Action by planning commission.
The planning commission shall have the function, duty and power to approve or disapprove, or to approve subject to compliance with such modifications or conditions as it may deem necessary to carry out the purpose of these regulations; the design and site plan of all proposed buildings or structures, or the development of the entire property; the specifications of all exits, entrances, streets, highways or other means of ingress and egress; the proposed method, time of construction of the latter and the mode of financing therefor; and the proposed manner of dedication to the public or maintenance of the same; and the location and construction of screening walls and/or fences.
(Code 1969, § 5.275; Code 1977, § 28-476; Ord. No. 23-Q, 9-28-1970)
Action by planning commission.
The planning commission shall have the function, duty and power to approve or disapprove, or to approve subject to compliance with such modifications or conditions as it may deem necessary to carry out the purpose of these regulations; the design and site plan of all proposed buildings or structures, or the development of the entire property; the specifications of all exits, entrances, streets, highways or other means of ingress and egress; the proposed method, time of construction of the latter and the mode of financing therefor; and the proposed manner of dedication to the public or maintenance of the same; and the location and construction of screening walls and/or fences.
(Code 1969, § 5.275; Code 1977, § 28-476; Ord. No. 23-Q, 9-28-1970)