[Ord. #05-1340, § 1]
A certificate of occupancy must be obtained pursuant to the Uniform Construction Code for all new constructions, reconstructions, alterations, conversions or installations of a structure or building.
No certificate of occupancy shall be issued until all applicable requirements of the Uniform Construction Code and the regulations adopted thereunder, the site plan, subdivision, and plot plan have been complied with, including all underground utilities, bituminous stabilized base course for the roadway, and grading within six inches of approved finished grade which shall be shown on an as-built survey certified by a New Jersey licensed land surveyor. Said as built grading survey shall not be a requirement for the issuance of a certificate of occupancy for the construction of an addition to existing single family residences when said addition does not exceed 25% of the gross floor area of the existing structure and does not require any bulk variance(s).
A certificate of occupancy shall be issued when unfinished site work, such as parking, landscaping, drainage and lighting, is covered by a performance guarantee. The performance guarantee shall be posted with the township committee, in an amount approved by the township engineer and form approved by the township attorney, to ensure the completion of the unfinished site work.