The City of Hamilton shall be divided into the following zoning districts and overlay options:

A.

Single-family residential (RS);

B.

Multiple-family residential district (RM);

C.

Residential high density district (RH);

D.

Historical district (reserved) (HD);

E.

Mobile home park residential district (MHP);

F.

Recreational vehicle park district (RVP);

G.

Professional services business district (PS);

H.

Transitional neighborhood business district (B);

I.

Local business district (B-1);

J.

Highway related business district (B-2);

K.

Central business district (CBD);

L.

Commercial/manufacturing district (C/M);

M.

Manufacturing/industrial district (M/I);

N.

Public institutional district (PI);

O.

Planned unit development (PUD) overlay (reserved) (PUD).

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.020 - Zoning districts intent and purpose statements.

A.

Residential low density district (R-1). The R-1 district establishes zoning for primarily single-family dwellings on urban lots.

B.

Residential medium district (R-2). The R-2 district establishes zoning for one to four family dwelling units.

C.

Residential high density district (R-3). The R-3 district establishes zoning for multiple-family dwelling units.

D.

Historical district (HD). Reserved.

E.

Mobile home park residential district (MHP). The MHP district establishes zoning for semi-permanent placement of mobile housing in subdivisions created for rent or lease

F.

Recreational vehicle park district (RVP). The RVP establishes zoning for a vehicular unit eight feet or less in width, designed as temporary living quarters for recreational camping or travel use and operated under its own motive power or mounted on or drawn by another vehicle, including a travel trailer, camping trailer, truck camper and motor home for temporary parking and set up in a ninety (90) days or less in any twelve (12) month period.

G.

Professional services business district (PS). The PS district establishes zoning regulations for office or professional uses that generate low vehicle traffic volume, which includes medical and health related services adjacent to major medical facilities such as the hospital.

H.

Transitional neighborhood business district (B). The B district establishes zoning for neighborhood and service businesses designed to service the immediate neighborhood.

I.

Local business district (B-1). The B-1 district establishes zoning for local business and retail trade activities not directly dependent upon passing motor traffic.

J.

Highway related business district (B-2). The B-2 district establishes zoning for businesses located along highways and arterials

K.

Central business district (CBD). The CBD district is a part of the original Hamilton town site and was developed for commercial purposes in the 1890's, much before the advent of our current car-based society. It is also referred to as "Downtown Hamilton." Most of the businesses are located on small twenty-five by one hundred thirty (25×130) feet lots with a variety of retail, commercial, professional, government services and residential dwelling units above the street level. The intent of this district is to:

1.

Promote and maintain a viable pedestrian friendly business community;

2.

Encourage remodeling efforts to preserve the historical character of each building and new construction that blends with the old;

3.

Retain on-street parking spaces;

4.

Develop commercial and mixed-use areas that are safe, comfortable and attractive to pedestrians;

5.

Provide flexibility in the site and design of new development and redevelopment to anticipate changes in the market place;

6.

Encourage preservation of the historic character of the central business district;

7.

Promote streets as public places that encourage pedestrian and bicycle travel. Provide roadway and pedestrian connections to residential areas;

8.

Provide transition between high traffic streets and neighborhoods, as stated in the city's transportation plan;

9.

Encourage efficient land use by facilitating high-density development and minimizing the amount of land that is needed for surface parking;

10.

Facilitate land use mix, density and design that supports public transit;

11.

Provide appropriate locations and design standards for commercial and institutional automobile and truck-dependent uses;

12.

Maintain mobility along traffic corridors and state highways.

L.

Commercial/manufacturing district (CM). The CM district establishes zoning for certain commercial and manufacturing uses which generate low volumes of vehicular traffic and create negligible noise, glare, dust or odor.

M.

Manufacturing/industrial district (MI). The MI district establishes zoning for manufacturing and industrial uses.

N.

Public institutional district (PI). The PI district establishes zoning to accommodate those public and institutional uses which are related to the health, safety, educational, cultural and welfare needs of the city.

O.

Planned unit development overlay district (PUD). See Chapter 17.08, Article 4.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.030 - Interpretation of use tables.

A.

Uses in each zoning district are depicted in Tables 17.08.040 — 17.08.080. Permitted uses are indicated with a "P," conditional uses are indicated with a "C," and uses which are not permitted within the district are indicated by a "-."

B.

If a use is not listed in Tables 17.08.040 17.08.080 the zoning administrator shall determine the classification of a particular use and whether it is similar to a permitted or conditional use listed in the applicable district.

C.

Additional requirements.

1.

A * indicates that particular use is defined in Chapter 17.34.

2.

A code section referenced indicates that use is subject to additional standards in that code section.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.040 - Permitted residential uses.

Table 17.08.040

Permitted residential uses
UsesZoning Districts
RSRMRHBB-1B-2CBDPSCMMIPIMHPRVP
Single-family dwellings* P P P P C 1 C 1 P 1 - - - - - -
Townhouses* - P P P - - - - - - - - -
Multiple-family dwelling* — two units C P P P C 1 C 1 P 1 - - - - - -
Multiple-family dwelling* — up to four units - P P P C 1 C 1 P 1 - - - - - -
Multiple-family dwelling* — up to five units - C P P C 1 C 1 P 1 - - - - - -
Multiple-family dwelling* — six to eight units - C P P P C 1 P 1 - - - - - -
Multiple-family dwelling* — more than eight units - - P P P C 1 P 1 - - - - - -
Single-family mobile homes* See Section 17.16.060 - - - - - - - - - - - P -
Accessory dwelling units* See Section 17.16.010 P P P P - - - - - - - - -
Boarding and lodging houses* - C C - - - - - - - - - -
Foster care and licensed family day care homes with six or less full time children C - - - - - - - - - - - -
Community residential facilities and licensed group day care homes with twelve (12) or less full time children* C - - - - - - - - - - - -
Uses deemed compatible with the uses allowed in the district after a public hearing - - - - - - - C - - - - -
Notes: 1. Multiple-Family dwellings in the B-1, CBD, and B-2 districts shall be located above the ground floor, except that in the B-1 district ground floor dwellings are permitted in multiple-family dwellings with more than five units.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.050 - Permitted commercial uses.

Table 17.08.050

Permitted commercial uses
UsesZoning Districts
RSRMRHBB-1B-2CBDPSCMMIPIMHPRVP
Adult day care facilities* - - - - - - - P - - - - -
Arcades - - - - P P P - - - - - -
Arts and crafts studios. - - - P P P - P - - - - -
Auction sales and service - - - - - C - - P P - - -
Bakeries and catering establishments - - - - P P P - - - - - -
Banks, credit unions and other financial institutions - - - - P P P P - - - - -
Barber and beauty shops - - - - - - P - - - - - -
Businesses wherein patronage and/or employment is limited to persons eighteen (18) years of age or older - - - - C C C - - - - - -
Casinos* - - - - C P - - - - - - -
Convenience stores, not to include sale of propane or motor vehicle fuels - - - P P P - - - - - - -
Convenience stores, that include sale of motor vehicle fuels - - - - - P - - - - - - -
Day care centers, preschool, & nursey schools* C - - - C C C P - - - - -
Eating establishments, except drive-thru's. - - - P P P P - - - - - -
Eating establishments, including drive-thru's. - - - - - P - - - - - - -
Educational services (e.g. educational institutions, medical and vocational schools, tutorial services, public or private nonprofit or for profit schools).* - - - - - - - P - - - - -
Equipment and motor vehicle rental outlets - - - - - P - - P P - - -
Hardware stores - - - P P P - - - - - - -
Health related service (e.g. holistic medicine and natural food stores, acupuncturists, acupressure and massage therapy). - - - - - - - P - - - - -
Home occupations* See Section 17.16.040 P P P P P P P P - - P P P
Hotels and motels* - - - - - P - - - - - - -
Laundry and dry cleaning - - - - - - C - - - - - -
Marijuana dispensaries* See Section 17.16.030 - - - - - P P - - - - - -
Marijuana manufacturing* See Section 17.16.030 - - - - - - - - C C - - -
Marijuana testing laboratories* See Section 17.16.030 - - - - - - - P - - - - -
Marijuana transporters* See Section 17.16.030 - - - - - - - - C C - - -
Media offices and production facilities - - - - P P P - - - - - -
Mini storage units* - - - - - C - - P P - - -
Mortuaries and crematoriums - - - - C P - C - - - - -
Motor vehicle repair garages, not to include auto wrecking or salvage yards - - - - - C - - P P - - -
Motor vehicle sales and related services - - - - - P - - - - - - -
Office support services - - - - - - - P - - - - -
Offices and businesses deemed compatible with this district - - - - - C - - - - - - -
Open-air storage - - - - - C - - - - - - -
Optical services and eyewear - - - - - - - P - - - - -
Parking lot(s) and garages* - - - - C P C - P P C - -
Parking or storage of recreational vehicles or camper trailers - - - - - - - - P P - - -
Personal service facilities* - - - P P P P - - - - - -
Printing shops and photography shops - - - - P P P - - - - - -
Professional and business offices. - - - P P P P P - - - - -
Real estate services - - - - - - - P - - - - -
Recreational and fitness facilities - - - - P P P - - - - - -
Recreational vehicle units* - - - - - - - - - - - - P
Repair services, except automotive and small engine repair. - - - P P P - - - - - - -
Retail - - - P P P P - - - - - -
Sale of propane - - - - - C - - - - - - -
Service stations - - - - - P - - - - - - -
Short-term rentals* See Section 17.16.020 P P P P P P P - - - - - -
Social, service and fraternal clubs - - - - P P C - - - - - -
Storage, provided that it is totally enclosed in the building - - - - C C - - - - - - -
Taverns and cocktail lounges - - - - P P P - - - - - -
Theaters - - - - P P P - - - - - -
Uses deemed compatible with the uses allowed in the district after a public hearing - - - - - - C C - - - - -
Vehicle brokers* - - - - - P - - - - - - -

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.060 - Permitted industrial and manufacturing uses.

Table 17.08.060

Permitted industrial and manufacturing uses
UsesZoning Districts
RSRMRHBB-1B-2CBDPSCMMIPIMHPRVP
Assembly or fabrication of products from pre-manufactured components - - - - - - - - P P - - -
Auto wrecking or salvage yards - - - - - - - - - - - - -
Business, manufacturing or scientific research centers, and product development testing laboratories - - - - - - - - P P - - -
Central electrical power stations - - - - - - - - C P - - -
Collection centers for recyclable materials - - - - - - - - C P - - -
Freight terminals - - - - - C - - P P - - -
Industries which generate or manufacture hazardous or toxic materials - - - - - - - - - C - - -
Industries which receive, process or store hazardous or toxic materials - - - - - - - - - C - - -
Manufacturing and production (less than five thousand (5,000) square feet or with light industrial) - - - - C - - - - - - - -
Manufacturing and production (less than five thousand (5,000) square feet or with light retail) - - - - - C - - - - - - -
Manufacturing and production (less than five thousand (5,000) square feet or with retail outlet) - - - - - - C - - - - - -
Production converting raw or recycled materials into components or finished products - - - - - - - - - P - - -
Storage of bulk fuel and petroleum products - - - - - - - - C P - - -
Warehousing or storage of products, materials or equipment not to include bulk fuel or petroleum products - - - - - - - - P P - - -
Wholesale - - - - C C C - P P - - -

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.070 - Permitted public, civic, and institutional uses.

Table 17.08.070

Permitted public, civic, and institutional uses
UsesZoning Districts
RSRMRHBB-1B-2CBDPSCMMIPIMHPRVP
Cemetery - - - - - - - C
Charitable, philanthropic, nonprofit organization facilities - - - - - - - - - - C - -
Church steeples, ornamental towers, spires, or monuments higher than 45 feet - C - - - - - - - - - - -
Churches C C - - - C C - - - C - -
Community centers* C C - - C C C - - - - - -
Convention and exhibition centers - - - - - - - - - - C - -
Correctional facilities - - - - - C - - - - - - -
Cultural centers - - - - - - - - - - C - -
Fairgrounds - - - - - - - C
Group care or total care facilities - - - - - - - C - - - - -
Historical landmarks, sites, memorials and monuments - - - - - - - - - - C
Hospitals, general and specialty* - - - - - - - C - - - - -
Libraries C C - - P P C P - - C - -
Medical and dental clinics* - - - - P P P P - - - - -
Museums - - - - P C P - - - C - -
Nursing homes, rest homes, convalescent homes and homes for the aged* - - - - - - - C - - - - -
Parks and open space C C - - P P P P - - C P P
Playgrounds and recreational facilities C C - - C C - - - - - P P
Government facilities, point of service (e.g. fire, police, post office, etc.) - - - - - - C - - - C - -
Government (no point of service) - - - - - - - - - - C - -
Public and quasi-public utility buildings and facilities necessary to provide services to the surrounding area, when screened from public view - - - - - - - - P P - - -
Schools (public and private) C C - - C C C - - - C - -
Tourist information centers - - - - - P - - - - - - -
Utilities, public and private including communication equipment buildings, electrical distribution substations and related administrative facilities - - - - - - - - - - P - -
Wireless communication towers See Section 17.16.050 - - - - - C - - - - C - -

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.080 - Permitted accessory uses.

Table 17.08.080

Permitted accessory uses
UsesZoning Districts
RSRMRHBB-1B-2CBDPSCMMIPIMHPRVP
Accessory buildings P P P P 1 C 1 C 1 C 1 - - - - - -
Convenience stores housed in permanent structures and used in conjunction with the operation of the recreational vehicle park, including the sale of propane fuels for occupants. - - - - - - - - - - - - P
Folding, collapsible or detachable canopies, awnings and other similar devices designed to be an integral and transportable part of the recreational vehicle unit. - - - - - - - - - - - - P
Manager's residence and/or office. - - - - - - - - - - - P P
Patio canopies, carports, porches and detached storage buildings. - - - - - - - - - - - P -
Personal care, recreational, food service, or retail facilities if totally enclosed within other permitted facilities - - - - - - - C - - - - -
Personal service facilities and food services located in main building of multiple-family dwellings* - C C - - - - - - - - - -
Retail sales incidental to principal manufacturing uses - - - - - - - - P P - -
Uses designed to serve a temporary nature to include showers, toilets and laundry facilities. - - - - - - - - - - - - P
Uses incidental to the uses allowed P P P P C C C - - - - - -
Notes: 1. See Section 17.20.030 for additional requirements for accessory buildings in commercial districts.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.090 - Interpretation of site and structure regulation tables.

Site and structure regulations in each zoning district are shown in Tables 17.08.100 - 17.08.220. For additional requirements, refer to Chapter 17.20 (general development regulations) and Chapter 17.16 (use specific regulations).

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.100 - RS district.

Table 17.08.100

Site and structure regulations in the RS District
RegulationSpecification(s)
1. Minimum lot area 4,200 square feet
2. Minimum lot frontage 30 feet
3. Minimum yard setbacks Front yard: 15 feet.
Rear yard:
• Main building: 20 feet.
• Accessory building: five feet.
• Garages opening to alley: ten feet.
Side yards
• Five feet.
• Corner lots: Ten feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Main building: Two and one-half stories or 35 feet, whichever is less, excluding chimneys, which may extend five feet above the roofline.
Accessory buildings: Two stories or 25 feet whichever is less.
Churches, when allowed by a conditional use permit: 45 feet.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.110 - RM district.

Table 17.08.110

Site and structure regulations in the RM District
RegulationSpecification(s)
1. Minimum lot area Single-family dwelling: 4,200 square feet
Townhouses: 4,200 square feet
Dwellings in excess of one-unit: 2,500 square feet per dwelling unit.
All other uses: 8,000 square feet.
2. Minimum lot frontage Single-family dwelling: 30 feet
Townhouses: 30 feet
Two-family dwellings: 50 feet
Dwellings in excess of two-units: 60 feet
All other uses: 60 feet.
3. Minimum yard setbacks Front yard: 15 feet.
Rear yard:
• Main building: 20 feet.
• Accessory building: five feet
• Garages opening to alley: ten feet.
Side yards
• Five feet.
• Zero feet for interior walls of townhouses.
• Corner lots: Ten feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Main building: Three stories or 45 feet, whichever is less.
Accessory buildings: Two stories or 25 feet, whichever is less.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.120 - RH district.

Table 17.08.120

Site and structure regulations in the RH District
RegulationSpecification(s)
1. Minimum lot area One to two-family dwellings: 4,200 square feet
Three- to four-family dwellings: 2,000 square feet per dwelling unit
Five- to eight-family dwelling units: 1,200 square feet per dwelling unit.
Multi-family dwellings in excess of eight units: 10,000 square feet plus 1,400 square feet for each additional unit over eight.
Townhouses: 1,600 square feet
2. Minimum lot frontage One- to two-family dwellings: 30 feet.
Townhouses: 20 feet
All other uses: 50 feet.
3. Minimum yard setbacks Front yard: 15 feet.
Rear yard:
• Main building: 20 feet.
• Accessory building: five feet
• Garages opening to alley: ten feet.
Side yards
• Five feet.
• Zero feet for interior walls of townhouses.
• Corner lots: Ten feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Main building: Three stories or 45 feet, whichever is less.
Accessory buildings: Two stories or 25 feet, whichever is less.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.130 - MHP district.

Table 17.08.130

Site and structure regulations in the MHP District
RegulationSpecification(s)
1. Minimum lot area Park area: five acres
Lot rental or lease area: 4,000 square feet.
2. Minimum lot frontage 50 feet.
3. Minimum yard setbacks Front yard: 20 feet.
Rear yard: five feet.
Side yards: five feet.
4. Maximum height Permanent structure: Three stories or 45 feet, whichever is less.
Semi-permanent structure: 20 feet.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.140 RVP - district.

Table 17.08.140

Site and structure regulations in the RVP District
RegulationSpecification(s)
1. Minimum lot area Park area: three acres
Lot rental or lease area: 1,250 square feet.
2. Minimum lot frontage 25 feet.
3. Minimum yard setbacks of RV From public street or highway: 25 feet.
From any park perimeter boundary: 15 feet.
4. Maximum height Permanent structure: three stories or 45 feet, whichever is less.
5. Additional regulations Access to a recreational vehicle park shall be from a public street.
A minimum of one off-street parking space shall be provided on or adjacent to each lot
The RV park shall be separated and screened from adjacent residential districts by a permanent wall, fence or hedge of a minimum height of six feet.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.150 - PS district.

Table 17.08.150

Site and structure regulations in the PS District
RegulationSpecification(s)
1. Minimum lot area 10,000 square feet
2. Minimum lot frontage None
3. Minimum yard setbacks Front yard: 20 feet.
Rear yard:
• 20 feet
• Ten additional feet for each story over two.
Side yards
• Ten feet.
• Ten additional feet for each story over two.
• Corner lots: 15 feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Three stories or 45 feet, whichever is less.
5. Screening Where a PS use abuts a residential district, it shall be screened to a height of four feet unless it is separated by a street or an alleyway or a yard of 50 feet.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.160 - B district.

Table 17.08.160

Site and structure regulations in the B District
RegulationSpecification(s)
1. Minimum lot area Commercial uses: 3,500 square feet
Residential uses: same as RH district
2. Minimum lot frontage Commercial uses: 25 feet
Residential uses: same as RH district
3. Minimum yard setbacks Commercial Uses:
• Front yard: 15 feet.
• Rear yard: none
• Side yard: none
• Corner lots: Ten feet for the side yard facing the nonprimary street.
Residential uses: same as RH district.
4. Maximum height Main building: Three stories or 45 feet, whichever is less.
Accessory buildings: Two stories or 25 feet, whichever is less.
5. Maximum lot coverage Commercial uses: 50%
Residential uses: none
6. Maximum building size 12,000 square feet
Buildings in excess of 12,000 square feet may be allowed upon approval by of a special use permit — see Section 17.12.080.
7. Additional regulations All commercial operations and storage of materials in the B district shall be contained within an enclosed building.
Utility service lines shall be installed below ground.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.170 - B-1 district.

Table 17.08.170

Site and structure regulations in the B-1 District
RegulationSpecification(s)
1. Minimum lot area 3,500 square feet
2. Minimum lot frontage 25 feet
3. Minimum yard setbacks None
4. Maximum height Three stories or 45 feet, whichever is less.
5. Maximum lot coverage 50%
6. Maximum building size 24,000 square feet
Buildings in excess of 24,000 square feet may be allowed upon approval by of a special use permit — see Section 17.12.080.
7. Projections into public property • Are limited to parts or appendages of buildings which extend over walks or other rights-of-way adjacent to public streets.
• May include awnings, marquees, sun control devices and miscellaneous architectural ornamentation as authorized by current building codes.
• Includes projecting signs, see Chapter 17.28.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.180 - B-2 district.

Table 17.08.180

Site and structure regulations in the B-2 District
RegulationSpecification(s)
1. Minimum lot area 7,000 square feet
2. Minimum lot frontage 50 feet
3. Minimum yard setbacks Front yard:
• 35 feet.
• 25 feet for motor fuel pumps
Rear yard: none.
Side yards
• None for interior lots.
• Corner lots: 15 feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Three stories or 45 feet, whichever is less.
5. Maximum building size 60,000 square feet
Buildings in excess of 60,000 square feet may be allowed upon approval by of a special use permit - see Section 17.12.080.
6. Additional regulations The entrance to or exit from a public garage shall be located a minimum of 50 feet from a boundary within a residential district.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.190 - CBD district.

Table 17.08.190

Site and structure regulations in the CBD District
RegulationSpecification(s)
1. Minimum lot area 3,250 square feet
2. Minimum lot frontage 25 feet
3. Minimum yard setbacks None
4. Maximum height Three stories or 45 feet, whichever is less.
5. Projections into public property • Are limited to parts or appendages of buildings which extend over walks or other rights-of-way adjacent to public streets.
• May include awnings, marquees, sun control devices and miscellaneous architectural ornamentation as authorized by current building codes.
• Includes projecting signs, see Chapter 17.28.
6. Additional regulations New buildings or exterior renovations of existing buildings visible from a public street or pedestrian way which do not conform to the City of Hamilton Building and Site Design Guidelines including Appendix A — Additional Design Guidelines For the Central Business Zone District and the Historic Downtown Area may only be allowed upon approval by of a special use permit — see Section 17.12.080.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.200 - CM district.

Table 17.08.200

Site and structure regulations in the CM District
RegulationSpecification(s)
1. Minimum lot area 10,000 square feet
2. Minimum lot frontage 50 feet
3. Minimum yard setbacks Front yard: 20 feet
Rear yard: none.
Side yards
• None for interior lots.
• Corner lots: 20 feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Three stories or 45 feet, whichever is less.
5. Maximum lot coverage 70%.
6. Additional regulations • Where a commercial/manufacturing use abuts a residential district the minimum setback on the commercial/manufacturing uses abutting side shall be 200 feet, unless separated by a main arterial street or designated truck route.
• Access to a commercial/manufacturing use shall be a minimum of 200 feet from a residential district unless adjacent to an established main arterial street or designated truck route.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.210 - MI district.

Table 17.08.210

Site and structure regulations in the MI District
RegulationSpecification(s)
1. Minimum lot area 20,000 square feet
2. Minimum lot frontage 150 feet
3. Minimum yard setbacks Front yard: 20 feet
Rear yard: none.
Side yards
• None for interior lots.
• Corner lots: 20 feet measured from the property line adjacent to the nonprimary street.
4. Maximum height Three stories or 45 feet, whichever is less.
None for smokestacks, air pollution equipment, and water towers.
5. Additional regulations • Where a manufacturing/industrial use abuts a residential district, the minimum setback on the manufacturing/industrial use's abutting side shall be 600 feet.
• Access to a manufacturing/industrial use shall be a minimum of 300 feet from a residential district.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.220 - PI district.

Table 17.08.220

Site and structure regulations in the PI District
RegulationSpecification(s)
1. Building site area Shall be established by the zoning board of adjustment.
2. Minimum yard setbacks Shall be established by the zoning board of adjustment.
3. Maximum height Shall be established by the zoning board of adjustment.

 

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.230 - Intent.

The intent of the planned unit development (PUD) overlay district is to:

A.

Ensure future development is in accordance with the City of Hamilton's growth policy or comprehensive plan and the goals, objectives, and policies therein;

B.

Provide flexibility in regulations and standards in exchange for community benefits and innovative, quality design;

C.

Promote logical development patterns of residential, commercial, office and industrial uses that will mutually benefit the developer, the neighborhood, and the community;

D.

Promote the efficient use of land and provision of city infrastructure and services;

E.

Minimize adverse environmental impacts and encourage the preservation and enhancement of natural amenities, cultural resources and open space;

F.

Promote the use of walking and biking as viable transportation options;

G.

Encourage development of a variety of housing types to accommodate households of all ages, sizes, and incomes;

H.

Improve the design, quality and character of new development; and

I.

Encourage development of vacant properties in developed areas.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.240 - Overview.

A.

The PUD overlay district is a zoning designation that overlays an underlying zoning district.

B.

A PUD requires approval of a zone map amendment according to Section 17.12.050 to obtain a PUD designation. A PUD designation is available in the following zoning districts: RM, RH, and B. Approved PUDs shall be identified on the zoning map by appending the map symbol to the underlying zoning district (e.g., "RH/PUD").

C.

PUD zone map amendments must be processed concurrently with a PUD application and preliminary development plan. The zoning administrator shall determine whether a PUD application should be processed concurrently or separately with subdivision and annexation proceedings.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.250 - Approval required.

Approval of PUD preliminary and final development plans must occur before any building permit is issued. Permits may be issued for a development phase if a preliminary development plan has been approved for the entire PUD and a final development plan has been approved for the subject phase.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.260 - Requirements.

A.

No application for a PUD will be approved unless all property included in the application is under unified ownership, a single entity's control, or the application is filed jointly by the owners of all the property to be included.

B.

The approved final development plan must specify a manner of holding title to areas and facilities of joint use and how areas of joint use shall be maintained. Normally such areas and facilities must be retained in title by the developers or deeded to an organization composed of all owners in the development.

C.

PUDs must contain at least two acres.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.270 - Guidelines.

PUDs are encouraged to contain a mixture of the following components:

A.

Building and site design guidelines.

1.

A connected internal street network that also connects with the existing transportation network in the city;

2.

Pedestrian and bicycle facilities throughout and connecting to adjacent nonmotorized transportation facilities;

3.

Lots and blocks with alleys;

4.

A coordinated landscape plan;

5.

Storm water management that utilizes natural features, including the use of low impact design such as bioswales;

6.

Blocks no larger than three hundred fifty (350) feet in length;

7.

Limited curb cuts;

8.

The use of slow flow or yield streets;

9.

Prevalent on-street parking;

10.

Boulevard sidewalks;

11.

Building entrances oriented towards the street;

12.

Landscaping screening off-street parking;

13.

Lighting that minimizes light pollution and trespass; and

14.

Street trees.

B.

Land use guidelines.

1.

A mixture of single and multi-family housing;

2.

Affordable housing units;

3.

A mix of residential and neighborhood commercial land uses;

4.

Off-street parking located on the rear portion of the lot or behind the main building; and

5.

Public spaces such as playgrounds, plazas, parks, or trails designed for active and passive users.;

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.280 - Regulations and standards eligible for deviation.

A.

In order to encourage flexibility and creativity, quality designs, and community benefits, deviations from the following regulations may be granted by the city council during PUD designation:

1.

Uses allowed;

2.

Minimum lot area;

3.

Minimum lot frontage;

4.

Minimum yards (setbacks);

5.

Maximum height;

6.

Maximum lot coverage;

7.

Off-street parking and loading requirements; and

8.

Streets

a.

Alternatives to the City of Hamilton Public Works Standards street cross-sections and designs may be approved when the city council determines that such alternative designs would better meet the purpose of the PUD overlay, while still providing a safe and efficient transportation system. The city public works director and fire chief must review and make recommendations on requests for alternative street standards.

B.

All requested deviations and other relaxations of regulatory requirements must be identified in writing at the time of preliminary development plan submittal. Failure to identify such items may result in the delay of application processing. Regulations and standards proposed to be modified do not require review or approval of variances, but may be approved through the PUD designation and review process. In granting deviations, the city council shall have the right to establish and provide conditions and limitations.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.290 - Preliminary development plan review.

A.

A preapplication meeting between the applicant (or applicant's agent) and the city zoning administrator is required before submitting a PUD application and preliminary development plan. At the time of request for a preapplication meeting, the applicant shall provide a sketch showing the layout and features of the proposed PUD. The zoning administrator shall review the preapplication request and submitted information and meet with the applicant within thirty (30) calendar days of submittal. The zoning administrator may request other city departments participate in the preapplication meeting as deemed necessary. At the preapplication meeting the zoning administrator will provide the applicant with written comments regarding the submittal, review process, and recommendations to inform and assist the applicant prior to preparing the PUD applicant and preliminary development plan. For a PUD project reviewed as a subdivision, the subdivision preapplication review may serve to meet this requirement.

B.

At the option of the applicant, the preliminary development plan may also serve as the preliminary subdivision plat if such intention is declared before the planning board and zoning commission public hearing and if the application(s) include all information required for preliminary plats and preliminary development plans.

C.

In addition to the requirements for zone map amendments and subdivisions (if applicable), each PUD application must include the following items:

1.

A preliminary site plan showing the location and area of lots and blocks, buildings, motorized and nonmotorized transportation facilities, public spaces, parking, landscaping, utilities, and other pertinent features;

2.

A list of the specific requirements and standards that are requested to be modified;

3.

A list of land uses that are proposed;

4.

The total number of residential dwelling units by type of dwelling unit and total net and gross residential density;

5.

Total number of commercial buildings by type of building and total net and gross building density;

6.

Information about buildings including type, size, and locations;

7.

Landscape plan including plans for irrigation;

8.

Description of public spaces, parks, and recreation amenities;

9.

A written description of the community benefits of the proposed development, how the proposed PUD provides greater benefits to the city than would development in line with existing regulations and standards, and how the proposed development incorporates the guidelines from section 17.08.270;

10.

A written narrative regarding how the proposed PUD conforms to the City's growth policy or comprehensive plan;

11.

A description and draft documents indicating how common areas and facilities will be managed.

D.

The zoning administrator shall review the PUD application and preliminary development plan in light of the provisions of this chapter and the review criteria in Section 17.08.300. The zoning administrator shall prepare a report and recommendation for the planning board and zoning commission based on the zoning administrator's review. The zoning administrator may incorporate other city staff comments into the report, or request city staff provide supplemental reports as needed.

E.

The planning board and zoning commission shall hold a joint public hearing on the PUD application and preliminary development plan. Following the close of the hearing the collective planning board and zoning commission must act by simple majority vote to recommend to city council that the PUD and preliminary development plan be approved, approved with conditions, or denied.

F.

After action by the planning board and zoning commission, the city council must convene its own public hearing on the PUD application and preliminary development plan. Following the close of the public hearing, the city council may act to approve, approve with conditions, or deny the PUD application and preliminary development plan. The city council may also return the application to the planning board and zoning commission for further consideration, together with a written explanation of the reasons for doing so.

G.

All public hearings of the planning board, zoning commission, and city council on PUD applications and preliminary development plans shall be noticed according to Section 17.12.030. Such notices may be consolidated with other notices related to the project as long as the various aspects of the project (e.g., PUD review, zone map amendment, annexation, subdivision, etc.) are properly noticed in compliance with city and state requirements.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.300 - Review criteria.

A.

In reviewing and making decisions on a PUD application and preliminary development plan, the following criteria must be considered:

1.

The zone map amendment criteria in Montana Code Annotated 76-2-304

2.

The PUD application and preliminary development plan's consistency with Section 17.08.230 (Intent);

3.

The PUD application and preliminary development plan's consistency with Section 17.08.270 (Guidelines);

4.

The extent to which the PUD application and preliminary development plan would result in a greater benefit to the city than would development under conventional zoning regulations;

5.

Subdivision review criteria as established by Hamilton Municipal Code (if applicable) and Montana law; and

6.

Annexation review criteria as established by city policy (if applicable) and Montana law.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.310 - Final development review.

A.

Final development plan applications must be filed with city planning department after approval of and before the lapse of a preliminary development plan.

B.

A final development plan will not be considered complete and ready for processing if all approved conditions of approval have not been met or if the final development plan constitutes a major change from the approved preliminary development plan, per Section 17.08.350 (Changes to Approved Plans) of this chapter.

C.

If a final development plan is submitted that constitutes a major change to an approved PUD application and preliminary development plan, no further processing of the final development plan may occur. The zoning administrator shall notify the applicant that major changes may be made only in accordance with Section 17.08.350 (Changes to Approved Plans) of this chapter.

D.

If the final development plan complies with the approved preliminary development plan, all conditions of the preliminary development plan approval, and all applicable standards of this zoning ordinance, the city council must approve the final development plan.

E.

If the submitted final development plan does not comply with the approved preliminary development plan, any conditions imposed on that plan, or any applicable standards of this zoning ordinance, the city council must deny the final development plan and advise the applicant in writing of the specific reason for denial. In the event that the city council does not approve the final development plan, the applicant may resubmit the final development plan to correct any identified inconsistencies and deficiencies.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.320 - Effect of approval.

A.

An approved final development plan shall be filed with the county clerk and recorder's office immediately.

B.

The filing of a final development plan with the county clerk and recorder's office does not constitute the effective dedication of easements, rights-of-way, or access control, nor will the filed plan be the equivalent of or an acceptable alternative for the final platting of land or dedication of easements.

C.

A PUD project must be developed in accordance with the approved final development plan. If the applicant chooses to abandon a final development plan or portion thereof after it has been given final approval, they must notify the zoning administrator.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.330 - Duration of approval.

A.

If the applicant fails to file an application for final development plan approval within two years of the date of preliminary development plan approval, the approval will be deemed to have lapsed and the preliminary development plan will lapse and be of no further effect.

B.

For projects to be developed in phases, phase limits must be shown on the preliminary development plan. The city council may impose conditions upon the phasing plan as deemed necessary to ensure orderly development and compliance with current public health and safety standards, including requirements for financial guarantees ensuring construction of all required improvements.

C.

In the event the applicant fails to commence development shown on the final development plan within two years after final approval, then such final approval will lapse and be of no further effect unless the time period is extended by the city council after review of a written application by the applicant.

D.

Requests for extensions must be submitted to the zoning administrator before the final development plan approval expires and must be processed in accordance with the procedures for approval of a PUD application and preliminary development plan.

E.

In the event of lapse of preliminary or final approval, approved PUD plans have no further effect.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.340 - Phasing.

A.

The city council may approve phased PUDs that extend beyond the maximum two-year preliminary approval period set forth in Section 17.08.330, in accordance with a phasing schedule proposed by the applicant.

B.

Phased PUDs and corresponding phasing plans shall follow the application and review procedures outlined in Section 17.08.290 (Preliminary Development Plan Review) and Section 17.08.300 (Review Criteria).

C.

Phasing Plans:

1.

Applicants applying for a phased PUD must submit a phasing plan that includes phased development boundaries, schedules, conceptual development plan map, and other details pertaining to the phasing of the project.

2.

Phasing plans must be submitted along with materials required in Section 17.08.290 (Preliminary Development Plan Review) for the phase(s) to be developed within the initial two-year time frame established in Section 17.08.330.

3.

Conceptual development plan maps shall include the following elements:

a.

Motorized and nonmotorized transportation infrastructure;

b.

Locations of public spaces and open space corridors;

c.

Proposed land uses and housing types for each phase; and

d.

Estimated residential densities for each phase.

4.

All phases of a PUD must conform to the phasing plan.

D.

Within ten years of the date the phased plan is approved by city council, all individual phases must be submitted for review and approved, conditionally approved, or denied in accordance with the preliminary development plan review and approval procedures outlined in this chapter. Any phase not approved, conditionally approved, or denied within this ten-year timeframe shall be null and void.

E.

The applicant may change the phasing schedule only with approval of city council following a public hearing. The city council may approve a proposed change to the phasing schedule only if the change does not negate a condition of approval or otherwise adversely affect public health, safety, or welfare.

F.

Completion assurance.

1.

The applicant shall provide agreements, contracts, covenants, deed restrictions, and sureties acceptable to the Hamilton City Attorney for the completion of the development according to the approved conceptual development plan and any other documents of record, and for the maintenance of such areas, functions, and facilities as are not to be provided, operated, or maintained by the city, and shall place covenants on the property to bind any successors in title to any commitments made under this section.

(Ord. No. 441 , Exh. A, 6-6-23)

17.08.350 - Changes to approved plans.

A.

Changes to an approved development or phasing plan shall be processed using the procedures outlined in this section for minor and major changes.

B.

Minor changes.

1.

Minor changes may be approved administratively by the zoning administrator in writing without additional public notice.

2.

Minor changes are defined as follows:

a.

Changes that do not alter the character of development;

b.

A less than five percent change in the number of residential dwelling units;

c.

A less than five percent increase in gross nonresidential floor space;

d.

A less than five percent reduction in the amount of land set aside for public space;

e.

Changes that do not create substantial adverse impact on surrounding property owners or adversely affect public health, safety, or welfare.

C.

Major Changes

1.

Major changes may be made only after review and rehearing of a new PUD application and preliminary development plan in accordance with review procedures outlined in Section 17.08.290 (Preliminary Development Plan Review), including payment of fees, all notices, and hearings.

2.

Major changes are defined as follows:

a.

Changes that alter the character of development;

b.

A five percent or greater change in the number of residential dwelling units;

c.

A five percent or greater increase in gross nonresidential floor space;

d.

A five percent or greater reduction in land set aside for public space;

e.

A reduction in the number of affordable dwelling units;

f.

A change in the location or placement of buildings;

g.

An increase in the number of lots;

h.

Changes that create substantial adverse impact on surrounding property owners or adversely affect public health, safety, or welfare.

(Ord. No. 441 , Exh. A, 6-6-23)