Eureka Mills Superfund Site
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
As used in this Section, the following terms shall have the meaning specified unless the context requires otherwise:
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
All persons undertaking a Restricted Activity within the Site or within the City corporate limits shall comply with the procedures and performance standards provided in this Chapter. This chapter does not apply to the EPA or the State or their employees and contractors conducting cleanup or operation and maintenance activities under CERCLA within the Eureka Mills Superfund Site.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
All Contaminated Soils or soils with unknown lead concentrations removed from excavations for utility installation or repair within a public right-of-way or utility easement that are not replaced in the excavation must be disposed of in the Open Cell. Upon completion of backfilling the final surface of the excavation must be covered with a Hard Surface Cover a minimum of 2 inches thick or Protective Cap that is a minimum of 18 inches thick.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
No person shall undertake or conduct any Restricted Activity without first obtaining a permit from the City. Any excavation or earth moving resulting from an "Exempted Activity" shall not require a permit under this Chapter but shall be subject to the requirements as set forth in Subsection 7 of this Chapter 13. The requirements of this section do not apply to the EPA, the State or its designees conducting a federal Superfund or State hazardous waste response action or Operation and Maintenance of the these actions. The requirements for obtaining a permit in this section do not apply to the City when conducting activities in the ordinary course of business; however such activities shall otherwise comply with the Performance Standards of this Chapter.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
The following performance standards shall apply to all soil disturbing activities including Restricted and Exempted Activities within the Site and within the jurisdiction of the City.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
A property owner may sample and analyze excavated soils at the owner's expense to determine the lead content of the excavated soils. Soil sampling shall be conducted by City staff or by a designated person (contractor) who has been approved by the City and has the appropriate experience and qualifications. All soil samples shall be analyzed by a laboratory accredited by the National Environmental Laboratory Accreditation Program that is qualified to conduct the appropriate soil analyses. All testing shall utilize and adhere to the protocols in Appendix A of this ordinance.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
Upon completion of any permitted activity or within 1 year from the commencement of excavation, which ever occurs first, the permit holder shall notify the City that the activity has been completed in conformance with the requirements of this Chapter and shall request a Certificate of Occupancy.
Prior to issuing a Certificate of Occupancy, the City shall inspect the Permit Area to determine whether the permit conditions have been met and whether the work conforms to the requirements of this Chapter.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
In addition to all other requirements set forth in this Chapter 13, the following requirements shall apply to the use and maintenance of all lands within the Site and the jurisdiction of the City, including, but not limited to, lawns, play areas, and parking lots.
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025
HISTORY:
Ord. 07-19-2010, 7/19/2010
Ord. 2025-06-23, 6/23/2025