66 FEE SCHEDULE
Comprehensive Plan Amendment | ||
Map or Text Amendment | $2,500 | |
Map and Text Amendment | $4,000 | |
Zoning Ordinance Amendment | ||
Map or Text Amendment | $2,500 | |
Map and Text Amendment | $4,000 | |
Annexation and Zoning Designation | $3,500 | |
Tentative Subdivision | $1,500 + $300 per lot | |
(4 or more lots. Does not include civil engineering review and inspections.) | ||
Final Subdivision: see Engineering Review Fees and Inspection Services Fees below. | ||
Partition | ||
Major (more than 3 lots) | Same as Tentative Subdivision | |
Minor (up to 3 lots) | $1,200 | |
Boundary Line Adjustment | $300 | |
Right-of-Way Vacation | ||
Minor | $1,000 | |
Major | $3,000 | |
Planned Development | Captured by CUP fee | |
Conditional Use Permit (CUP) | $1,500 | |
Site Plan Review | ||
Type A (Conventional) | ||
Residential (without TIS) | $1,500 | |
Residential (with TIS) | $2,000 | |
Commercial (with TIS) | $3,000 | |
Permanent Mobile Food Vendor | $1,500 | |
Type B (Administrative) | $600 | |
Variance | $1,500 | |
Appeal | $750 | |
Ordinance Interpretation | $300 | |
Preapplication Review | $200 | |
Additional Services | hourly rates | |
Estimated Construction Cost (Up to) | Inspection Services Fee |
|---|---|
$100,000 | 4% |
$200,000 | 3.6% |
$300,000 | 3.3% |
$400,000 | 3.1% |
$500,000 | 2.9% |
$600,000 | 2.8% |
$700,000 | 2.7% |
$800,000 | 2.6% |
$900,000 | 2.5% |
$1,000,000 or more | 2.4% |
*Installation of water services by city crew – 1" service line | ||
Unpaved Streets | $2,000 | |
Paved Streets | $3,200 | |
If contractor provides excavation, backfill, and paving of trench, city crews will tap the main city water line | $1,200 | |
*Installation of water services – Greater than 1" service line | ||
Actual cost of time and materials for all personnel and equipment | ||
*Commercial: time and materials for all personnel and equipment | ||
*Customers are expected to hire a private contractor to install water on private property. On rare occasions it may be appropriate for city crews to provide the installation. Such cases shall be approved by the public works director or designee. | ||
Sidewalk with residential permit | $50 | |
Sidewalk with residential permit (corner lot) | $100 | |
Driveway approach with residential permit | $50 | |
Repair of sidewalk (to encourage repairs) | $0 | |
Sidewalk/driveway fee after 3 failed inspections | $50 | |
ADA ramp with residential permit | $50 | |
Street cut permit (if within 5-year new pavement moratorium) Applies to residential, collector, and arterial streets | $1,000 | |
Retaining wall inspection (minor; non-engineered) | $150 | |
Site drainage inspection | $50 | |
Erosion control permit | $50 | |
Encroachment fees | $50 | |
Grading or filling permit (if unrelated to building permit) | ||
50 cubic yards or less (not adjacent to wetland or critical area) | No permit required | |
51 – 250 cubic yards | $100 | |
251 – 1,000 cubic yards | $250 | |
1,001 to 10,000 cubic yards | $450 | |