides both on and off the property.
(B) 
The setback shall include consideration of the hydrologic contribution area to the potential landslide area and/or the area subject to the potential for mass movement, and the downhill area subject to potential deposition.
(C) 
The setback shall include consideration of vegetation on the potential landslide area and in areas above and below the potential landslide area. The director shall have the authority to require vegetation or other measures to protect or improve slope stability and shall have the authority to require a mitigation plan developed in accordance with this chapter, and an easement in accordance with this title to ensure appropriate vegetation improvements are installed, maintained, and preserved.
(D) 
Developments on sites that are directly adjacent to a wetland, marine shoreline, or other habitat conservation area as defined in this chapter may be subject to additional buffer requirements and standards as set forth in the subsequent sections of this chapter.
(ii) 
Erosion Hazard Areas. The director shall have the authority to require setbacks from the edges of any coastal, stream, or riverine hazard erosion area in accordance with the following:
(A) 
The size of the setback shall be based on the findings of a qualified professional and shall protect critical areas and processes and minimize the risk of property damage, death or injury resulting from erosion over the life of the development, typically identified as 100 years.
(B) 
The setback shall include the uphill area subject to potential erosion, the downhill area subject to potential deposition, and any area subject to landslide as a result of erosion.
(C) 
The setback shall include woody vegetation adequate to stabilize the soil and prevent soil movement (native species are preferred). If the designated setback area lacks adequate woody vegetation, the director shall have the authority to require vegetation enhancement or other measures to improve slope stability.
(D) 
Developments on sites that are directly adjacent to a wetland or marine shoreline or other habitat conservation area as defined in this chapter may be subject to additional setback requirements and standards as set forth in the subsequent sections of this chapter.
(d) 
Development Requirements. The following requirements shall apply to all activities in geologically hazardous areas:
(i) 
Generally. New developments shall be located and/or engineered and constructed to reduce risks to life, health, safety, and buildings, and not increase potential for landslides or erosion that could impact either other properties, public resources, or other critical areas. The director may impose conditions on development activity in a geologically hazardous area as needed to:
(A) 
Protect human life and safety;
(B) 
Minimize the potential for property damage related to seismic events, erosion and/ or landslides;
(C) 
Minimize the need for stream or river bank or coastal bluff stabilization in the future;
(D) 
Reduce public liabilities for damages associated with geologic hazards;
(E) 
Protect slope stability and minimize erosion, seismic, and/or landslide hazard risks; and
(F) 
Maintain natural sediment and erosion processes that are integral to the health and sustainability of freshwater and marine ecosystems as well as minimizing impacts to stream, river, and coastal processes such as channel infill, channel migration, sediment transport, or flooding.
(ii) 
Impact Avoidance. Impact avoidance measures shall include, but not be limited to, locating the use/development outside of the hazard area, reducing the number, size or scale of buildings, driveways and other features; altering the configuration or layout of the proposed development; implementing special engineering methods for construction, drainage, runoff management, etc.; forgoing construction of accessory structures; preserving native vegetation; and other feasible protective measures as determined by an alternatives analysis. For some geologic hazards, impact avoidance may mean no development will be permitted on a property.
(iii) 
Location of Alterations. New development shall be directed toward portions of a parcel or parcels under contiguous ownership that are not subject to, or at risk from, geological hazards and/or are outside any setback or buffer established by this chapter.
(iv) 
Critical Facilities Prohibited. Critical facilities as defined in WAC 16.16.800 shall not be constructed or located in geologically hazardous areas if there is a feasible alternative location outside geologically hazardous areas that would serve the intended service population. If allowed, the critical facility shall be designed and operated to minimize the risk and danger to public health and safety to the maximum extent practicable.
(v) 
Review by Qualified Professional. A geologist or other qualified professional, licensed in the state of Washington, shall review development proposals that occur in potentially geologically hazardous areas to determine the potential risk. If development takes place within an identified geologically hazardous area requiring design or structural elements to mitigate the hazard, the mitigation shall be designed by a qualified professional licensed in the state of Washington with expertise in mitigation of geological hazards.
(vi) 
Life of Structure. Proposed development shall be sited far enough from erosion and landslide hazard areas to ensure at least 100 years of useful life for the proposed structure(s) or infrastructure. The location should be determined by a geologist or other qualified professional, licensed in the state of Washington and should be based on site-specific evaluation of the landslide and/or erosion hazard.
(vii) 
Remodels and Additions. Any proposed remodel or addition to an existing permitted or nonconforming structure that exceeds a valuation of greater than 50 percent of the fair market value shall be required to ensure that the entire structure is improved in accordance with city of DuPont building code requirements.
(viii) 
Land Subdivision. Land that is located wholly within a landslide hazard area/erosion hazard area or its buffer may not be subdivided to create buildable parcels entirely within the hazardous area. Land that is located partially within a hazard area or its setback may be divided; provided, that each resulting lot has sufficient buildable area outside of the hazardous area with provision for drainage, erosion control and related features that will not adversely affect the hazard area or its setback.
(4) 
Aquifer Recharge Areas. Aquifer recharge areas are characterized as porous geologic formations which store surface water that has percolated into the soil (ground water). Currently the Red Salmon Springs Aquifer and the Outwash/Lakewood Glacier Aquifer are used as drinking water sources for the city of DuPont. This section provides protection measures to effectively maintain the quality of potable ground water by prevention of contamination. Development in aquifer recharge areas shall be subject to the standards described in this section.
(a) 
Classification.
(i) 
Aquifers are highly susceptible to damage when the overlying soils and geologic formations that filter surface waters feeding the aquifer are very coarse textured, allowing rapid translocation of surface pollutants to the aquifer. Aquifers under fine-textured soils and geologic formation are less susceptible to surface influences and pollution.
(ii) 
Aquifers underlying areas that are currently developed or industrialized are more vulnerable to pollution than aquifers in undeveloped areas. Combining aquifer susceptibility indexes with vulnerability indexes allows identification of those areas most at risk. Aquifers with relatively high susceptibility indexes located in industrial areas have the highest potential to become a significant public health hazard. High vulnerability is characterized by land uses which produce contaminants that may degrade ground water quality or reduce ground water quantity. Low vulnerability is characterized by land uses which will not affect ground water quality or quantity.
(iii) 
Vulnerability to pollution is a function of depth of ground water, permeability of soils and geologic formations (susceptibility), presence of potential source of contamination, and any other relevant factors.
(b) 
Regulated Development. The following types of development shall be regulated under this chapter:
(i) 
Any development not connected to sanitary sewers which is located in a critical aquifer recharge area. On-site sewage treatment shall be prohibited in critical aquifer recharge areas.
(ii) 
The following land uses shall require a hydrogeologic assessment of the proposed site:
(A) 
Hazardous substance processing or handling;
(B) 
Hazardous waste treatment and storage facilities;
(C) 
Underground storage of petroleum products;
(D) 
Landfills, junkyards, auto wrecking yards;
(E) 
Golf courses; and
(F) 
Large scale agriculture; or
(G) 
Other land use of a similar nature.
(c) 
Performance Standards for Development. All regulated development, as identified in this section, shall be designed and constructed subject to the following standards:
(i) 
Underground hazardous substance and/or petroleum storage facilities shall:
(A) 
Be designed to prevent releases due to corrosion or structural failure for the operational life of the tank;
(B) 
Be protected against corrosion, constructed of noncorrosive material, steel clad with a noncorrosive material, or designed to include a secondary containment system to prevent the release or threatened release of any stored substance; and
(C) 
Use material in the construction or lining of the tank that is compatible with the substance to be stored.
(ii) 
Above-ground hazardous substance and/or petroleum storage tanks shall:
(A) 
Not be fabricated, constructed, installed, used or maintained in any manner which may allow the release of a hazardous substance to the ground, ground water, or surface waters of DuPont within an aquifer recharge area;
(B) 
Not be fabricated, constructed, installed, used or maintained without having constructed around and under it an impervious containment area enclosing or underlying the tank;
(C) 
Require a secondary containment system either built into the tank structure or dike system built outside the tank for all tanks located within an aquifer recharge area. Propane and heating oil tanks are exempt from secondary containment system requirements;
(D) 
Be consistent with the Department of Ecology's standards for construction and installation.
(iii) 
Stormwater runoff will be controlled and treated using BMPs and facility design standards as defined in DMC Title 22.
(iv) 
Agricultural and landscaping activities, specifically use of fertilizers, herbicides, and pesticides in highly susceptible areas, shall be controlled through state water quality standards.
(v) 
Applicants shall also consider the guidance set forth in Chapter 5 of the Low Impact Development Technical Guidance Manual for the Puget Sound (2012) for recommendations concerning the protection of native soils and vegetation, and retention of hydrologic function, during clearing and grading for development proposals.
(d) 
Mitigation or Compensation. Any regulated development listed in subsection (4)(b) of this section which results in degradation of aquifer recharge areas or aquifer water quality will require restoration of on-site disturbance in full to predisturbance conditions. Additional compensation shall be required in the form of fines, provision of drinking water for areas dependent on the degraded aquifer, or alternative environmental restoration.
(e) 
Report Required. A geohydrological report may be required in those areas identified as highly susceptible or vulnerable.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.060 In-lieu fees.

To aid in the implementation of off-site mitigation, the city may develop an in-lieu fee program. This program shall be developed and approved through a public process and be consistent with federal rules, state policy on in-lieu fee mitigation, and state water quality regulations. An approved in-lieu-fee program sells compensatory mitigation credits to permittees whose obligation to provide compensatory mitigation is then transferred to the in-lieu program sponsor, a governmental or nonprofit natural resource management entity. Credits from an approved in-lieu-fee program may be used when all of the following requirements are met:
(1) 
The approval authority determines that it would provide environmentally appropriate compensation for the proposed impacts.
(2) 
The mitigation will occur on a site identified using the site selection and prioritization process in the approved in-lieu-fee program instrument.
(3) 
The proposed use of credits is consistent with the terms and conditions of the approved in-lieu-fee program instrument.
(4) 
Land acquisition and initial physical and biological improvements of the mitigation site must be completed within three years of the credit sale.
(5) 
Projects using in-lieu-fee credits shall have debits associated with the proposed impacts calculated by the applicant's qualified wetland scientist using the method consistent with the credit assessment method specified in the approved instrument for the in-lieu-fee program.
(6) 
Credits from an approved in-lieu-fee program may be used to compensate for impacts located within the service area specified in the approved in-lieu-fee instrument.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.070 Exemptions and exceptions.

Certain actions are exempt from the requirements of this chapter while other actions may be granted specific exceptions or modifications as provided in this chapter. Exemptions and exceptions shall be narrowly construed to protect critical areas and their buffers.
(1) 
Exemptions.
(a) 
Existing structures or improvements (not covered under subsection (2) of this section) that do not meet the requirements of this chapter may be remodeled, reconstructed, or replaced providing the existing structures or improvements currently meet the originally intended use or function and that any new construction does not further intrude into or detrimentally disrupt a critical area and/or buffer. The burden of proof of functionality and material use, of existing structures or improvements, as well as impact of the proposed activity, is on the applicant and subject to the discretion of the director.
(b) 
Normal and routine maintenance of existing drainage ditches and drainage retention/ detention facilities, and other existing utilities.
(c) 
Clean-up activities through nonmechanical and nonchemical means such as trash removal and invasive plant removal are exempt activities under this chapter. Coordination of these activities should be made after prior consultation with the director.
(d) 
Exemption requests shall be made in writing and subject to the administrative authority of the director.
(2) 
Exceptions.
(a) 
Construction of new transportation corridors such as roads, sidewalks, and trails; utilities such as water and sewer lines, gas lines, telecommunications and underground power lines; recreation facilities such as boardwalks, viewing platforms and pedestrian bridges; research facilities and monitoring stations where it can clearly be demonstrated that the project is needed for the benefit of the public; and no feasible alternative exists or to gain access to private property; and there is no feasible alternative to the proposed location; and the proposed location results in no net loss in a critical area's functional value. An alternative site for the proposed activity shall be considered feasible if it is available and the proposed activity can be carried out on the site after taking into consideration costs, existing technology, infrastructure, and logistics, in light of overall project purposes. There is no feasible alternative when the following can be demonstrated:
(i) 
The basic purpose of the public transportation or underground utility project cannot reasonably be accomplished using one or more other sites in the city that would avoid or result in less adverse impacts on critical areas; and
(ii) 
The basic purpose of the project cannot be accomplished by a reduction in the size, scope, or configuration of the project as proposed or by changing the design of the project in a way that would avoid or result in fewer adverse effects on the critical area.
(b) 
Projects or alterations qualifying as an exception under this section shall be required to mitigate any impacts to critical areas in accordance with the mitigation requirements provided in this chapter.
(c) 
Exception requests shall be made in writing and subject to the administrative authority of the director.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.080 Critical area permit submittal requirements.

Any development proposal within a critical area or its buffer, as determined by the director, shall require a critical area permit unless it qualifies for an exemption or exception under DMC § 25.105.070. Development outside a critical area or buffer that may nonetheless adversely affect the critical area or buffer may be conditioned pursuant to the city's substantive authority under the State Environmental Policy Act and DMC § 23.01.150.
(1) 
Nonexempt actions and development within or adjacent to a critical area shall be processed with a Type III procedure as set forth in DMC § 25.175.010.
(2) 
A complete critical area development application shall contain the information contained in this section in addition to the information required by DMC § 25.175.020 in addition to any specific submittal requirements of this chapter.
(a) 
Name, address, and phone number of the applicant(s) and property owner(s) (if different from the applicant).
(b) 
Complete legal description of the subject property.
(c) 
Statement of proposed development or action.
(d) 
A site plan at a scale acceptable to the city showing existing conditions that include the following elements:
(i) 
Topographic contours at two-foot intervals;
(ii) 
Existing streets, roads and trails;
(iii) 
Existing structures and facilities;
(iv) 
Extent of critical areas as delineated in the field;
(v) 
Location of existing trees and tree masses;
(vi) 
Soil types and their locations.
(e) 
A site plan at a scale acceptable to the city showing proposed development that includes the following elements:
(i) 
Topographic contours showing finished grade at two-foot intervals;
(ii) 
Proposed streets, parking, trails and sidewalks;
(iii) 
Location of proposed structures and facilities;
(iv) 
Extent of critical areas and their buffers as delineated in the field;
(v) 
Location of major landscaping including those existing trees and tree masses to be retained.
(f) 
A site plan at a scale acceptable to the city showing any proposed subdivision including:
(i) 
Lot lines;
(ii) 
Street rights-of-way;
(iii) 
Utility easements;
(iv) 
Critical areas tracts;
(v) 
Proposed storm drainage system and facilities.
(3) 
Permit Submittal Requirements.
(a) 
Preapplication Consultation. Any person preparing to submit an application for a development proposal, as defined by DMC § 25.105.030.105, shall conduct a consultation meeting with the director or his/her designee prior to submitting an application for development or other approval. At this meeting, the director or his/her designee shall discuss the requirements of this chapter; provide available critical area maps, scientific information, and other materials that outline the review process; and work with the applicant to identify any potential concerns that might arise during the review process, in addition to discussing other permit procedures and requirements.
(b) 
Initial Review. Following submittal of an application for a development proposal, the director or his/her designee shall review the application, site conditions, and other information available pertaining to the site and the proposal and make a determination as to whether any critical areas may be affected by the proposal.
(c) 
Site Inspection. The property owner shall provide the city with reasonable access to the site for the purpose of inspections during any proposal review, enhancement, rehabilitation, or restoration effort, emergency action, or monitoring activity.
(d) 
Critical Area Report Required. If the information available indicates that the project area is within or adjacent to a critical area or buffer, or that the proposed activity is in close enough proximity to a critical area, as determined by the director, that it will likely degrade a critical area, then the applicant shall be required to submit a critical area report prior to further review of the project. The director will review the critical area report to determine whether a critical area permit is required under subsection (1) of this section.
(4) 
Permit Review Criteria.
(a) 
An application for a critical areas permit may be approved, approved with conditions, or denied based on the proposal’s ability to comply with all the following criteria:
(i) 
The proposal minimizes the impact on critical areas in accordance with mitigation as defined in the chapter;
(ii) 
The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site;
(iii) 
The proposal is consistent with the general purposes of this chapter and the public interest;
(iv) 
Any alterations permitted to the critical area are mitigated in accordance with the mitigation requirements and standards of this chapter;
(v) 
The proposal protects the critical area functions and values consistent with the best available science; and
(vi) 
The proposal is consistent with other applicable regulations and standards. The granting of a critical areas permit should not be construed as approval of any other required underlying permit or approval for the development proposal.
(b) 
The city may condition the underlying permit or approval for any alteration or development within or adjacent to a critical area or its buffer. Additional conditions may be placed on the proposal if it is in close enough proximity to and likely to effect a critical area or its buffer as determined by the director. Additional conditions will be established as necessary to mitigate impacts to critical areas and to conform to the standards required by this chapter. Any conditions of approval of the critical areas permit shall be attached to the underlying permit or approval.
(c) 
The applicant has the burden of proof that a proposal complies with the standards set forth in this chapter.
(d) 
Completion of the Critical Area Review. The city’s issuance of a critical areas permit pursuant to this chapter shall be final, concurrent with the final decision to approve, condition, or deny the development proposal or other activity involved.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.090 Enforcement and procedures of this chapter.

(1) 
Peer Review. The director may require a third-party peer review of any report or study required of an applicant to implement the provision of this chapter to ensure accuracy of the information. The applicant shall bear the burden of any costs associated with this peer review. The director is authorized to hire a third-party consultant to perform this review upon completion of a three-party contract with the applicant to pay for the peer review prior to review of any permit proposal.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.100 Notice and financial securities.

(1) 
Notice. The owner of any property containing critical areas or buffers on which a development project is submitted shall file for record with Pierce County a notice approved in form by the city. Such notice shall provide notice in the public record of the presence of any critical areas or buffers. The owner shall submit proof to the city that the notice has been filed for record within 30 days after the approval of a development permit. The notice shall run with the land, and failure to provide such notice to any purchase prior to transferring any interest in the property shall be a violation of this chapter.
(2) 
Performance Security. The city may require the applicant of a development proposal to post a financial security, in a form and amount determined by the director, sufficient to guarantee satisfactory workmanship, materials, and performance of structures and improvements allowed or required by application of this chapter. The city shall release the security upon determining that all structures and improvements have been satisfactorily completed.
(3) 
Maintenance Security. The city may require the applicant whose development proposal is subject to a mitigation plan to post a maintenance/ monitoring financial security instrument in a form and amount determined sufficient to guarantee satisfactory performance for a period of up to five years, or longer if determined by the director to ensure success of the required mitigation. The duration of maintenance/monitoring obligations shall be established by the city after consideration of the nature of the proposed mitigation and the likelihood and expense of mitigation failures. The city shall release the security upon determining that the effectiveness and success of the mitigation plan has been satisfactory. The performance standards of the mitigation plan shall be agreed upon by the city and the applicant during the review process.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.110 Nonconformance.

(1) 
Nonconforming Structures and Improvements. Structures and improvements in existence on the date the ordinance codified in this chapter becomes effective and that do not meet the setback or buffer requirements of this chapter for any defined critical area shall be considered legal nonconforming uses. Future alteration, reconstruction, or expansion of legal nonconforming structures permitted under this section must meet all the requirements of this chapter.
(2) 
No permit granted pursuant to this chapter, except as permitted pursuant to DMC § 25.105.070, shall remove an applicant’s obligation to comply in all respects with the applicable provisions of any other federal, state, or local law or regulation.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.120 Suspension – Revocation.

In addition to enforcement procedures and penalties provided for in Chapter 25.185 DMC the director may suspend or revoke a permit when the applicant or permittee has not complied with any or all of the conditions or limitations set forth in accordance with this chapter, has exceeded the scope of work set forth in the permit, or has failed to undertake the project in the manner set forth in the approved application, or has failed to abide by any relevant federal, state or city law, regulation or ordinance.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.130 Amendments.

(1) 
These regulations and the city inventory maps may from time to time be amended in accordance with the procedures and requirements in the general statutes and as new information concerning critical areas becomes available.
(2) 
The city’s shoreline master program at Chapter 25.170 DMC incorporates the critical areas ordinance by reference. Therefore, amendments to this chapter that are intended to alter development regulations applicable to shorelines jurisdiction must be processed as an amendment to the city of DuPont shoreline master program and shall be subject to approval by the Department of Ecology.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.140 Severability.

In the event any one or more of the provisions of this chapter shall for any reason be held to be invalid, such invalidity shall not affect or invalidate any other provision of this chapter, but this chapter shall be construed and enforced as if such invalid provision had not been contained therein; provided, that any provision which shall for any reason be held because of its extent to be invalid shall be deemed to be in effect to the extent permitted by law.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.150 Appeals.

Final permit decisions made by the director shall be subject to appeal in accordance with the procedures of DMC Title 25 and Chapter 1.11 DMC, and any other relevant federal, state or city law, regulation or ordinance; provided, that the applicant may request administrative review by the director and development services prior to initiating a formal appeal process. Decisions of conditions applied to specific permits shall be subject to the appeal provisions for that permit.
Any person with standing may appeal to the hearing examiner a final administrative order, final requirement, final permit decision, or final determination made; provided, that such appeal shall be filed in accordance with the appeal procedure for the underlying permit. If there is no appealable permit or if the appeal is for a reasonable use permit decision issued by the technical administrator, the appeal shall be filed in writing within 14 calendar days of the date the written decision, order, requirement, or determination is issued and public notice provided, unless the decision is issued as part of a SEPA determination of nonsignificance for which a public comment period is required, in which case a 21-day appeal period shall be provided.
The appeal will be upheld if the applicant proves that the decision appealed is clearly erroneous or based upon error of law.
The hearing examiner shall have the authority to set an expiration date for any or all appeal approvals. The hearing examiner will render a decision pursuant to Chapters 1.11 and 25.185 DMC.
Each application for an appeal of an administrative decision to the hearing examiner shall be accompanied by a fee as stated in the unified fee schedule.
Pursuant to Chapter 36.70C RCW, the applicant, any party of record, or any city department may appeal any final decision of the hearing examiner before Pierce County superior court.
Any issue not raised in the original appeal filing is thereafter waived.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.160 Assessment relief.

(1) 
The Pierce County assessor’s office shall consider critical area regulations in determining the fair market value of land.
(2) 
Any undeveloped critical area property which has recorded upon it an easement or which is the subject of a perpetual conservation restriction with the city or a nonprofit organization to permanently control some or all regulated activities in that portion of land assessed consistent with those restrictions shall also be considered for exemption from special assessments to defray the cost of municipal improvements such as sanitary sewers, storm sewers, and water mains.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.105.170 Limitation of actions.

Any final decision under this chapter shall be final and conclusive unless timely appealed by following the appeal procedures of this chapter, Chapters 1.11 and 25.185 DMC; and any relevant federal, state, or city law, regulation or ordinance.
(Ord. 18-1054 § 2 (Exh. A))

§ 25.110.010 Setback – Street corners.

On corner lots no building, structure, parking, sign, berm, planting, or other sight-obscuring object, other than traffic signs and utility poles, shall be erected, placed, or allowed to grow between the heights of three feet and eight feet above the street surface within the vision clearance triangle. The vision clearance triangle (see Figure 1) is that area enclosed on two sides by the intersecting public right-of-way lines and on the third by an imaginary line connecting those points on said right-of-way lines that are 30 feet from their point of intersection.
Figure 1
(Ord. 02-707 § 1)

§ 25.115.010 Purpose.

This chapter sets forth specific standards providing for city compliance with the concurrency requirements of the State Growth Management Act (GMA) and for consistency between city and county-wide planning policies under the GMA.
It is the purpose of this chapter:
(1) 
To ensure adequate levels of service on transportation facilities for existing land uses as well as new development;
(2) 
To provide transportation facilities that achieve and maintain the city’s level of service standards as established in the comprehensive plan; and
(3) 
To ensure that the city’s level of service standards are achieved concurrently with development as required by the Growth Management Act.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.115.020 Concurrency requirement.

(1) 
The following development permit applications shall be subject to a concurrency test which shall be conducted in the processing of the development permit application:
(a) 
Preliminary plat (subdivision of five or more residential lots);
(b) 
Site plan and design review;
(c) 
Any development permit that generates 50 or more average trips per day (ADT) or five or more a.m. or five or more p.m. peak hour trips, per the latest edition of the ITE Trip Generation Manual.
(2) 
The city shall not issue a development permit until:
(a) 
A concurrency test has been conducted in accordance with DMC § 25.115.030(2) and a certificate of concurrency has been issued; or
(b) 
The application has been determined to be exempt from the concurrency test as provided in DMC § 25.115.050.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.115.030 Review process.

(1) 
Certificate of Concurrency.
(a) 
The city shall complete transportation concurrency evaluation at the time a development permit is applied for or during the course of permit review. The review shall conclude with a determination that the proposed project meets the level of service standards whereby a certificate of concurrency shall be issued and attached or incorporated to the development permit approval. When a project is determined to have not passed level of service standards, the certificate of concurrency shall be conditioned in a manner that satisfies the requirements of this chapter, or the project shall not be approved.
(b) 
The applicant shall provide the city with all information necessary to complete the concurrency evaluation on the proposed development. It shall be the responsibility of the applicant to provide studies, surveys, traffic counts, engineering review or any other items determined to be necessary for an accurate concurrency evaluation.
(c) 
A certificate of concurrency shall be accorded the same terms and conditions as those for the underlying development permit. If a development permit timeline is extended, the certificate shall also be extended for the same time duration. A certificate of concurrency shall be valid only for the development permit approved for the same parcel and may be transferable to any new owner(s) of the parcel to which it was issued.
(2) 
Concurrency shall be established and determined as follows:
(a) 
Traffic Impact Calculations.
(i) 
Trip Generation. Traffic calculations shall be based on the trip generation average described within the latest available edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual for the particular type and extent of the development being proposed.
(ii) 
Concurrency Test. The projected number of trips generated by a proposed development shall be subtracted from existing or new transportation capacity of the impacted transportation facility. If projected demand is less than available capacity, the project is not adverse to level of service standards and shall be issued a certificate of concurrency.
(A) 
The project makes on-site and frontage improvements, consistent with city standards for utilities, curbs, gutters, sidewalks, bicycle lanes where appropriate, and roads necessary to serve the proposed project consistent with safety and public interest;
(B) 
The project makes such off-site facility improvements, not listed on the capital facilities plan, as are necessary to meet city standards for the safe movement of traffic and pedestrians attributable to the project.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.115.040 Finding of concurrency.

The city shall make a finding of concurrency for each building permit application that passes the concurrency test.
The finding of concurrency shall be valid for the same time period as the underlying building permit, including any extensions thereof.
A finding of concurrency shall expire if the underlying building permit expires or is revoked by the city.
A finding of concurrency accompanying a building permit for a particular parcel of property shall be valid for the period of validity of the permit, even if the ownership of the property changes.
All building permits that require one or more transportation facilities to be provided by the applicant shall be and are hereby conditioned upon an appropriate financial commitment by the applicant which is binding upon subsequent owners, heirs, executors, successors or assigns, and upon the completion of such transportation facilities in a timely manner, prior to the issuance of the certificate of occupancy or prior to occupancy, unless stated otherwise in writing by the city. Such financial commitment shall be subject to the approval of the city attorney, including performance bond, escrowed funds, or other similar instrument.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.115.050 Exemptions from the concurrency test.

The following applications for development permits shall be exempt from the concurrency test:
(1) 
Any proposed development that creates no additional impacts on any transportation facility;
(2) 
Any project that is a component of another proposed development and that was included in a prior application for a finding of concurrency;
(3) 
Any application for a residential building permit if the dwelling unit is a part of a subdivision or short plat that submitted an application and that has undergone a concurrency test and received concurrency approval as part of plat approval; and
(4) 
Any permit for development that generates less than the number of trips described in DMC § 25.115.020(1)(c).
(Ord. 17-1017 § 2 (Exh. B))

§ 25.115.060 Transportation concurrency mitigation methods.

The city shall use the following procedures and criteria to review and approve the adequacy of mitigation methods unless the applicant is otherwise notified in writing:
(1) 
If mitigation is determined necessary to maintain level of service standards for an impacted transportation facility, the applicant may choose among the following actions:
(a) 
Reduce the size of the project until level of service standards are met;
(b) 
Enter into a legally binding development agreement with the city whereby all required improvements will be constructed and completed within six years of the development approval date which also insures that the financing is available to pay for the improvements at time of building permit approval;
(c) 
Be subject to a development approval conditioned that the required improvements be completed prior to the issuance of building permits, final plat or site plan approvals associated with the development;
(d) 
Propose transportation demand management strategies to reduce vehicle trips generated by the project development;
(e) 
Await the city's completion of mitigating improvements if such improvements are underway or planned as part of the city's six-year transportation improvement plan; or
(f) 
Any combination of the above.
(2) 
Acceptable impact mitigation requires a finding of the following:
(a) 
The mitigation contributes to transportation facility performance and established level of service standards;
(b) 
The mitigation is consistent with the city's comprehensive plan;
(c) 
Any improvements to an intersection or roadway do not shift traffic to residential areas or to other intersections where there is no mitigation being proposed;
(d) 
Any adverse environmental impacts of the facility improvements may be reasonably minimized or eliminated; and
(e) 
The improvements are consistent with the city's engineering standards.
(Ord. 17-1017 § 2 (Exh. B))

§ 25.120.010 Purpose.

(1) 
The purpose of this chapter is to:
(a) 
Protect natural habitats, air quality, and ground water recharge;
(b) 
Improve the appearance of the community;
(c) 
Provide shade and wind protection;
(d) 
Reduce stormwater discharge; and
(e) 
Conserve water supplies.
(2) 
This chapter is intended to help achieve these purposes by:
(a) 
Retaining trees, without reducing developmental densities from those indicated in the comprehensive plan.
(Ord. 02-707 § 1)

§ 25.120.020 Applicability.

This chapter shall apply to street trees throughout the city and to all new development projects that require a site plan approval, subdivision, or short plat.
(Ord. 02-707 § 1)

§ 25.120.030 Tree retention.

(1) 
Tree retention shall constitute an integral design goal in all public and private site design processes. Retention is particularly desired for trees that are especially large, well-formed, historic, grouped, close to a sensitive area, visually prominent, part of a recognizable landmark, or valuable as wildlife habitat.
(2) 
All landmark (see DMC § 25.10.120, L definitions) Oregon white oak trees shall be retained, along with any native understory within a protection zone one and one-half times the radius of the oak's canopy, unless the landmark oaks are within a proposed street right-of-way which is integral to the neighborhood and cannot reasonably be moved, or unless overall neighborhood densities cannot be met. In such cases, up to 30 percent of the landmark oak trees may be removed, when consistent with the standards in the table of DMC § 25.120.040(1). At least half of all other (non-oak) landmark trees shall be retained. In the industrial district and manufacturing/research park district, landmark trees which are in the building footprint, parking lot or storm retention area may be removed; provided, that tree retention is achieved along street boundaries and when abutting a residential district.
(3) 
The following minimum number of trees (other than street trees) per acre, expressed as an average over the entire neighborhood plan, site plan, subdivision, or short plat, shall be retained; provided, that nothing in the following shall require the retention of more than half of the existing trees, other than oak:
(a) 
Business and technology, and manufacturing/research: one and one-half;
(b) 
Commercial, office, mixed, civic, and schools: three;
(c) 
Single-family and mixed single-family and multifamily areas: four; provided, that for multifamily uses, half of the required four retained trees per acre may be satisfied by installing new trees; further provided, the cumulative diameter at breast height of the new trees equals that of the trees that would otherwise be retained but which are to be removed.
(4) 
When the application before the city contains oak management mapping units, trees retained therein shall count toward meeting the above requirement.
(5) 
No clearing, grading, trenching, cutting, impervious surfacing, or other construction shall be allowed within the drip line of any tree to be retained, or within one and one-half times the radius of the canopy in the case of oak trees to be retained, nor shall grades be lowered or raised so near as to jeopardize said trees; unless there is no other alternative and the intrusion is the minimum possible as determined by the administrator. Temporary barriers shall be installed around trees requiring protection during construction.
(6) 
All landscape plans required by DMC § 25.90.060 shall include:
(a) 
The location, size, and species of all landmark, historic, and specimen trees;
(b) 
Which trees are to be retained; and
(c) 
How retained trees will be protected during development.
(7) 
All trees retained by means of this chapter, including those on single-family residential lots, shall remain protected for their life, except as noted in subsection (8) of this section. The plat or site plan on which the tree is located shall contain the following note: “This plat is also subject to an approved tree retention plan which requires that certain trees be preserved. That plan, which is binding on all owners, is on file with the City Planning Department.” To further inform future lot owners, a copy of the approved tree retention plan shall be provided each owner at closing on each lot.
(8) 
Trees required to be retained by this chapter shall not be removed unless the administrator determines in writing that they have become hazardous or diseased or threaten to damage public or private property. Whoever removes a street tree or required tree shall replace it with a tree approved by the city.
(9) 
Additional tree retention requirements for areas adjacent to the Puget Sound Bluff in Hoffman Hill Village may be found in Section II.B.2 of the Settlement Agreement for Lone Star Northwest DuPont Project dated December 25, 1994. Additional tree retention requirements for areas of the Puget Sound Bluff north of Sequalitchew Creek and along the north side of Sequalitchew Creek may be found in Exhibit A to Ordinance 95-521, page 36, section 9.
(Ord. 02-707 § 1; Ord. 07-834 § 1)

§ 25.120.040 Oak management mapping units.

(1) 
DuPont's groves of Oregon white oaks constitute a unique resource demanding separate treatment. Accordingly, in 1996, Jones & Stokes Associates, Inc., prepared oak management recommendations under contract to the city. To implement those recommendations, the following mapping units are hereby established. Exhibit A attached to the ordinance codified in this chapter and found on file in the office of the city clerk shows their location. The regulations pertaining to these mapping units are as follows:
Mapping Units per Oak Management Recommendations
Area of Mapping Unit That Must Be Preserved
Which Portions of Mapping Units to Preserve
O-3, O-4, O-5a
100%
All
O-1, MO-2, MO-13
80%
For O-1 and MO-2, the oak preserves shall be focused in the core areas identified in the above-cited Oak Management Recommendations, and shall be in blocks no less than 200 feet wide between areas of developable land. For MO-13, the oak preserve shall be one contiguous block including the entire western portion thereof.
MO-1b
50%
The oak preserve shall be in a contiguous block at least 100 feet wide between areas of developable land. Also, the oak preserve shall be located to help implement the open space corridor which the comprehensive plan designates in that area.
O-2, O-5b, O-6, MO-17b, MO-18
30%
For O-5b, O-6, and MO-18, the oak preserves shall be focused in the core areas identified in the above-cited Oak Management Recommendations. For MO-17b, the oak preserve shall be in the 200-foot-wide buffer area adjoining Edmond Marsh.
MO-17a
20% of canopy (not of mapping unit)
The oak preserves shall be incorporated into pedestrian walkways, parks, natural landscaping, or road corridors. The largest oaks, or groups of oaks, shall be preserved. The protection zone around oaks or groups of oaks shall be at least one and one-half times the radius of the crown of the tree.
(2) 
Areas preserved per the above requirement shall be known as oak preserves.
(3) 
Temporary fences shall be placed around oak preserves during construction to avoid disturbance.
(4) 
No cuts, fills, or trenching shall occur in oak preserves. Grading near oak preserves shall utilize natural contours when possible to avoid creating pedestals or bodies where oaks are growing.
(5) 
Oaks in preserves shall not be irrigated unless an arborist experienced with oaks determines that, due to drought, they need deep watering around the drip line. Oak trees in areas surrounded by impervious surfaces may be more susceptible to drought.
(6) 
Landscaping in oak preserves shall be limited to native shrubs, grasses, or herbs. In Mapping Unit MO-17a’s preserves, native understory shrubs such as snowberry may be planted.
(7) 
The owners of oak preserves shall remove nonnative shrubs therein, such as Scot’s broom.
(8) 
Douglas firs shall be removed in oak preserves as needed to ensure oak survival, except that, in MO-13, Douglas firs shall not be removed or topped unless an arborist experienced with oaks determines they are growing within the crown of oak trees and significantly affecting the oaks’ growth.
(9) 
Oak preserves shall not be mowed except in Mapping Unit MO-17a, and in any oak preserve as necessary for fire control or for Scot’s Broom control.
(10) 
Oaks in preserves shall not be cut, but may be pruned by an arborist experienced with oaks, during the dormant season, to remove dead, weakened, diseased, or dangerous branches.
(Ord. 02707 § 1)

§ 25.120.050 Modifications.

Anyone with an ownership interest in land may request a modification from the provisions of this chapter based on special circumstances pertaining to that land or the trees on it. Such requests shall be addressed, in writing, with full documentation and justification, to the administrator, who shall grant or deny based on DMC § 25.120.010. Such request shall be processed with a Type III procedure per DMC § 25.175.010(4).
(Ord. 02-707 § 1; Ord. 05-790 § 8)

§ 25.120.060 Appeals.

Repealed by Ord. 05-790.
(Ord. 02-707 § 1)

§ 25.125.010 Title/purpose.

(1) 
Title. This chapter shall be entitled “Wireless Communications Facilities.”
(2) 
Purpose and Intent. The purpose and intent of this chapter is to:
(a) 
Implement Section 6409 of the “Middle Class Tax Relief and Job Creation Act of 2012” (the “Spectrum Act”) (PL-112-96; codified at 47 U.S.C. Section 1455(a)) which requires the city to approve any eligible facilities request and the Federal Communications Commission (FCC) rules set forth at 47 C.F.R. Part 1 (Part 1 – Practice and Procedure), new Subpart CC Section 1.6100 (Wireless Facility Modifications), which rules implement § 6409 of the Spectrum Act and to create consistency with all rules adopted by the FCC impacting local regulatory authority over the siting of wireless communications facilities;
(b) 
Establish appropriate locations, site development standards, and permit requirements for wireless communications facilities (WCF) within the city, in a manner that facilitates deployment of WCFs in a manner that is, to the maximum extent feasible, consistent with the residential character of the city. This chapter is intended to provide for the managed construction, installation, maintenance and removal of WCFs to accommodate the communications needs of residents, businesses and visitors, to accommodate the need for connection of such services to WCFs in adjacent and surrounding communities, while protecting the public health, safety, and general welfare of the community, and minimizing the visibility of WCFs, consistent with applicable law.
(3) 
The requirements of this chapter:
(a) 
Ensure compatibility of proposed facilities with surrounding areas by establishing standards for location, height, structural integrity, design review, landscaping, visual screening;
(b) 
Sustain the peaceful character of the city by establishing standards to reduce the potential of WCFs to produce disruptive noise, vibrations, or illumination; and to assist in identification of potential sources of interference with existing telephone, radio, television, or electronic computing systems currently in use in the area;
(c) 
Encourage the location of towers in non-residential areas to avoid, unless required by applicable law, the location of towers in residential areas;
(d) 
Strongly encourage the colocation of WCFs on new and existing sites to minimize the total number of towers;
(e) 
Effectively manage WCFs in the public rights-of-way; and
(f) 
Reduce the apparent quantity of WCFs by providing incentives and other inducements to utilize colocation and concealment and camouflage design techniques, selective placement and screening thereby lessening adverse visual impacts of these facilities on developed residential areas and natural surroundings.
(Ord. 22-1119 § 1)

§ 25.125.020 Definitions.

(1) 
“Accessory equipment”
means any equipment serving or being used in conjunction with a wireless communications facility. The term includes utility or transmission equipment, power supplies, generators, batteries, cables, equipment buildings, cabinets and storage sheds, shelters or similar equipment.
(2) 
“Abandoned”
means a wireless communications facility that is not in use for six consecutive months.
(3) 
“Accessory wireless communication antenna”
means a ground-mounted (freestanding) or building-mounted (attached) antenna for the sole use of residents, patrons of a business, or other occupants of property for the original transmission or final reception of communications or data as an accessory to a permitted use on the property where the antenna is located. Types of accessory wireless communication antennas include:
(a) 
Category I (Amateur Radio Antenna). “Send and receive” citizen band radio antennas or similar antennas operated by a federally licensed amateur (“ham”) radio operator at a dwelling, with an antenna height not exceeding the maximum height for buildings on the property upon which the antenna is located, except as provided otherwise in DMC § 25.125.050(4)(f).
(b) 
Category II (Accessory Mobile Antenna Device). An antenna such as a mobile test antenna, global positioning satellite (GPS) equipment, or mobile radio or television antennas which are less than 12 inches in height or width, excluding the support structure.
(4) 
“Antenna”
means any system of panels, rods, reflecting discs or similar devices used for the transmission or reception of radio frequency signals. Types of antennas include, but are not limited to:
(a) 
“Omnidirectional antenna” (also known as a whip antenna)
transmits and receives radio frequency signals in a 360-degree radial pattern. For the purpose of this chapter, an omnidirectional antenna is up to 20 feet in height and up to four inches in diameter.
(b) 
“Directional antenna” (also known as a panel antenna)
transmits and receives radio frequency signals in a specific directional pattern of less than 360 degrees.
(c) 
“Parabolic antenna” (also known as a dish antenna)
is a bowl-shaped device for the reception and/or transmission of radio frequency communications signals in a specific directional pattern.
(5) 
“Attached wireless communication facility”
means a wireless communication facility that is affixed to a base station. Examples of attached wireless communication facilities include antennas affixed to or erected upon existing buildings, water tanks, or other existing structures.
(6) 
“Base station”
means structure or equipment at a fixed location that enables FCC-licensed or authorized wireless communications between user equipment and a communications network. The definition of “base station” does not include or encompass a tower as defined herein or any equipment associated with a tower. “Base station” does include, without limitation:
(a) 
Equipment associated with wireless communications services such as private broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul that, at the time the relevant application is filed with the city under this chapter, has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing such support.
(b) 
Radio transceivers, antennas, coaxial or fiber-optic cable, regular and backup power supplied, and comparable equipment, regardless of technological configuration (including distributed antenna systems (“DAS”) and small-cell networks) that, at the time the relevant application is filed with the city under this chapter, has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing such support.
The definition of “base station” does not include any structure that, at the time the relevant application is filed with the city under this chapter, does not support or house equipment described in subsections (6)(a) and (b) of this section.
(7) 
“Colocation”
means (a) for the purposes of eligible facilities requests, the mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communications purposes; (b) for the purposes of facilities subject to shot clocks governed by 47 U.S.C. Section 332, attachment of facilities to existing structures, regardless of whether the structure or location has previously been zoned for wireless facilities.
(8) 
“Camouflage” or “camouflage design techniques”
means measures used in the design and siting of wireless communication facilities with the intent to minimize or eliminate the visual impact of such facilities to surrounding uses. A WCF site utilizes camouflage design techniques when it (a) is integrated as an architectural feature of an existing structure such as a cupola, or (b) is integrated in an outdoor fixture such as a water tank, while still appearing to some extent as a WCF. This definition does not include the use of concealment design elements so that a facility looks like something other than a wireless tower or base station.
(9) 
“Concealment”
means utilization of elements of stealth design in a facility so that the facility looks like something other than a wireless tower or base station. Language such as “stealth,” “camouflage,” or similar in any permit or other document required by this code is included in this definition to the extent such permit or other document reflects an intent at the time of approval to condition the site's approval on a design that looks like something else. “Concealment” can further include a design which mimics and is consistent with the nearby natural or architectural features (such as an artificial tree), or is incorporated into (including without limitation, being attached to the exterior of such facility and painted to match it) or replaces existing permitted facilities (including without limitation, stop signs or other traffic signs or freestanding light standards) so that the presence of the WCF is not apparent. This definition does not include conditions that merely minimize visual impact but do not incorporate concealment design elements so that the facility looks like something other than a wireless tower or base station.
(10) 
“Eligible facility request”
means any request for modification of an eligible support structure that does not substantially change the physical dimensions of an eligible support structure and which involves (a) colocation of new transmission equipment; (b) removal of transmission equipment; or (c) replacement of transmission equipment. A request for modification of an existing tower or base station that does not comply with the generally applicable building, structural, electrical, and safety codes or with other laws codifying objective standards reasonably related to health and safety, or does not comply with any relevant federal requirements, is not an eligible facilities request.
(11) 
“Eligible support structure”
means any base station or tower as defined in this chapter; provided, that it is existing at the time the relevant application is filed.
(12) 
“Equipment cabinet”
means a room, cabinet, or building used to house equipment used by telecommunication providers at a wireless communications facility. This definition does not include relatively small electronic components, such as remote radio units, radio transceivers, amplifiers, or other devices mounted behind antennas, if they are not used as physical containers for smaller, distinct devices.
(13) 
“Existing”
means, for purposes of this chapter, a constructed tower or base station that was reviewed, approved, and lawfully constructed in accordance with all requirements of applicable law as of the time of an eligible facilities request; provided, that a tower that exists as a legal, nonconforming use, and was lawfully constructed, is existing for purposes of this definition.
(14) 
“Height”
means, for this purpose of this chapter, the distance measured from ground level to highest point on the wireless communication facility, including an antenna or piece of equipment attached thereto. In the case of “crank-up” or similar towers whose height can be adjusted, the height of the tower shall be the maximum height to which it is capable of being raised.
(15) 
“OTARD” (over the air receiving device)
means:
(a) 
An antenna that is designed to receive direct broadcast satellite service, including direct-to-home satellite services, that is one meter or less in diameter; or
(b) 
An antenna that is designed to receive video programming services via multipoint distribution services, including multichannel multipoint distribution services, instruction television fixed services, and local multipoint distribution services, and that is one meter or less in diameter or diagonal measurement; or
(c) 
An antenna that is designed to receive television broadcast signals.
(16) 
“Public right-of-way”
means any public highway, street, alley, sidewalk, parkway, and all extensions or additions thereto which are either owned, operated, or controlled by the city, or are subject to an easement or dedication to the city, or are a privately owned area within city's jurisdiction which is not yet dedicated, but is designated as a proposed public right-of-way on a preliminary subdivision map approved by the city.
(17) 
“Related accessory equipment”
means the transmission equipment customarily used with, and incidental to, wireless communication facilities antennas, including by way of example, coaxial or fiber-optic cable, regular and backup power supply and remote radio units.
(18) 
“Roof/building-mounted site”
means any WCF, and any appurtenant equipment, located on a rooftop or building, having no support structure such as a monopole or other type of tower.
(19) 
“Small cell facility”
means a personal wireless services facility that meets both of the following qualifications:
(a) 
Each antenna is located inside an antenna enclosure of no more than three cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than three cubic feet; and
(b) 
Primary equipment enclosures are no larger than 17 cubic feet in volume. The following associated equipment may be located outside the primary equipment enclosure and if so located, are not included in the calculation of equipment volume: electric meter, concealment, telecom demarcation box, ground-based enclosures, battery backup power systems, grounding equipment, power transfer switch, and cut-off switch.
(20) 
“Substantial change”
means a modification that changes the physical dimensions of an eligible support structure so that after the modification, the structure meets any of the following criteria:
(a) 
For towers other than poles or other vertical structures in the rights-of-way, it increases the height of the tower by more than 10 percent or by the height of one additional antenna array with separation from the nearest existing antenna not to exceed 20 feet, whichever is greater, as measured from the top of an existing antenna to the bottom of a proposed new antenna; for other eligible support structures, it increases the height of the structure by more than 10 percent or more than 10 feet, whichever is greater, as measured from the top of an existing antenna to the bottom of a proposed new antenna;
(b) 
For towers, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than 20 feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for eligible support structures, it involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six feet;
(c) 
For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, as determined on a case-by-case basis based on the location of the eligible support structure but not to exceed four cabinets per application; or for base stations, it involves installation of any new equipment cabinets on the ground if there are no preexisting ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than 10 percent larger in height or overall volume than any other ground cabinets associated with the structure;
(d) 
It entails any excavation or deployment outside of the current site, except that, for towers other than towers in the public rights-of-way, it entails any excavation or deployment of transmission equipment outside of the current site by more than 30 feet in any direction. The site boundary from which the 30 feet is measured excludes any access or utility easements currently related to the site.
(e) 
For any eligible support structure, it would defeat the concealment elements of the eligible support structure by causing a reasonable person to view the structure's intended stealth design as no longer effective;
(f) 
For any eligible support structure, it does not comply with record evidence of conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment, unless the noncompliance is due to an increase in height, increase in width, addition of cabinets, or new excavation that would not exceed the thresholds identified in subsections (20)(a) through (d) of this section.
(21) 
“Wireless communications facility”
means a facility used to provide personal wireless services as defined at 47 U.S.C. Section 332(c)(7)(C); or wireless information services provided to the public or to such classes of users as to be effectively available directly to the public via licensed or unlicensed frequencies; or wireless utility monitoring and control services. A WCF does not include a facility entirely enclosed within a permitted building where the installation does not require a modification of the exterior of the building; nor does it include a device attached to a building, used for serving that building only and that is otherwise permitted under other provisions of this code. A WCF includes an antenna or antennas, including without limitation directional, omnidirectional and parabolic antennas, base stations, support equipment, small cell facilities, and towers. It does not include the support structure to which the WCF or its components are attached if the use of such structures for WCFs is not the primary use. The term does not include mobile transmitting devices used by wireless service subscribers, such as vehicle or handheld radios/ telephones and their associated transmitting antennas, nor does it include other facilities specifically excluded from the coverage of this chapter.
(22) 
“Tower”
means any structure that is designed and built for the sole or primary purpose of supporting any FCC-licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the associated site. “Towers” may include:
(a) 
“Lattice tower”
is a wireless communication support structure which consists of vertical and horizontal supports and metal crossed strips or bars to support antennas and connecting appurtenances. Lattice towers may or may not be supported by guy wires (see “guyed tower”).
(b) 
“Monopole tower”
is a single freestanding pole structure used to support wireless communication support structure which consists of a single pole structure to support antennas and connecting appurtenances.
(c) 
“Guyed tower”
is any variety of wireless communication support structures (usually over 100 feet tall) using guy wires connecting above grade portions of a communication support structure diagonally with the ground to provide support for wireless communication towers, antennas, and connecting appurtenances.
(Ord. 22-1119 § 1)

§ 25.125.030 Operational standards.

(1) 
Federal Requirements. All WCFs shall meet the current standards and regulations of the FAA, the FCC and any other agency of the federal government with the authority to regulate WCFs. If such standards and regulations are changed, then the owners of the WCF governed by this chapter shall bring such facility into compliance with such revised standards and regulations within the time period mandated by the controlling federal agency. Failure to meet such revised standards and regulations shall constitute grounds for the removal of the WCF at the owner's expense.
(2) 
Operation and Maintenance. To ensure the structural integrity of WCFs, the owner of a WCF shall ensure that it is maintained in compliance with standards contained in applicable local building and safety codes. If upon inspection, the city determines that a WCF fails to comply with such codes and constitutes a danger to persons or property, then, upon written notice being provided to the owner of the WCF, the owner shall have 30 days from the date of notice to bring such WCF into compliance. Upon good cause shown by the owner, the city may extend such compliance period not to exceed 90 days from the date of said notice. If the owner fails to bring such WCF into compliance within said time period, the city may remove such WCF at the owner's expense. No hazardous materials shall be permitted in association with WCFs, except those necessary for the operations of the WCF and only in accordance with all applicable laws governing such materials.
(3) 
Radio Frequency Standards. All WCFs shall comply with federal standards for radio frequency emissions. If concerns regarding compliance with radio frequency emissions standards for a WCF have been made to the city, the city may request that the owner or operator of the WCF provide information demonstrating compliance. If such information is not sufficient, in the reasonable discretion of the city, to demonstrate compliance, the city may request and the owner or operator of the WCF shall submit a project implementation report which provides cumulative field measurements of radio frequency emissions of all antennas installed at the subject site, and which compares the results with established federal standards. If, upon review, the city finds that the facility does not meet federal standards, the city may require corrective action within a reasonable period of time, and if not corrected, may require removal of the WCF pursuant to subsection (1) of this section. Any reasonable costs incurred by the city, including reasonable consulting costs to verify compliance with these requirements, shall be paid by the applicant.
(4) 
Signal Interference. All WCFs shall be designed and sited so as not to cause interference with the normal operation of radio, television, telephone and other communication services utilized by adjacent residential and nonresidential properties; nor shall any such facilities interfere with any public safety communications. The applicant shall provide a written statement (“signal interference letter”) from a qualified radio frequency engineer, certifying that a technical evaluation of existing and proposed facilities indicates no potential interference problems.
(5) 
Abandonment and Removal. A WCF may be determined to be abandoned for discontinued use or if the facility falls into disrepair or noncompliance due to neglect of maintenance.
(a) 
Abandonment Due to Discontinued Use.
(i) 
The owner and/or operator of a WCF shall notify the city in writing when a WCF will be abandoned or otherwise removed from service, if no replacement or upgrade is planned for the site. Failure to provide such notice within 90 days of abandonment shall be deemed a violation of this code and subject the owner and operator to penalties for civil infractions in an amount of $1,000.
(ii) 
A WCF shall be determined to be abandoned if use of the facility is discontinued for six months. Within 90 days after notice from the city that a facility has been determined to be abandoned due to discontinued use, or in response to a notification of abandonment under subsection (5)(a)(i) of this section, the owner of the WCF shall either reestablish use of the site or remove all equipment, support structures, and appurtenances and substantially restore the site's original conditions. In the event two or more wireless communication service providers are colocated on a tower or base station, the facility shall not be considered abandoned due to discontinued use unless all users cease use of the facility. Failure to comply with these requirements is deemed a violation of this code and subject the owner and operator to penalties for civil infractions in an amount of $500.00 per day of noncompliance.
(b) 
Abandonment Due to Disrepair or Noncompliance. In the event a WCF falls into disrepair or noncompliance due to neglect of maintenance, the facility shall be determined to be abandoned if repairs are not effected to restore compliance within 30 days after notice of noncompliance from the city. Failure to comply within 30 days shall result in expiration by limitation of prior approvals for the facility. Failure to comply with these requirements is deemed a violation of this code and subject the owner and operator to penalties for civil infractions in an amount of $500.00 per day of noncompliance.
(c) 
Expiration of Prior Approvals. Failure of a WCF owner or operator to reestablish use of a facility within 90 days after notice of abandonment due to discontinuance, or failure of a WCF owner to effect repairs to restore compliance within 30 days after notice of noncompliance due to disrepair or neglect of maintenance, shall result in expiration of all prior approvals for the facility by the city. Any proposal to reestablish a WCF facility after such expiration shall be treated as a new application subject to reviews, approvals, and fees required by this code.
(d) 
Liability for Noncompliance. No time period stated herein shall relieve the owner of a WCF from responsibility to maintain a facility safely and in accordance with all applicable laws and regulations.
(e) 
Responsibility of the Property Owner. In addition to the responsibility of the owner of a WCF for repair or removal of a facility, the owner of the property upon which the WCF is placed retains ultimate responsibility for care and custody of the premises, and may be required in cases of abandonment to remove unused or noncomplying facilities.
(f) 
Appeal. Civil infractions issued pursuant to this section are appealable to the city hearing examiner per Chapter 1.11 DMC.
(6) 
Noise generated on the site must not exceed the levels permitted in this code, except that a WCF owner or operator shall be permitted to exceed code noise standards for a reasonable period during repairs, not to exceed two hours without prior authorization from the city.
(7) 
Hazardous Materials. No hazardous materials shall be permitted in association with WCFs in the right-of-way, except those necessary for the operations of the WCF and only in accordance with all applicable laws governing such materials.
(Ord. 22-1119 § 1)

§ 25.125.040 Review procedures and requirements.

(1) 
Permit Required. A WCF permit must be obtained prior to construction, installation, and/or placement within the city of any WCF in the city. Except for complete applications for eligible facilities requests, applications for WCFs shall be processed in accordance with the project permit processing requirements of Chapter 25.175 DMC. Final decisions and appeal authorities for such permits are as described in Chapter 25.175 DMC.
(2) 
Exemption for Certain Accessory Wireless Communication Antennas. Accessory wireless communication antennas are exempt from WCF permit requirements. The following are exempt from this chapter:
(a) 
Licensed amateur (ham) radio antennas, as defined in DMC § 25.125.020(3)(a);
(b) 
OTARD antennas and associated masts; and
(c) 
Temporary WCFs placed in service for a maximum of one week or during an emergency declared by a governmental agency.
(3) 
WCF Permit Application Submittal Requirements. The following information shall be required as part of every permit application:
(a) 
A completed WCF permit application form.
(b) 
A statement made by the applicant or the owner that the applicant is representing that all WCFs that are the subject of the application shall comply with federal standards for radio frequency emissions and shall be designed, sited and operated in accordance with applicable federal regulations addressing radio frequency interference.
(c) 
A radio frequency emissions compliance report. A written report, prepared, signed and sealed by a Washington-licensed professional engineer or competent employee of the applicant which assesses whether the proposed WCF demonstrates compliance with the exposure limits established by the FCC. The report shall include a detailed description of all mitigation measures required by the FCC.
(d) 
A signed statement indicating that the proposed WCF will not cause local interference with neighboring transmission or reception functions.
(e) 
Scaled site and elevation drawings, photo simulations, and any other supporting documents showing the type, size, height, and location of the proposed antenna.
(f) 
Applicable permit fees. Permit fees for WCF permits shall be set out in the city fee schedule adopted by council.
(i) 
Related Fees. Where the WCF proposed requires issuance of a conditional use permit, permit fees shall be as set by resolution of the city council plus all reasonable consulting costs incurred by the city to verify technical data and specialized technical, legal and/or regulatory information supplied by the applicant in conjunction with the processing of the permit.
(4) 
Building Permits. In addition to submittal requirements in subsections (1) and (3) of this section, accessory wireless communication antennas are not required to obtain building permits unless alteration of a structure is required to accommodate the equipment. WCF applicants for facilities that are not exempt accessory wireless communication antennas requiring building permits shall submit:
(5) 
Permit Applications. Applications for WCF permits shall be submitted to and processed by the community development department. Applicants for WCFs must obtain a WCF permit prior to construction of the facility. A WCF permit may include conditions to mitigate potential impacts that result from the facility. WCF permit applications shall be processed and reviewed in accordance with Chapter 25.175 DMC.
(6) 
Compliance with Zoning Provisions Required. Pursuant to requirements of DMC Title 25 all WCFs must comply with the requirements of each zoned district for permitted, accessory, and conditional uses.
(7) 
Utility Permits. In addition to WCF permits and conditional use permits, WCF applicants must submit an application, plans, specifications, and other materials necessary to obtain any applicable utility permits. Utility permits may be applied for either concurrently with or after site plan or conditional permit approvals.
(8) 
Procedure for Towers. In addition to submittal requirements for WCF permits in subsection (3) of this section, submittals must also include:
(a) 
A completed conditional use permit application.
(b) 
A diagram or map showing the viewshed of the proposed facility.
(c) 
Photo simulations of the proposed facility from affected residential properties and rights-of-way at varying distances.
(d) 
A visual impact assessment consisting of either a physical mock-up of the facility, computer simulation, or some other means that includes the nearest adjacent property to illustrate the siting of the tower is located in the least visually obtrusive location possible.
(e) 
A site/landscaping plan signed and sealed by appropriate qualified professionals showing the specific placement and dimensions of the WCF on the site; showing locations of existing structures, trees, and other significant site features; and indicating type and location of plant materials used to screen WCF components and proposed colors for the WCF, setbacks, fencing, landscaping, adjacent uses, drainage, compliance with the city's intersection and driveway sight distance standards; and other information deemed by the director of community development (“director”) to be necessary to assess compliance with this section.
(f) 
A statement in a form approved by the city attorney signed by the WCF service provider and the property owner of the proposed site agreeing:
(i) 
To potential colocation of additional infrastructure from third-party WCF service providers on the applicant's structure or within the same site location;
(ii) 
That the WCF service provider will remove the facility and related accessory equipment if the site is abandoned as a result of discontinued use for six months or if the site falls into disrepair; and
(iii) 
That if a WCF service provider fails to remove the facility within 90 days after notice of abandonment by the city, responsibility for removal shall fall upon the landowner.
(9) 
Specific Review Procedures for Eligible Facilities Requests.
(a) 
Applicability – Sole and Exclusive Procedure. Except as may be otherwise provided in this section, and notwithstanding any other provisions in this code, the provisions of this subsection shall be the sole and exclusive procedure for review and approval of a proposed eligible facilities request. Notwithstanding the foregoing, all WCFs including EFRs must comply with operational standards in DMC § 25.125.030. To the extent that other provisions of this code establish a parallel process for review and approval of a project permit application for a proposed facilities modification, the provisions of this section shall control. In the event that any part of an application for project permit approval includes an eligible facilities request, the proposed facilities modification portion of the application shall be reviewed under the provisions of this section.
(b) 
Reservation of Authority. Nothing herein is intended or shall operate to waive or limit the City's right to enforce, or condition approval on, compliance with generally applicable building, structural, electrical, and safety codes and with other laws codifying objective standards reasonably related to health and safety.
(c) 
Application Submittal Requirements.
(i) 
Purpose. The director or his/her designee shall prepare, and periodically revise and make publicly available, an application form which shall be limited to the information necessary for the city to consider whether an application is an eligible facilities request. This section sets forth the submittal requirements for an eligible facilities request. The purpose of the submittal requirements is to ensure that the city has all information and documentation that is reasonably necessary to determine if the applicant's proposed facilities modification will substantially change the physical dimensions of an eligible support structure. The submittal requirements are not intended to require the applicant to establish the need for the proposed modifications or to justify the business decision to propose such modifications. An eligible facilities request permit is required prior to implementing the proposed modification.
(ii) 
No eligible facilities request application shall be deemed complete unless it is in writing, accompanied by the applicable application and fee, includes the required submittals, and is attested to by the authorized person submitting the application on behalf of the applicant, certifying the truth and accuracy of the information provided in the application. The application shall include the following submittals, unless waived by the director:
(A) 
A complete eligible facilities request application form provided by the city.
(B) 
If the applicant is not the owner or person in control of the eligible support structure and/or site, an attestation that the owner or person in control of the eligible support structure and/or site has consented to the proposed facilities modification shall be required. If the eligible support structure is located in a public right-of-way, the applicant must also attest that applicant has authorization to install, maintain and operate transmission equipment in, under and above the public right-of-way.
(C) 
Complete copies of the underlying land use approvals for siting of the base station, or tower proposed to be modified, establishing that, at the time of submittal of the application, such tower or base station constituted an eligible support structure.
(D) 
If the applicant proposes a modification that will result in an increase in height of the eligible support structure, the following shall be required: record drawings, as-built plans, or the equivalent, showing the height of the eligible support structure, (1) as originally constructed and granted approval by the city or other applicable local zoning or similar regulatory authority, or (2) as of the most recent modification that received city, or other local zoning or regulatory approval, prior to the passage of the Spectrum Act, whichever height is greater.
(E) 
If the applicant proposes a modification to an eligible support structure, which structure, or proposed modification of the same, is subject to conditions associated with siting approval or requirements imposed by a reviewing official or decision-making body pursuant to authority granted under this code, or an ordinance or a municipal code of another local government authority, the following shall be required: a copy of the document (e.g., SEPA, CUP or SUP) setting forth such preexisting mitigations, restrictions or requirements together with a certification that the proposed facilities modification conforms to such mitigations, restrictions or requirements; provided, that such certification shall have no application to the extent the proposed facilities modification relates solely to an increase in height, increase in width, addition of equipment cabinets, or new excavation, that does not result in a substantial change in the physical dimensions of the eligible support structure.
(F) 
If the applicant proposes a modification to an eligible support structure, which structure, or proposed modification of the same, is subject to preexisting concealment restrictions or requirements, or was constructed with concealment elements, the following shall be required: applicant shall set forth the facts and circumstances demonstrating that the proposed modification would not defeat the existing concealment elements of the eligible support structure. If the proposed modification will alter the exterior dimensions or appearance of the eligible support structure, applicant shall include a detailed visual simulation depicting how the eligible support structure will appear after the proposed modification is complete. The visual simulation shall depict to scale the eligible support structure in relation to the trees, landscaping and other structures adjacent to, or in the immediate vicinity of, the eligible support structure.
(G) 
If the applicant proposes a modification that will protrude from the edge of a base station, the following shall be required: record drawings, as-built plans, or the equivalent, showing at a minimum the edge of the eligible support structure at the location of the proposed modification.
(H) 
If the applicant proposes a modification to an eligible support structure that will (1) include any excavation, or for towers other than poles in the right-of-way, excavation of greater than 30 feet in any direction, (1) would result in a protrusion from the edge of a tower that exceeds an existing protrusion of any transmission equipment attached to a tower, or (2) would protrude from the edge of a base station, the following shall be required: a description of the boundaries of the site together with a scale drawing based on an accurate traverse, with angular and lineal dimensions, depicting the boundaries of the site in relation to the tower or base station proposed to be modified and depicting the proposed location, elevation and dimensions of the new or replacement transmission equipment.
(I) 
A radio frequency emissions compliance report. A written report, prepared, signed and sealed by a Washington-licensed professional engineer or competent employee of the applicant which assesses whether the proposed WCF demonstrates compliance with the exposure limits established by the FCC.
(J) 
If the applicant proposes a modification to a tower, the following shall be required: a stamped report by a state of Washington registered professional engineer demonstrating that the tower with the proposed modifications will comply with applicable structural, electrical and safety codes, including by way of example, and not limitation, EIA/TIA-222-Revision G, published by the American National Standards Institute (as amended), allowable wind speed for the applicable zone in which the tower is located, and describing the general structural capacity of the tower with the proposed modifications, including: (1) the number and type of antennas that can be accommodated; (2) the basis for the calculations of capacity; and a written statement that the proposal complies with all federal guidelines regarding the interference and ANSI standards as adopted by the FCC, including but not limited to nonionizing electromagnetic radiation (NIER) standards. The city may retain the services of an independent technical expert to review, evaluate, and provide an opinion regarding the applicant’s demonstration of compliance.
(K) 
If the applicant proposes a modification requiring (1) alteration to an eligible support structure, (2) excavation, installation of new equipment cabinets, or any other activities impacting or altering the land, existing structures, fencing, or landscaping on the site, the following shall be required: a detailed site plan and drawings showing the true north point, a graphic scale and drawn to an appropriate decimal scale, indicating and depicting (a) the location, elevation and dimensions of the eligible support structure, (b) the location, elevation and dimensions of the existing transmission equipment, (c) the location, elevation and dimensions of the transmission equipment, if any, proposed to be colocated or that will replace existing transmission equipment, (d) the location, elevation and dimensions of any proposed new equipment cabinets and the intended use of each, (e) any proposed modification to the eligible support structure, (f) the location of existing structures on the site, including fencing, screening, trees, and other significant site features, and (g) the location of any areas where excavation is proposed showing the elevations, depths, and width of the proposed excavation and materials and dimensions of the equipment to be placed in the area excavated.
(d) 
Waiver of Submittal Requirement. The director may waive any submittal requirement upon determination that the required submittal, or part thereof, is not reasonably related to the substantial change criteria. A waiver, to be effective, must be in writing and signed by the director.
(e) 
Processing EFR Applications.
(i) 
Type of Review. Upon receipt of an application for an eligible facilities request pursuant to this subsection, the city shall review such application to determine whether the application so qualifies.
(ii) 
Time Frame for Review. Subject to the tolling provisions of subsection (9)(e)(iii) of this section, within 60 calendar days of the date on which an applicant submits an application seeking approval under this section, the city shall approve the application unless it determines that the application is not covered by this section.
(iii) 
Tolling of the Time Frame for Review. The 60 calendar day review period begins to run when the application is filed, and may be tolled only by mutual agreement of the city and the applicant, or in cases where the city determines that the application is incomplete:
(A) 
To toll the time frame for incompleteness, the city must provide written notice to the applicant within 30 calendar days of receipt of the application, specifically delineating all missing documents or information required in the application;
(B) 
The time frame for review begins running again when the applicant makes a supplemental written submission in response to the city’s notice of incompleteness; and
(C) 
Following a supplemental submission, the city will notify the applicant within 10 business days that the supplemental submission did not provide the information identified in the original notice delineating missing information. The time frame is tolled in the case of second or subsequent notices pursuant to the procedures identified in this subsection (9)(e)(iii). In the case of a second or subsequent notice of incompleteness, the city may not specify missing documents or information that were not delineated in the original notice of incompleteness.
(iv) 
Failure to Act. In the event the city fails to act on an eligible facilities request under this section within the time frame for review, accounting for any tolling, the request shall be deemed granted. The deemed grant becomes effective when the applicant notifies the city in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted.
(v) 
Interaction with Telecommunications Act Section 332(c)(7). If the city determines that the applicant’s request is not an eligible facilities request as delineated in this chapter, the city will, in its notice to the applicant, advise of any additional filing requirements that may be required by this chapter in order to have the application considered as a WCF that is not an eligible facilities request. If the applicant chooses to submit a request for consideration of its application as a WCF that is not an eligible facilities request, the presumptively reasonable time frame under Section 332(c)(7), as prescribed by the FCC, will begin to run from the filing of such completed information.
(10) 
Specific Review Procedures for Small Cell Facilities. Within 10 business days of receipt of an application for a small cell facility, the city shall provide written comments to the applicant determining completeness of the application and setting forth any modifications required to complete the application to bring the proposal into full compliance with the requirements of this subsection.
(a) 
To toll the time frame for incompleteness, the city must provide written notice to the applicant within 10 business days of receipt of the application, specifically delineating all missing documents or information required in the application.
(b) 
The time frame for review resets to zero when the applicant makes a supplemental written submission in response to the city's notice of incompleteness.
(c) 
Following a supplemental submission, the city will notify the applicant within 10 business days whether the supplemental submission provided the information identified in the original notice delineating missing information. If the application remains incomplete, the time frame is tolled pursuant to the procedures identified in subsections (10)(a) and (b) of this section. In the case of a second or subsequent notice of incompleteness, the city may not specify missing information or documents that were not delineated in the original notice of incompleteness.
(11) 
Compliance with Applicable Law.
(a) 
Notwithstanding the approval of an application for new WCFs, eligible facilities requests, or for colocation as described herein, all work done pursuant to WCF applications must be completed in accordance with all applicable building, structural, electrical and safety requirements as set forth in this code and any other applicable federal, state, and/or local laws and regulations. In addition, all WCF applications shall comply with the following:
(i) 
Comply with any permit or license issued by a local, state, or federal agency with jurisdiction of the WCF;
(ii) 
Be maintained in good working condition and to the standards established at the time of application approval; and
(iii) 
Remain free from trash, debris, litter, graffiti, and other forms of vandalism. Any damage shall be repaired as soon as practicable, and in no instance more than 10 calendar days from the time of notification by the city or after discovery by the owner or operator of the site.
(b) 
Compliance Report. Upon request by the city, the applicant shall provide a compliance report within 45 days after installation of a WCF, demonstrating that as installed and in operation, the WCF complies with all conditions of approval, applicable code requirements, and standard regulations.
(Ord. 22-1119 § 1)

§ 25.125.050 Design and development standards.

The requirements set forth in this section shall apply to the location and design of all WCFs governed by this section as specified below; provided, however, that the city may waive any one or more of these requirements it if determines that the goals of this section are better served thereby. WCFs shall be designed and located to minimize the impact on surrounding properties and residential neighborhoods and to maintain the character and appearance of the city, consistent with other provisions of this code.
(1) 
Concealment/Camouflage Required. All WCFs and any transmission equipment shall, to the maximum extent possible, use concealment design techniques, and where not possible utilize camouflage design techniques.
(a) 
Design, materials, and colors of WCFs shall be compatible with the surrounding environment. Designs shall be compatible with structures and vegetation located in the right-of-way and on adjacent parcels.
(b) 
Concealment and/or camouflage design may be of heightened importance where findings of particular sensitivity are made (e.g., proximity to historic or aesthetically significant structures, views, and/or community features). Where WCFs are located in areas of high public visibility, they shall, where physically possible, be designed to be concealed, and where not possible to be concealed, to minimize the WCF profile through placement of equipment fully or partially underground, or by way of example and not limitation, behind landscape berms.
(c) 
A concealment design technique may include the use of base stations and other structures should the director determine that such design meets the intent of these chapters and the community is better served thereby.
(d) 
All WCFs, such as antennas, vaults, equipment rooms, equipment enclosures, and towers shall be constructed of nonreflective materials (visible exterior surfaces only).
(2) 
Siting. WCFs in the right-of-way shall be sited in a manner that evaluates the proximity of the facility to residential property. When placed near residential property, a stand-alone WCF (e.g., a new pole, and not a WCF placed on an existing street light pole, electric distribution or telephone pole, traffic signal pole, or other existing vertical structure) shall be placed adjacent to the common side yard property line between adjoining residential properties, such that the WCF minimizes visual impacts equitably among adjacent properties. In the case of a corner lot, the WCF may be placed adjacent to the common side yard property line between adjoining residential properties, or on the corner formed by two intersecting streets. If these requirements are not feasible from a construction, engineering, or design perspective, the applicant may submit a written statement to the director requesting the WCF be exempt from these requirements.
(3) 
Lighting. WCFs shall not be artificially lighted, unless required by the FAA or other applicable governmental authority, or the WCF is mounted on a light pole or other similar structure primarily used for lighting purposes. If lighting is required, the city may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. Lighting shall be shielded or directed to the greatest extent possible to minimize the amount of glare and light falling onto nearby properties, particularly residences. Any necessary lighting must comply in all respects with the city's dark sky ordinance provisions.
(4) 
Development Standards for Accessory Wireless Communications Antennas.
(a) 
Allowed as Accessory Uses. Accessory wireless communication antennas are allowed by DMC Title 25 as accessory uses in all zoning districts.
(b) 
Categories/Use Limits/Maximum Size and Height. Accessory wireless communication antennas consist of ground mounted (freestanding) or building mounted (attached) antenna for the sole use of residents, patrons of a business, or other occupants of property sending or receiving communications or data as an accessory to a permitted use on the property on which the antenna is located. Categories of accessory wireless communication antennas are described in DMC § 25.125.020. Unless otherwise provided elsewhere in this code, the size and height limitations of accessory wireless communication antennas are governed by the zoning district in which the facilities are located.
(c) 
Exempt Accessory Wireless Communication Antennas. Accessory wireless communication antennas that qualify as OTARD facilities are exempt from the requirement to obtain a WCF permit.
(d) 
Location. Except OTARD facilities and associated masts, no freestanding accessory wireless communication antennas, support structures for antennas, nor metal guys attached to any antennas shall be located in a required front, side, or rear yard. In cases where the principal building on a lot is set back a greater distance from a front or side street than required by zoning regulations for yards, no antenna nor antenna support shall be located between the principal building and a public street.
(e) 
Landscaping. Except for OTARD facilities, wherever feasible, freestanding parabolic (dish) antennas shall be screened from views on public rights-of-way by trees, shrubs, or other appropriate means of landscaping.
(f) 
Amateur Radio. In accordance with federal law, antennas and support structures used primarily for federally licensed amateur (“ham”) radio activities may exceed the maximum allowable height for buildings, provided a determination is made by the director that the proposed tower height is technically necessary to successfully engage in amateur radio communications; and provided, that the height be no more than the distance from the base of the antenna to the property line.
(5) 
Development Standards for Attached Wireless Communications Facilities.
(a) 
Attached WCFs Allowed. Attached WCFs are permitted uses in all zone districts as an accessory use, except in the Historic Village, except that it is prohibited to attach a nonaccessory WCF on a single-family or two-family dwelling.
(b) 
Types of attached WCFs are defined in DMC § 25.125.020(5) and include, but are not limited to, facilities that are erected upon existing buildings, water tanks, or other existing structures, but do not include base stations or towers.
(c) 
Design Requirements.
(i) 
Concealment Design Techniques Required. Attached WCFs shall be designed so that they are concealed, and where concealment is not possible, camouflaged.
(ii) 
Attachment to Trees Prohibited. It is prohibited to use any tree as a support for any attached WCFs; or to use any tree to attach any metal guy or cable supporting any attached antenna.
(iii) 
Colocation. Where feasible, construction of new attached WCFs on base stations shall be designed, engineered, and constructed to facilitate colocation of additional WCFs by other wireless service providers on the same structure.
(d) 
Setbacks for Attached Facilities. Attached WCFs shall conform to the following setback requirements:
(i) 
Property Lines and Required Yards. WCFs and transmission equipment mounted on building walls or roofs shall not extend over property lines nor into required setbacks in front, side or rear yard areas; provided, that the director may approve an encroachment into a required yard up to two feet for an antenna mounted on the face or wall of a building or structure, if the antenna is concealed to blend into the architecture of the building or structure on which placed.
(ii) 
Antennas Mounted Atop Structures. Antennas on rooftops must be either located or camouflaged so as not to be visible from adjacent rights-of-way.
(e) 
Maximum Heights. Except for colocations as required by federal law with respect to an eligible facilities request, attached WCFs in any zone district shall not exceed the maximum height allowed for structures in the same zone district by DMC Title 25; except that:
(i) 
Roof/building-mounted sites, which are at or near the maximum allowable height, may extend above the height limit in the manufacturing/ research park (MRP) and industrial (IND) districts with a maximum tower height of 100 feet, except that towers shall not penetrate imaginary airspace surfaces as defined by 14 C.F.R. Part 77.
(ii) 
A map shall be prepared by the applicant that provides detailed information on ground and imaginary airspace surface elevations for inspection by the community development department.
(6) 
Development Standards for Towers.
(a) 
Conditional Use Permit Required. Towers are permitted by conditional use permit in all zone districts, except that no towers shall be allowed in the residential, mixed use, commercial, community business, office, or open space districts.
(b) 
Design Requirements.
(i) 
Whenever practical, new towers shall be designed, engineered, and constructed to facilitate colocation of WCFs by other WCF providers on the same structure.
(ii) 
Color and Concealment Required. Towers and related accessory equipment shall, to the maximum extent possible, use concealment design techniques, and where not possible, utilize camouflage design techniques.
(iii) 
Attachment to Trees Prohibited. It is prohibited to use any tree as a support for any freestanding wireless communication antennas; or to use any tree to attach accessory or transmission equipment supporting any freestanding antenna.
(c) 
Setbacks for Towers. Towers shall conform to the following setback requirements:
(i) 
Rights-of-Way. Towers shall be set back from all rights-of-way a distance no less than one foot for every foot of tower height.
(ii) 
Residential Properties. Towers shall be set back from all adjacent residentially zoned properties a distance no less than two feet for every foot of tower height.
(iii) 
Nonresidential Properties. Towers shall be set back from all adjacent nonresidentially zoned properties a distance no less than one foot for every foot of tower height.
(d) 
Maximum Heights. Towers shall not exceed the maximum allowable heights for buildings in the same zone district; provided, however, that the maximum allowable height may be increased up to 100 feet.
(i) 
Roof/building-mounted sites, which are at or near the maximum allowable height, may extend above the height limit in the manufacturing/ research park (MRP) and industrial (IND) districts with a maximum tower height of 100 feet, except that towers shall not penetrate imaginary airspace surfaces as defined by 14 C.F.R. Part 77.
(e) 
Separation Between Facilities. No new towers may be constructed within 1,320 feet of any other tower.
(f) 
Related Accessory Equipment and Equipment Cabinets. Related accessory equipment and equipment cabinets shall be concealed, and where concealment is not possible shall be camouflaged.
(g) 
Landscaping and Tree Protection. Tree protection and landscaping plans are required pursuant to Chapters 25.90 and 25.120 DMC.
(i) 
To the greatest extent feasible, existing trees and other vegetation and new landscaping are utilized to screen WCFs and related buildings and transmission equipment from view from adjacent properties and public rights-of-way.
(ii) 
As necessary, full, moderate, or light buffers will be required to mitigate for incompatibility between towers as defined under DMC § 25.10.020.060.
(7) 
Provisions for Small Cell Facilities in the Right-of-Way.
(a) 
No new WCF shall be constructed in the public right-of-way and no colocation or modification to any WCF in the public right-of-way may occur except after a written request from an applicant, reviewed and approved by the city in accordance with this section; after execution of a license agreement with the city to use such structure by its owner; and upon issuance of any required permits. The only WCFs that may be permitted in the rights-of-way are small cell facilities. All work done pursuant to WCF applications must be completed in accordance with all applicable building and safety requirements as set forth in this code and any other applicable regulations.
(b) 
For purposes of this chapter, a standalone pole in the right-of-way, the sole or primary purpose of which is to house small cell facilities, shall not be treated as a tower, and shall be considered and approved under this section. Unless otherwise set forth in the license agreement between the city and an applicant for placement of small cell facilities in the public right-of-way, all small cell facilities in the public right-of-way, except eligible facilities requests, shall be reviewed pursuant to the following procedures:
(i) 
License to Use. The applicant shall execute a license agreement with the city, granting a nonexclusive license to use the right-of-way. Attachment of small cell facilities on an existing traffic signal, street light pole, or similar structure shall require written evidence of a license, or other legal right or approval, to use such structure by its owner. In its sole discretion, the city may prohibit or restrict the attachment of small cell facilities on certain city-owned poles, including, without limitation, ornamental street light poles.
(ii) 
Abandonment and Removal. If a small cell facility in the right-of-way has not been in use for a period of three months, the owner of the small cell facility shall notify the city of the nonuse and shall indicate whether reuse is expected within the ensuing three months. Any small cell facility that is not operated for a continuous period of six months shall be considered abandoned. The city, in its sole discretion, may require an abandoned small cell facility to be removed. The owner of such small cell facility shall remove the same within 30 days of receipt of written notice from the city. If such small cell facility is not removed within said 30 days, the city may remove it at the owner's expense. After removal for any reason, any approved permits for the small cell facility shall be deemed to have expired. Additionally, the city, in its sole discretion, shall not approve any new small cell facility applications until the applicant who is also the owner or operator of any such abandoned small cell facility in the right-of-way has removed such small cell facility or payment for such removal has been made to the city.
(c) 
Other Considerations. Additional design requirements shall be applicable to the various types of WCFs in the right-of-way. New and existing poles in the public right-of-way may accommodate small cell facilities, but not other forms of WCFs.
(i) 
The color of stand-alone poles in the right-of-way constructed to accommodate small cell facilities shall be compatible with the colors of other poles in the right-of-way in the immediate vicinity. For example, if the new pole is near traffic signals at an intersection, the color of the new pole should match the color of the traffic signals. If the new pole is near street light poles, the color of the vertical structure should be the same, or similar to, the color of existing street light poles in the area.
(ii) 
Poles and small cell facilities in the right-of-way should use existing land forms, vegetation, and structures to aid in screening the facility from view or blending in with the surrounding built and natural environment.
(iii) 
Poles shall be architecturally compatible with the surrounding area.
(A) 
Height and size of the poles should be minimized as much as possible, and in no event shall any pole in the right-of-way be higher than 30 feet.
(B) 
Poles and small cell facilities in the right-of-way shall be compatible with the surrounding topography, tree coverage, and foliage.
(C) 
Poles and small cell facilities in the right-of-way shall include design characteristics that have the effect of reducing or eliminating visual obtrusiveness.
(D) 
Pole-mounted small cell wireless facilities shall, to the extent feasible, be located on, or within, an existing utility pole serving the city or another utility and shall be concealed/camouflaged consistent with other existing natural or manmade features near the location where the facilities will be located.
(E) 
With respect to a pole-mounted small cell wireless facility, they shall be located on, or within, a new pole where other utility distribution lines are aerial. If there are no reasonable alternatives, and the applicant is authorized to construct the new stand-alone poles, to the extent reasonably feasible, such poles shall:
1. 
Be consistent with the size and shape of the pole-mounted equipment installed by communications companies on utility poles near the new stand-alone pole;
2. 
Be sized to minimize the negative aesthetic impacts to the right-of-way and adjacent property;
3. 
Be designed such that any ground-mounted equipment shall be located in a manner necessary to address both public safety and aesthetic concerns at the reasonable discretion of the director, and may, where appropriate and reasonably feasible based upon technical, construction and engineering requirements, require a flush-to-grade underground equipment vault;
4. 
Not alter vehicular circulation or parking within the right-of-way or impede vehicular, bicycle, or pedestrian access or visibility along the right-of-way. No stand-alone pole may be located or maintained in a manner that causes unreasonable interference. Unreasonable interference means any use of the right-of-way that disrupts or interferes with its use by the city, the general public, or other person authorized to use or be present upon the right-of-way, when an alternative exists that would result in less disruption or interference. Unreasonable interference includes any use of the right-of-way that disrupts vehicular or pedestrian traffic, any interference with public utilities, and any other activity that will present a hazard to public health, safety, or welfare;
5. 
Unless qualified as an eligible facilities request, not be more than 10 feet higher (as measured from the ground to the top of the pole) than any existing utility or traffic signal within 500 feet of the pole; and shall in no case be higher than 30 feet, unless such pole is already existing at a greater height;
6. 
With respect to any transmission equipment placed on an existing pole or new stand-alone pole, shall not extend more than five feet above such pole, unless qualified as an eligible facilities request;
7. 
Not be located within 600 feet of another stand-alone small cell facility pole in the right-of-way. The director may exempt an applicant from these requirements if the applicant demonstrates that the minimum separation requirement cannot be satisfied for technical reasons, and if the director determines that placement of a pole at a distance less than 600 feet from another pole will meet the intent of reducing visibility of WCFs to the extent possible; and
8. 
With respect to equipment enclosures, be located out of view as much as possible.
(d) 
Transmission equipment for small cell facilities shall meet the following requirements:
(i) 
All transmission equipment shall be grouped as closely as technically possible;
(ii) 
Transmission equipment shall be located out of sight whenever possible by locating within equipment cabinets or other enclosures that have been approved by the city. Where such alternate locations are not available, the transmission equipment shall be concealed, and where concealment is not feasible, be camouflaged; and
(iii) 
Transmission equipment shall be of a neutral, nonreflective color that is identical to, or closely compatible with, the color of the supporting structure or uses other concealment/camouflage design techniques so as to make the equipment as visually unobtrusive as possible, including, for example, painting the equipment to match the structure.
(Ord. 22-1119 § 1)

§ 25.125.060 General duty.

None of the provisions of this chapter are intended to create a cause of action or provide the basis for a claim against the city, its officials, or employees for the performance or failure to perform a duty or obligation running to a specific individual or specific individuals.
(Ord. 22-1119 § 1)

§ 25.125.070 Severability.

The provisions of this chapter are declared to be severable. If any section, subsection, sentence, clause or phrase of this chapter or its application to any person or circumstance is for any reason held to be invalid or unconstitutional, the remainder of the chapter shall not, as a result, be held unconstitutional or invalid, but shall remain in full force and effect.
(Ord. 22-1119 § 1)

§ 25.126.010 Purpose.

(1) 
To provide opportunities for DuPont residents to have safe and efficient personal electric charging stations located at their place of residence;
(2) 
To provide opportunities for adequate and convenient electric vehicle charging stations to serve the needs of the traveling public;
(3) 
To provide the opportunity for commercial and industrial projects to supply electrical vehicle charging station services to their customers and employees;
(4) 
To create standard criteria and performance standards to encourage and promote safe, efficient and cost effective electric vehicle charging opportunities in a full range of zoning districts and settings for convenience of service to those that use electric vehicles.
(Ord. 11-919 § 15; Ord. 26-1168, 4/14/2026)

§ 25.126.020 General provisions.

(1) 
Use of Specially Designated Charging Stalls. Electric vehicle charging stations should be reserved for parking and charging electric vehicles only.
(2) 
Electric Vehicles Parking. Electric vehicles may be parked in any space designated for public parking, subject to the restrictions that would apply to any other non-electric vehicle that would otherwise park in that space.
(Ord. 11-919 § 15; Ord. 26-1168, 4/14/2026)

§ 25.126.030 Where permitted.

(1) 
Allowed Where. "Electric vehicle charging stations," identified by specific charging levels, are allowed within specific districts as established within this code; provided that all other requirements for the building or space the use occupies, such as fire code and building code requirements, are met.
(2) 
Compatibility. For land use compatibility purposes, the charging activity should be proportionate to the associated permitted use; "electric vehicle charging station(s)" permitted in residential districts shall be designed to serve the occupants of the residential units with level 1 or 2 charging levels. Whereas, "level 3 or rapid charging station(s)" are expected to have a more intensive use and will require additional siting requirements.
(3) 
Battery Exchange Stations. "Battery exchange stations" are allowed within specific districts as established within this code; provided, that all other requirements for the building or space the use occupies, such as fire code and building code requirements, are met. "Battery exchange stations" are specifically prohibited in residential zones or zones designated for critical area protection.
(Ord. 11-919 § 15; Ord. 26-1168, 4/14/2026)

§ 25.126.040 Process for review.

(1) 
New Residential Construction. If associated with new residential construction, installation of a charging station shall be processed when possible in association with the underlying permitting process. In some cases, additional building and/or electrical permits may be required in order to conform to the appropriate standards of the International Building Code (IBC) and National Electrical Code (NEC).
(2) 
New Industrial, Commercial, or Multifamily Construction. If associated with new industrial, commercial, or multifamily construction, installation of electric vehicle infrastructure shall be processed when possible in association with the underlying permitting process.
(3) 
Retrofitting Single-Family Residential. When retrofitting a single-family home for an electric vehicle charging station, an electrical permit shall be required from the State Department of Labor and Industries.
(4) 
Retrofitting Industrial, Commercial, Multifamily, or Master Planned Development Sites. If retrofitting an existing industrial, commercial, multifamily or master planned site for electric vehicle infrastructure, a Type II site plan approval is required in addition to other required permits such as building electrical, design review, parking, signage, and/or landscaping.
(Ord. 11-919 § 15; Ord. 26-1168, 4/14/2026)

§ 25.126.050 Design criteria and guidelines.

(1) 
Design Criteria for Industrial, Commercial and Multifamily Development or Community-Owned Areas of a Residential Development. The following criteria shall be applied to electric charging facilities:
(a) 
Number Required. New development is required to build charging station-equipped or outfitted parking spots pursuant to RCW 19.27.540 which mandates the designation of greater than one space, or 10% of total spaces, with wiring able to accommodate electric vehicle charging. An additional 20% of spaces must be "charger station-ready."
(b) 
Generally. Location and layout of electric vehicle parking is expected to vary based on the design and use of the primary parking lot. It is expected that flexibility may be necessary to provide the most convenient and functional service to users. Standards and criteria should be considered guidelines and flexibility should be considered when alternatives can better achieve objectives for provision of this service.
(c) 
Identification Signage. Each charging station space should be posted with signage indicating the space is only for electric vehicle charging purposes. Days and hours of operation should be included if time limits or tow away provisions are to be enforced by the owner. On-site charging station identification signage is exempt from the provisions of Chapter 25.116 DMC, Sign Code, as necessary, and directional signs.
(d) 
Wayfinding Signage. Installation of wayfinding signs at the parking lot entrance(s) and at appropriate decision points along the public rights-of-way to effectively guide motorists to the charging station space(s) are encouraged.
(e) 
Maintenance. Charging station equipment should be maintained in all respects, including the functioning of the charging equipment.
(f) 
Accessibility. Where charging station equipment is provided adjacent to a pedestrian circulation area, such as a sidewalk or accessible route to the building entrance, charging equipment shall be located so as to not interfere with accessibility requirements of WAC 51-50-005.
(g) 
Lighting. Where charging station equipment is installed, adequate site lighting shall also be provided unless charging is for daytime purposes only.
(h) 
Notification of Station Specifics. Information on the charging station must identify voltage and amperage levels and time of use, fees and safety information.
(i) 
Location of Parking Spaces. Charging stalls should be located in convenient spots within a parking lot to encourage use of electric vehicles and consistent with the requirements of the DuPont Municipal Code.
(j) 
Relationship to Accessible Car and Van Spaces. Charging stalls may be located adjacent to accessible car and van spaces and may include stall(s) designed for accessible car and van use.
(k) 
Appropriate Design. Charging facility design should be appropriate to the anticipated location and use. Facilities should be able to be readily identified by electric vehicle users but blend with the surrounding landscape and architecture of the site.
(l) 
Size. Where provided, vehicle charging stalls shall be standard size parking stalls as defined by Chapter 25.95 DMC.
(Ord. 11-919 § 15; Ord. 26-1168, 4/14/2026)

§ 25.127.010 Marijuana-related uses prohibited.

The city of DuPont hereby prohibits the establishment, location, operation, licensing, maintenance or continuation of medical marijuana collective gardens and other establishments involved in the retailing, producing or processing of recreational marijuana within the city of DuPont.
(Ord. 14-968 § 1)

§ 25.127.020 Severability.

Should any section, paragraph, sentence, clause or phrase of this chapter, or its application to any person or circumstance, be declared unconstitutional or otherwise invalid for any reason, or should any portion of this chapter be preempted by state or federal law or regulation, such decision or preemption shall not affect the validity of the remaining portions of this chapter or its application to other persons or circumstances.
(Ord. 14-968 § 2)

§ 25.127.030 Moratorium terminated.

The 12-month moratorium established pursuant to Ordinance 13-957 shall terminate upon the effective date of the ordinance codified in this chapter.
(Ord. 14-968 § 3)

§ 25.127.040 No nonconforming uses.

No use that constitutes or purports to be a medical marijuana collective garden, marijuana producer, marijuana processor, or marijuana retailer that was engaged in that activity prior to the enactment of the ordinance codified in this chapter shall be deemed to have been a legally established use under the provisions of the DuPont Municipal Code and that use shall not be entitled to claim legal nonconforming status.
(Ord. 14-968 § 4)
§ 25.116.010 Title.
This chapter is known as and may be cited as the “DuPont sign code.”
(Ord. 13-949 § 2)
§ 25.116.020 Scope and purpose.
It is the purpose of this chapter to make DuPont a place to work, live and play by: encouraging a strong, stable, and vibrant business district; attracting new businesses and supporting existing businesses; maximizing efficiencies in the permitting process; safeguarding the public health, safety and welfare by providing minimum standards for the size, number, location, and maintenance of all signs and sign structures and preventing excessive and confusing signs that adversely affect business vitality and pedestrian and vehicular traffic safety; preserving the right of free speech exercised through the use of signs containing noncommercial messages; and protecting the city's economic base and the ability of businesses, civic, philanthropic, educational, and religious organizations to properly advertise.
(Ord. 13-949 § 2)
§ 25.116.030 Applicability.
In order to be placed within the city of DuPont, a sign must be expressly allowed or expressly exempt from regulation by the DuPont sign code. All signs that are not expressly permitted by or expressly exempt from regulation under this sign code, or other applicable provisions of the DuPont Municipal Code, in addition to those signs listed as expressly prohibited in this sign code, are prohibited in the city. All signs that are permitted pursuant to the sign code, or other applicable provisions of the DuPont Municipal Code, shall be erected, placed, established, painted, created, or maintained in the city only in conformance with this sign code.
(Ord. 13-949 § 2)
§ 25.116.040 Signs in public rights-of-way.
No sign shall be located in, project over, or encroach any public right-of-way unless the placement of such sign in the public right-of-way is specifically authorized by law. Any sign located in a public right-of-way that is not specifically authorized by law may be removed by the city without notice.
(Ord. 13-949 § 2)
§ 25.116.050 Signs interfering with sight distance.
(1) 
No sign shall be designed, constructed, or located such that it interferes with the sight distance of pedestrians or motorists proceeding on or approaching on public streets, intersections, alleys, driveways, parking areas, sidewalks or pedestrian ways; and
(2) 
All signs erected shall comply with the sight distance requirements as set forth in DMC § 25.110.010.
(Ord. 13-949 § 2)
§ 25.116.060 Computation of sign area.
(1) 
For the purpose of measurement, the area of a sign whose individual letters or graphic components are painted on, attached to, or inscribed into a building surface shall be that of the smallest circle, triangle, or rectangle that will encompass the letters, graphics, or borders, if any; and
(2) 
The area of a projecting, suspended, or freestanding sign shall be that of the entire surface of each face, excluding supports not constituting part of the sign face itself, except that the area of signs repeated on opposite sides of a face shall only be counted once.
(Ord. 13-949 § 2)
§ 25.116.070 International Building and Electrical Codes.
All signs shall be designed, constructed and maintained in accordance with the applicable provisions of the State Building Code, as such are adopted and/or hereafter amended by the city of DuPont in DMC § 12.03.020 or otherwise.
(Ord. 13949 § 2)
§ 25.116.080 Content neutrality as to the sign message.
No sign or sign structure shall be exempt from or subject to any limitation based upon disapproval or approval of the viewpoint of the message(s) contained on such sign or displayed on such sign structure.
(Ord. 13-949 § 2)
§ 25.116.090 Highway Advertising Control Act.
Any sign that can be viewed from Interstate 5 shall comply with the Highway Advertising Control Act, as administered by Washington State Department of Transportation.
(Ord. 13-949 § 2)
§ 25.116.100 Prohibited signs.
The following signs are prohibited within the city of DuPont, except as specifically and expressly authorized elsewhere by this sign code:
(1) 
Any sign with content or subject matter that constitutes obscenity as defined by law;
(2) 
Any sign affixed to a utility pole, whether located on private property or within the public right-of-way, except as expressly permitted by the utility pole owner pursuant to RCW 70.54.090;
(3) 
Any sign determined by the city to constitute a traffic hazard or detriment to traffic safety by reason of its size, location, movement, content, coloring or method of illumination, or by obstructing the vision of drivers, or by obstructing or detracting from the visibility of any official traffic control device by diverting or tending to divert the attention of pedestrians or drivers from traffic movement on streets, roads, intersections, or access facilities; no sign shall be erected so that it obstructs the vision of pedestrians; flashing or revolving red, green, blue or amber lights shall be prohibited on any sign; any sign which by glare or method of illumination constitutes a hazard to traffic is prohibited; no sign may use the words “Stop,” “Look,” “Danger,” or any other word, phrase, symbol or character in such a manner as to interfere with, mislead or confuse pedestrians or drivers;
(4) 
Any sign or portion of a sign placed so that it: obstructs any fire escape, stairway, or standpipe; interferes with exits through any window; obstructs any door or required exit from any building; or obstructs any required light or ventilation;
(5) 
Roof signs;
(6) 
Signs identifying or advertising home occupations;
(7) 
Billboards;
(8) 
Inflated signs;
(9) 
Illuminated signs that produce off-site glare onto residences;
(10) 
Benches on public sidewalks containing advertising matter; provided, however, signs advertising a public transit authority may be placed on benches at bus stops;
(11) 
Signs which are pasted or attached to trees, fences, other signs, rocks or natural features;
(12) 
Flashing signs;
(13) 
Signs encroaching upon or overhanging public right-of-way, except as allowed by this sign code. No sign shall be attached to any utility pole, light standard, street tree or any other public facility located within the public right-of-way, except as allowed by RCW 70.54.090 or other law;
(14) 
Any sign or device, including beacons, searchlights, spotlights and holograms, which contains or is illuminated by flashing, chasing, or intermittent effects, and/or signs that have any movement or are animated;
(15) 
Any sign that revolves or gives the impression of movement through the manipulation of lights, except a time and temperature unit or changeable message center, which is part of a sign;
(16) 
Signs attached to, or placed on, a vehicle or trailer parked on private or public property, except for signs meeting the following conditions:
(a) 
The primary purpose of such vehicle or trailer is not the display of signs, and
(b) 
The vehicle or trailer is in operating condition, currently registered and licensed to operate on public streets when applicable, and actively used or available for use in the daily function of the business to which such signs relate.
(Ord. 13-949 § 2)
§ 25.116.110 Permit-exempt signs and displays.
The following signs and actions shall not require a DuPont sign permit approval provided the sign complies with the requirement(s) listed for the respective sign, except official public signs per subsection (1) of this section may include sign types and configurations that would otherwise be prohibited or not allowed under this chapter at the discretion of the director:
(1) 
Official public signs, including but not limited to: directional, warning, identification, facility, recreation, event or information signs, or signs authorized or required by federal, state, or municipal governments, including traffic or pedestrian control/direction signs;
(2) 
Official notices authorized by a court, public body, or public safety official;
(3) 
Religious symbols and seasonal decorations within the appropriate holiday season;
(4) 
Use of signs during picketing and lawful assembly;
(5) 
Changing of the advertising copy of a sign that has a valid permit. Any structural changes to the sign shall require a permit;
(6) 
Signs on private property relating to trespassing, no hunting, household pets, etc., not exceeding two square feet in area;
(7) 
Signs not visible or intended to be viewed from a public or pedestrian right-of-way;
(8) 
Window merchandise displays;
(9) 
Window signs;
(10) 
Banners, streamers, pendants, balloons, strings of lights and/or decorations attached to merchandise or temporarily displayed as part of a special sale, promotion or community event;
(11) 
Point of purchase advertising displays located on private property, such as product dispensers and candy machines;
(12) 
National flags, flags of political subdivisions, or symbolic flags of a noncommercial institution;
(13) 
Plaques, tablets or inscriptions indicating the name of a building, its date of erection, or other commemorative information, which are an integral part of the building’s structure or are attached flat to the face of the building, which are nonilluminated, and which do not exceed three square feet in area;
(14) 
Sculptures, fountains, mosaics, murals and design features which do not incorporate advertising or identifications;
(15) 
Signs of a public utility providing information, directions or warnings to the general public regarding its poles, lines, pipes or similar facilities;
(16) 
Signs that are part of an accessory to public bus and transit shelters that provide information to the general public regarding public transit schedules and routes, and that also may include public service announcements and product or service advertisements;
(17) 
Structures intended for a separate use, such as public phone booths, public donation and recycling containers; or sign graphics attached directly to a licensed motor vehicle, licensed boat, licensed trailer, or licensed container operating in the normal course of business;
(18) 
Barber poles not exceeding four feet in length;
(19) 
Signs stating business hours erected on private property. These signs shall not contain advertising or promotional information and shall not exceed a sign area of four square feet;
(20) 
Signs not legible from a distance of more than eight feet from a property line abutting a public right-of-way;
(21) 
One nameplate/street address identification per street frontage;
(22) 
Signs regulating the use of publicly owned parks and recreation facilities when authorized by the city;
(23) 
Incidental signs not exceeding two square feet in area. Said signs may bear the name, address and phone number of a towing company responsible for impounding violators;
(24) 
Temporary Political Sign.
(a) 
Temporary political signs, including the campaign of a person for public office and campaign for an initiative, referendum or other public ballot, may be displayed on private property or public right-of-way; and
(b) 
Temporary political signs shall not be placed on private property without permission of the property owner; and
(c) 
Temporary political signs may be placed in a public right-of-way provided:
(i) 
The sign is no taller than 36 inches when displayed and no larger than six square feet in area per sign; and
(ii) 
The sign shall be located in the public right-of-way between the front property line and the curb; and
(iii) 
Temporary political signs are prohibited in a public drive aisle, public parking aisle, public intersection, public median, or a sight triangle as determined by DMC § 25.110.010; and
(iv) 
Temporary political signs shall not be attached to a utility pole, traffic sign, or street sign, unless specifically authorized by the owner of the utility pole or traffic/street sign; and
(v) 
Temporary political signs shall not present a safety hazard to pedestrian or vehicular traffic, as determined by the city, or violate city code; and
(d) 
If related to an election, the temporary political sign shall be removed within five working days following an election, except that the signs of a candidate who is successful in a primary election may remain until five days after the final election; and
(e) 
The person posting the sign shall be responsible for removing it; and
(f) 
Temporary political signs shall not be illuminated; and
(g) 
The city of DuPont may, without notice, remove any temporary political sign that is located in a public right-of-way and that violates this sign code; and
(h) 
There is no maximum number of temporary political signs;
(25) 
Service organizations that hold regular meetings in the city of DuPont may install one identification sign in city public rights-of-way at: Interstate 5 – Exit 118; Interstate 5 – Exit 119; Center Drive at DuPont Steilacoom Road; and DuPont Steilacoom Road at Station Drive. Said sign shall not exceed two square feet in size and shall be subject to all regulations regarding signs in public rights-of-way.
(Ord. 13-949 § 2; Ord. 24-1143 § 1)
§ 25.116.120 Permanent signs.
The following signs require a DuPont sign permit approval prior to installation and shall comply with the requirement(s) listed for the respective sign:
(1) 
Freestanding Sign. Freestanding signs are allowed only in the nonresidential zones and for conditional uses in the residential zones; shall be limited to a maximum height of six feet above grade; shall be set back a minimum of eight feet from the property line; shall be located outside any sight triangle as defined by DMC § 25.110.010; shall be limited within the business and technology park, manufacturing and research park, and industrial land use districts to a maximum sign area of 60 square feet; shall be limited within other land use districts to a maximum sign area of 25 square feet if for a single business and a maximum of 40 square feet if for a multi-tenant business, and shall be externally illuminated. The sign shall be ground-related and permanent in appearance. Illuminated signs are prohibited in the residential zones unless permitted through the conditional use permit process or required by the city for public safety purposes.
(2) 
Building Mounted Sign in Historic Village Planning Area. Building mounted signs shall be located on the building entablature; shall not exceed 40 percent of the available entablature per each building elevation; and may be internally illuminated, externally illuminated or nonilluminated. Individual letters shall not exceed 12 inches in height. Building mounted signs facing Interstate 5 shall be no taller than 24 inches in height.
(3) 
Building Mounted Sign in DuPont Station and McNeil Station Planning Areas, and the Office Planning Areas. All building mounted signs shall be located on the building entablature; individual letters shall not exceed 14 inches in height; primary frontage sign area shall not exceed the lineal feet of business frontage times 0.6 square feet, provided every business shall be allowed a minimum of 15 square feet of sign area and a maximum of 120 square feet of sign area; secondary frontage sign area shall not exceed the lineal feet of business frontage times 0.4 square feet, provided every business shall be allowed a minimum of 15 square feet of sign area, a maximum of 80 square feet of sign area and may be internally illuminated, externally illuminated or nonilluminated. Building mounted signs facing Interstate 5 shall be no taller than 24 inches in height. Building mounted sign shall not exceed the height of the building face to which it is mounted, and no sign shall be placed on a building’s roof.
(4) 
Blade Signs in Barksdale Station, DuPont Station and McNeil Station Planning Areas. Blade signs project or are suspended rigid signs mounted perpendicular to the building facade intended for pedestrian use. Blade signs shall: be installed on the facade containing the business’s primary storefront entrance; shall be a minimum of two square feet and maximum of four square feet in area; shall provide eight feet vertical clearance between the bottom of the sign and the sidewalk; and shall contain only the logo, graphic and/or business name. Blade signs shall not be included in wall sign calculations. The owner of a blade sign as described in this section that projects into or is located in a public right-of-way shall provide the city a release of liability in a form reasonably acceptable to the city attorney prior to receiving approval of a sign permit application for such a sign.
(5) 
Projecting, suspended, marquee, and canopy signs shall maintain at least eight feet of vertical clearance from any sidewalk and shall not project over a driving or parking lane, except that the city reserves to itself the right to erect signs that project or suspend over any public right-of-way. The owner of a projecting suspended or marquee sign as described in this section that projects into or is located in a public right-of-way shall provide the city a release of liability in a form reasonably acceptable to the city attorney prior to receiving approval of a sign permit application for such a sign.
(6) 
Building Mounted Signs in Manufacturing and Research Park Zone, Business and Technology Zone and Industrial Zone Planning Areas. For building mounted signs, the primary frontage sign area shall not exceed the lineal feet of business frontage times 0.6 square feet, up to a maximum of the lesser of: (a) 350 square feet, or (b) the lineal distance between the sign and the boundary of the closest residential district times one square foot. Any secondary facade sign area shall not exceed the lineal feet of the width of that facade times 0.4 square feet, up to a maximum of 100 square feet. Signs shall be located on the building entablature, and may be internally illuminated, externally illuminated or nonilluminated. No sign shall be placed on a building’s roof.
(7) 
Village Monuments. An externally illuminated freestanding sign may be located at the primary vehicular entrance to a village. The term “village” shall be as defined by the DuPont comprehensive plan. The term “primary vehicular entrance” shall be as interpreted as the primary entrance point to the village as determined by traffic counts. There may be one sign per primary vehicular entrance. The sign shall be single sided, and shall not exceed 16 square feet in area and four and one-half feet in height. The monument base shall not be included in calculation of sign area. The sign and/or monument base shall be set back at least three feet from any curb and two feet from any sidewalk and outside any vision clearance triangle. Signs located within a public right-of-way shall be approved by the public works director.
(Ord. 13-949 § 2; Ord. 13956 § 1)
§ 25.116.130 Temporary signs.
The following signs require a DuPont sign permit approval prior to installation and shall comply with the requirement(s) for the respective sign as listed below:
(1) 
Temporary signs shall not be placed on private property without permission of the property owner; and
(2) 
Temporary signs shall not be illuminated; and
(3) 
The person posting a temporary sign shall be responsible for removing it; and
(4) 
Temporary signs may be located in a public right-of-way provided:
(a) 
Temporary signs shall be no taller than 36 inches when displayed and no larger than six square feet in area per sign; and
(b) 
Temporary signs may be located only between a front property line abutting a public right-of-way (street) and the curb line; and
(c) 
Temporary signs shall not be located in a drive aisle, parking aisle, driveway, intersection, median, or a sight triangle as determined by DMC § 25.110.010; and
(d) 
Temporary signs shall not be attached to a utility pole, traffic sign, or street sign, unless specifically authorized by the owner of the utility pole or traffic/street sign; and
(e) 
Temporary sign shall not present a safety hazard to pedestrian or vehicular traffic as determined by the city, or violate city code; and
(f) 
Temporary A-board signs shall be located only in the landscape strip, where a landscape strip exists, or in line with the street trees or against the building when in the DuPont Station planning area; and
(g) 
The owner of the sign submits a fully executed hold harmless agreement for said sign; and
(5) 
Specific Temporary Sign Requirements.
(a) 
Temporary A-frame Sign.
(i) 
One temporary A-frame sign per business may be displayed on the property of the business or in the abutting public right-of-way only when the business is open to the public, and shall comply with the requirements for temporary signs in the right-of-way per subsection (4) of this section; and
(ii) 
Temporary A-frame sign permit approval period is one calendar year.
(b) 
Temporary Real Estate Sign.
(i) 
One temporary real estate sign per property for sale or lease may be displayed on the property for sale or lease; and
(ii) 
Three temporary off-site real estate signs may be displayed in the public right-of-way to direct the public to the advertised property and shall comply with the requirements for temporary signs in the right-of-way per subsection (4) of this section; and
(iii) 
All off-site real estate signs shall be displayed only during the hours that a real estate or rental agent is present at the property and shall be promptly removed at the end of each business day; and
(iv) 
Temporary real estate sign permit approval period is one calendar year.
(c) 
Temporary Garage Sale Sign.
(i) 
One on-site temporary garage sale sign may be displayed on the advertised property; and
(ii) 
Three off-site garage sale signs may be displayed in a public right-of-way to direct the public to the advertised property and shall comply with the requirements for temporary signs in the right-of-way per subsection (4) of this section; and
(iii) 
Signs may be displayed 24 hours prior to the sale and shall be promptly removed at the end of the sale.
(d) 
Temporary Business Banner.
(i) 
One temporary business banner per business advertising event such as but not limited to a grand opening, new management, or new ownership may be installed on the building wall of the business; and
(ii) 
The temporary business banner shall be limited to a maximum of 30 consecutive days per event; and
(iii) 
Maximum banner size is limited to 24 square feet.
(e) 
Temporary Construction, Contractor Sign.
(i) 
One on-site temporary construction or contractor sign may be posted on an active construction site; and
(ii) 
The sign shall be removed following completion of the project; and
(iii) 
No temporary construction or contractor sign is allowed in a public right-of-way; and
(iv) 
Maximum sign size is limited to 32 square feet.
(f) 
Temporary Community-Wide Event Sign.
(i) 
Signs and banners for community-wide event may be located in public rights-of-way subject to obtaining a DuPont special event permit approval; and
(ii) 
Banners may be suspended over public rights-of-way at specific locations if safe pedestrian and vehicle circulation is provided; and
(iii) 
Signs and banners may be attached to the wall of a building if the property owner provides approval; and
(iv) 
There is no maximum number of signs and banners, and there is no maximum sign size, for community-wide events; and
(v) 
Temporary signs may be installed two weeks prior to the community event and shall be removed no later than one week after the event.
(g) 
Temporary Future Development Sign.
(i) 
One temporary future development sign per vacant property may be displayed on the property;
(ii) 
Temporary future development sign permit approval period is from issuance to when development of the property occurs.
(h) 
Temporary Charitable or Religious Organization Event Signs.
(i) 
One temporary sign advertising an event held by a charitable, nonprofit and/or religious organization may be displayed on the property that is the site of the event; and
(ii) 
Three off-site signs advertising an event held by a charitable, nonprofit and/or religious organization may be displayed in a public right-of-way to direct the public to the property that is the site of the event; provided, that the signs shall comply with the requirements for temporary signs in the right-of-way per subsection (4) of this section; and
(iii) 
Signs permitted under subsection (5)(h)(i) and (ii) of this section may be displayed 24 hours prior to the event and shall be promptly removed at the end of the event; and
(iv) 
Temporary charitable or religious organization event sign approval period is one calendar year.
(Ord. 13-949 § 2)
§ 25.116.140 Approval required.
(1) 
Except as provided in DMC § 25.116.110, it is unlawful for any person to erect, construct, enlarge, or move any sign in the city, or cause the same to be done, except where only the actual sign face or wording is changed, to include the change in business occupancy, repainted, cleaned, repaired or maintained without structural or size alterations, without first obtaining a sign permit application approval for each such sign from the administrator as required by this chapter.
(2) 
State electrical permits shall be obtained for all electric signs. Electrical permits are obtained from the Washington State Department of Labor and Industries.
(3) 
No approval for any sign shall be issued unless the sign complies with all requirements of this chapter and applicable regulations of the building code as adopted in DMC Title 12.
(Ord. 13-949 § 2)
§ 25.116.150 Administration and enforcement.
The administrator or his/her designee shall be responsible for administration of this chapter and is authorized to formulate procedures consistent with its intent and purpose.
(1) 
Removal of Signs. The city may require the removal of, or remove, any sign that is in violation of this chapter. Any sign located in the public right-of-way in violation of this chapter shall be subject to immediate removal without notice. Illegal signs in the public right-of-way shall not be stored and are subject to disposal by the city. Owner of illegal signs on private property shall receive either an oral or written notice, at the discretion of the city.
(2) 
First violation of this code will receive a verbal warning and no fine. Second violation will receive a letter from the city and a $100.00 fine. Third violation will receive a letter from the city and a $500.00 fine. Fourth violation will receive a letter from the city and a $1,000 fine.
(3) 
Civil Penalties. In addition to any other remedy available to the city, person violating or failing to comply with any provisions of this chapter shall be subject to the procedures for violation, hearing, and penalties as set forth in Chapter 25.185 DMC.
(Ord. 13-949 § 2)
§ 25.116.160 Sign permit application.
A valid sign permit application approval shall be obtained from the city prior to start of work on the sign.
(1) 
Permanent sign applications shall be processed with a Type I procedure per DMC § 25.175.010(4) with a filing fee per DuPont fee schedule for city services.
(2) 
Temporary sign applications shall be processed with a Type I procedure per DMC § 25.175.010(4) with a filing fee per DuPont fee schedule for city services.
(3) 
Applicants shall submit completed applications, together with a fee as established by resolution, to the city. Each sign application may include multiple signs, but shall be for only one business.
(4) 
Permit Application. The city shall establish, and may modify as necessary, the “DuPont Permanent Sign Permit Application” form and the “DuPont Temporary Sign Permit Application” and may establish a list of submittal requirements for each as necessary.
(5) 
The administrator shall determine whether the application is consistent with this chapter and approve, approve with conditions, or deny the application.
(6) 
Valid sign permits shall run with the business and are freely assignable. Sign permits shall lapse:
(a) 
Ninety days after written approval is granted unless acted upon by the applicant; or
(b) 
At such time as the activity to which the sign refers ceases for 45 days or more; or
(c) 
In the case of businesses, at such time as the respective business license lapses.
(7) 
Administrative Adjustments. The administrator shall have the authority to grant or deny requests for adjustments to the provisions of this chapter whenever such provisions are unduly prohibitive to reasonable use of property as intended by this chapter. Said administrative adjustment shall be limited to the following adjustments:
(a) 
The administrator may grant an adjustment of no greater than 10 percent (rounded to the nearest foot or square foot); provided, that no increase in the number of signs shall be allowed;
(b) 
An adjustment shall not be materially detrimental to other properties or land uses in the surrounding area;
(c) 
The adjustment shall be consistent with the general purpose and intent of this chapter, the DuPont strategic plan and the DuPont comprehensive plan.
(Ord. 13-949 § 2)
§ 25.116.170 Time limitation.
Sign application approvals issued by the administrator expire by limitation and become null and void if the structure or work authorized by such approval is not commenced within 90 days from the date of the approval, or if the structure or work authorized by such approval is suspended or abandoned at any time after the work is commenced for a period of 90 days.
(Ord. 13-949 § 2)
§ 25.116.180 Extension of time limit.
The administrator may extend a sign application approval for a single period of up to 90 days from the date of expiration of the initial approval, if request for extension is made 30 days prior to the expiration date of the initial approval date.
(Ord. 13-949 § 2)
§ 25.116.190 Nonconforming signs.
(1) 
The provisions of this chapter do not apply to signs legally in existence on the effective date of the ordinance codified in this chapter; provided, that:
(a) 
The alteration, enlargement, installation or erection of signage shall not increase the degree of nonconformity;
(b) 
Enlargement or installation of any conforming signage shall be accompanied by a reduction in the degree of nonconformity for other signage existing on the premises. This reduction in nonconformity can be accomplished by a reduction in size of existing signs (if nonconforming as to square footage), removal (if nonconforming as to number of signs), relocation (if nonconforming as to location), or a combination of reduction, removal and relocation. The total cost of reduction, removal or relocation of nonconforming signage shall equal, as nearly as is practical, 75 percent of the value of the new or enlarged conforming signage, or the cost necessary to bring all signage on the premises into conformance with this chapter, whichever is the lesser requirement.
(2) 
Nonconforming Off-Premises Signs.
(a) 
Any person, firm, or corporation who maintains legal, nonconforming off-premises signs within the city of DuPont shall be authorized to maintain only that number of nonconforming off-premises signs that they maintained upon the date of adoption of the ordinance codified in this chapter. Said legal nonconforming signs may be repaired and/or replaced to their original condition, location, size, height and number of faces. If replaced, said legal nonconforming off-premises sign shall be replaced within 60 days of its removal.
(b) 
All legal nonconforming off-premises signs shall be properly maintained.
(3) 
Nonconforming provisions of this section do not apply to temporary signs or to illegal signs.
(Ord. 13-949 § 2)
§ 25.116.200 Definitions.
For the purposes of this chapter, certain words and phrases have the following meanings, unless the context otherwise indicates:
“Abandoned sign”
means any sign pertaining to a business or occupant whose products or services or noncommercial messages have ceased to be offered to the public or ceased to be in effect on said premises for a period of more than 90 days.
“A-frame sign”
means a portable sign consisting of two sign faces hinged at the top and separated at the bottom to make itself standing. Also referred to as a sandwich board sign, sidewalk sign or A-board sign.
“Animated sign”
means any sign that flashes or simulates motion with an electronic or manufactured source of supply or contains wind-actuated motion, but not including flags or banners, revolving signs or changing message centers.
“Banner sign”
means a sign made of cloth, fabric, paper, nonrigid plastic or similar types of material. National flags, flags of political subdivisions and symbolic flags of an institution or business (house flag) are not considered banner signs.
“Blade sign”
means a sign suspended over a sidewalk or pedestrian way by attachment to the underside of a canopy, marquee, awning, or similar structure, perpendicular to the wall.
“Building official”
means the city building official or designee.
“Building sign”
means a sign attached to any part of a building, as contrasted with a freestanding sign. Printing on a canopy or awning is considered as a building sign.
“Canopy sign”
means a sign that is a part of or attached to a freestanding, roof-like structure that provides protection from the elements in an outdoor service area.
“Changing message center”
means an electronically or electrically controlled public service time, temperature and date sign, message center or reader board where different copy changes of a public service or commercial nature are shown on the same lamp bank.
“Construction sign”
means a sign that identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.
“Curb line”
means the line at the face of the curb nearest to the street or roadway. In the absence of a curb, the curb line shall be established by the city public works director.
“Double-faced sign”
means a sign with two faces.
“Electric sign”
means a sign or sign structure in which electrical wiring, connections and/or fixtures are used as part of the sign proper.
“Electronic reader board sign”
means any sign or portion of a sign that includes arrays of light bulbs or LEDs whose intent is the permanent or intermediate flashing, animation, or display of text, date, time and/or images.
“Establishment”
means an economic unit, generally at a single physical location, where business is conducted or services or industrial operations are performed. This includes nonprofit and noncommercial operations.
“Facade”
means the entire building front, or street wall face, including grade to the top of the parapet or eaves, and the entire width of the building elevation.
“Flashing sign”
means a sign or portion thereof, which changes light intensity or switches on and off in a constant or random pattern and no more frequently than once every two seconds, or contains motion or the optical illusion of motion by use of electrical energy, including strobe lights in window displays. Changing message signs or time and temperature signs shall not be considered flashing signs; provided, they do not flash as defined herein.
Freestanding Sign.
See definition in DMC § 25.10.060.
Frontage, Street.
See definition in DMC § 25.10.190.
“Identification sign”
means a sign containing the name of the business establishment, occupant of the building, and/or address of the premises.
Incidental Sign.
See definition in DMC § 25.10.090.
“Informational sign”
means a sign intended to provide only noncommercial, site-specific environmental or interpretive information.
“Inspector”
includes any city employee working under the authority and direction of the administrator.
“International Codes”
is as defined and adopted in DMC § 12.03.020.
“Mansard roof”
means a sloped roof or roof-like facade architecturally able to be treated as a building wall.
“Marquee sign”
means any sign that forms part or is integrated into a marquee and does not extend horizontally beyond the limits of such marquee.
“Monument sign”
means a freestanding sign that is not supported by poles and the bottom surface of the sign is in contact with the ground.
“Nonpolitical campaign sign”
means a temporary sign for civic, religious, or other fund drives or events.
“Official public sign”
means a sign permanently erected or permitted by the city, Pierce County, or the state, including, but not limited to, signs denoting the name of any thoroughfare, the route to any city, town, village, educational institution, public building, public park, historic place, shrine or hospital, to direct and regulate traffic, or to denote any railroad crossing, bridge, ferry, or other transportation or transmission company for the direction or safety of the public.
“Off-premises sign”
means any sign which cannot be classified as an on-premises sign, including billboards.
“On-premises sign”
means a sign which displays only advertising copy strictly incidental to the lawful use of the premises on which it is located and, depending upon the district in which it is located, contains any or all of the following:
(1) 
The name of the owner, occupant, management or firm occupying the premises;
(2) 
The address of the use;
(3) 
The kind of name of the business and/or the brand name of the principal commodities sold or produced on the premises;
(4) 
Other information relative to a service or activity involved in the conduct of the business.
(Also includes “owner-identification” or “business sign.”)
“Parapet”
means a false front or wall extension located above the roofline.
“Permittee”
means the person making application for a permit.
“Pole sign”
means a freestanding sign that is supported by one or more poles.
“Political sign”
means a sign to advertise a candidate for political office, a pending levy or ballot initiative or similar election.
“Premises”
means the real estate, as a unit, which may be one or more lots, which is involved with the sign or signs identified in this chapter.
“Projecting sign”
means a sign which is attached to and projects from a structure or wall in such a manner that its leading edge extends more than 16 inches beyond the surface of such structure or wall. A marquee sign is not considered a projecting sign.
“Real estate sign”
means a sign to advertise the sale, rental, lease, sub-lease or auction of the premises.
“Roof sign”
means a sign erected upon or above a roof or parapet of a building or structure, except signs attached to an awning. Includes mansard roof sign.
“Shopping center”
means a retail shopping area designed as a unit, which utilizes a common parking area and contains separate, individual establishments.
“Sign”
means any visual communication device, structure, placard or fixture that uses any word, color, form, illumination, graphics, placard, board, notice, logo, insignia, symbol, flag, banner, inflatable device, or writing to advertise, announce the purpose of a person or entity, or to communicate information of any kind to the public. Works of art, fountains, mosaics and building or structural design features that do not contain a commercial message, logo, symbol, or identification are not signs.
“Sign area or surface area of sign”
means the total area of signage, visible from any viewpoint, excluding any sign support structure which does not form a part of the sign proper. “Surface area” includes only one face of a multiple-faced sign.
“Sign height”
means the vertical distance measured from the adjacent street grade or upper surface of the nearest street curb, other than an elevated roadway, which permits the greatest height to the highest point of the sign.
“Sign structure”
means any structure that supports or is capable of supporting any sign. Any structure that performs an entirely separate use, such as a telephone booth, bus shelter, donation or recycling container, etc., is not considered a sign structure.
“Street”
means a public or private thoroughfare or easement which affords primary means of access, including public rights-of-way.
“Suspended sign”
means a sign that is suspended from the underside of a horizontal plane surface and is supported by such surface.
“Temporary sign”
means any sign, banner, valance or advertising display constructed of cloth, canvas, light fabric, paper, cardboard or other light materials, with or without frames, intended to be displayed for a limited time only.
“Village monument sign”
means a permanent sign to identify a particular residential area identified by the DuPont comprehensive plan.
“Wall sign”
means a sign attached or erected parallel to and extending not more than 16 inches from the facade or face of any building wall to which it is attached and supported throughout its entire length, with the exposed face of the sign parallel to the plane of the wall or facade. For the purposes of this chapter, printing on the valance of an awning or canopy is also considered a wall sign. Appurtenances to buildings, including but not limited to chimneys, copulas, railings, and screening walls, are not considered part of a building wall.
“Window sign”
means a sign located inside and affixed to windows of a building, whether temporary or permanent, lighted or unlighted, which may be viewed from the exterior of the building and is intended to communicate information about an activity, business, commodity, event, sale, or service, and is legible from the exterior of the window. Window signs and display of merchandise for sale that are located inside a building shall not be included in sign area calculations.
(Ord. 13-949 § 2)
§ 25.116.210 Liability of city.
In all cases, the responsibility of complying with the requirements of this chapter, and other provisions of the DuPont Municipal Code, rests with the sign owner and/or any person owning, building, altering, constructing or moving any sign in the city. This chapter shall not be construed to relieve from or lessen the responsibility of any such person for damages to anyone injured or damaged either in person or property by any defect therein; nor shall the city, or any agent thereof, be held to have assumed such liability by reason of issuance of a sign permit or a certificate of inspection, or by performing an inspection authorized in this chapter. Any employee charged with the enforcement of this sign code, acting in good faith and without malice for the city in the discharge of duties, shall not thereby render himself liable personally and is hereby relieved from all personal liability for any damage that may accrue to persons or property as a result of any act required or by reason of any act or omission in the discharge of duties.
(Ord. 13-949 § 2)