ZONING - GENERAL PROVISIONS 1
Priority | Category | Equipment | Location | Permitted (P) |
|---|---|---|---|---|
1 | Commercial1 Transportation2 | Antenna | Collocated with other antennas on existing structure or tower within a transportation corridor | P |
2 | Commercial1 Transportation2 | Antenna | Existing structure or tower within a transportation corridor | P |
3 | Commercial1 | Antenna | Collocated with other antennas on existing structures or towers | P |
4 | Commercial1 | Antenna | Existing structure or tower | P |
5 | Residential3 Transportation2 | Antenna | Collocated with other antennas on existing structures or tower with a transportation corridor | P |
6 | Residential3 Transportation2 | Antenna | Existing structure or tower | P |
7 | Residential3 | Antenna | Collocated with other antenna on existing structure or tower | P |
8 | Residential3 | Antenna | Existing structure or tower | P |
1"Commercial" includes the VRC-HLI, C-1, SC, SC-1, HBO, OICC, SI, OP, OLI, IC, RO-1, RO-2, RO-3, R-6 and Q zones |
2"Transportation" means the lot has frontage on Route 31, Route 29 or 1-95 |
3"Residential" includes the R-5, R-50, R-75, R-100, R-150, VRC and MRC zones |
Table 1: Minimum Frequency of Water Level Measurements in Wells During Pumping and Recovery Phases of Aquifer Test | ||
|---|---|---|
Time Since Pumping Began or Stopped | Test Well | Observation Wells |
0 to 5 minutes | 0.5 minutes | 0.5 minutes |
5 to 10 minutes | 1 minute | 1 minute |
10 to 30 minutes | 2 minutes | 2 minutes |
30 to 60 minutes | 5 minutes | 5 minutes |
60 to 120 minutes | 10 minutes | 10 minutes |
2 to 24 hours | 30 minutes | 30 minutes |
Table 2: Number of Observation Wells Required for Residential Subdivisions/Site Plans | |
|---|---|
No. of Proposed New Units | No. of Observation Wells |
2 to 5 | 3 (minimum of 1 new well within proposed development) |
6 to 25 | 3 (minimum of 2 new wells within proposed development) |
26 to 49 | 6 (minimum of 4 new wells within proposed development) |
50 or more | Test proposal submitted to Board and NJDEP for review and approval |
Table 3: Aquifer Test Requirements for Nonresidential Developments. | |
|---|---|
Average Demand (gallons per day) | No. of Observation Wells |
800 to 1,999 | 3 (minimum of 1 new well within proposed development) |
2,000 to 9,999 | 3 (minimum of 2 new wells within proposed development) |
10,000 to 99,999 | 6 (minimum of 2 new wells within proposed development) |
100,000 or more | Obtain NJDEP Water Allocation Permit |
Min. lot size | 50 acres |
Min. lot width | 250 feet |
Min. lot depth | 250 feet |
Min. front yard | 350 feet |
Min. side yard | 300 feet |
Min. rear yard | 300 feet |
Max. building height | 35 feet |
Max. lot coverage | 15% |
Min. landscaped buffer along a public road | See § 17-95j |
ZONING - GENERAL PROVISIONS 1
Priority | Category | Equipment | Location | Permitted (P) |
|---|---|---|---|---|
1 | Commercial1 Transportation2 | Antenna | Collocated with other antennas on existing structure or tower within a transportation corridor | P |
2 | Commercial1 Transportation2 | Antenna | Existing structure or tower within a transportation corridor | P |
3 | Commercial1 | Antenna | Collocated with other antennas on existing structures or towers | P |
4 | Commercial1 | Antenna | Existing structure or tower | P |
5 | Residential3 Transportation2 | Antenna | Collocated with other antennas on existing structures or tower with a transportation corridor | P |
6 | Residential3 Transportation2 | Antenna | Existing structure or tower | P |
7 | Residential3 | Antenna | Collocated with other antenna on existing structure or tower | P |
8 | Residential3 | Antenna | Existing structure or tower | P |
1"Commercial" includes the VRC-HLI, C-1, SC, SC-1, HBO, OICC, SI, OP, OLI, IC, RO-1, RO-2, RO-3, R-6 and Q zones |
2"Transportation" means the lot has frontage on Route 31, Route 29 or 1-95 |
3"Residential" includes the R-5, R-50, R-75, R-100, R-150, VRC and MRC zones |
Table 1: Minimum Frequency of Water Level Measurements in Wells During Pumping and Recovery Phases of Aquifer Test | ||
|---|---|---|
Time Since Pumping Began or Stopped | Test Well | Observation Wells |
0 to 5 minutes | 0.5 minutes | 0.5 minutes |
5 to 10 minutes | 1 minute | 1 minute |
10 to 30 minutes | 2 minutes | 2 minutes |
30 to 60 minutes | 5 minutes | 5 minutes |
60 to 120 minutes | 10 minutes | 10 minutes |
2 to 24 hours | 30 minutes | 30 minutes |
Table 2: Number of Observation Wells Required for Residential Subdivisions/Site Plans | |
|---|---|
No. of Proposed New Units | No. of Observation Wells |
2 to 5 | 3 (minimum of 1 new well within proposed development) |
6 to 25 | 3 (minimum of 2 new wells within proposed development) |
26 to 49 | 6 (minimum of 4 new wells within proposed development) |
50 or more | Test proposal submitted to Board and NJDEP for review and approval |
Table 3: Aquifer Test Requirements for Nonresidential Developments. | |
|---|---|
Average Demand (gallons per day) | No. of Observation Wells |
800 to 1,999 | 3 (minimum of 1 new well within proposed development) |
2,000 to 9,999 | 3 (minimum of 2 new wells within proposed development) |
10,000 to 99,999 | 6 (minimum of 2 new wells within proposed development) |
100,000 or more | Obtain NJDEP Water Allocation Permit |
Min. lot size | 50 acres |
Min. lot width | 250 feet |
Min. lot depth | 250 feet |
Min. front yard | 350 feet |
Min. side yard | 300 feet |
Min. rear yard | 300 feet |
Max. building height | 35 feet |
Max. lot coverage | 15% |
Min. landscaped buffer along a public road | See § 17-95j |