48 - MOVING OF BUILDINGS
These provisions are designed to facilitate and manage the moving of buildings and structures within Iron County and to establish necessary requirements for the moving of buildings and structures.
(Ord. 158 § 1 (part), 1998)
An application for the moving of buildings shall be filed with the zoning administrator.
(Ord. 158 § 1 (part), 1998)
A.
An application for the moving of buildings shall be reviewed and approved by the zoning administrator.
B.
In considering the request for the moving of buildings, the zoning administrator shall consider the following, among other items, and find:
1.
That the building will have no material negative effect on the surrounding area and property values in the area to which the building is to be moved;
2.
The building is in conformity with the type and quality of the buildings existing in the area to which the building is to be moved;
3.
That the building and the property on which the building is proposed to be located complies fully with all the provisions of this title and all applicable building codes;
4.
The building and its proposed location does not in any way adversely affect existing buildings, uses or property in the area;
5.
That all approvals, dedications and improvements required by the county are provided in conformity with the standards of the land management code and all other county ordinances.
C.
Upon finding of compliance with the items listed and any other items deemed necessary, the zoning administrator may approve the application for the moving of buildings.
(Ord. 158 § 1 (part), 1998)
Before building permits can be issued, and as a condition of approval of the application for the moving of buildings, the zoning administrator may require the applicant to post a bond as determined necessary to adequately cover the installation of all improvements required by the county in approving the application.
(Ord. 158 § 1 (part), 1998)
Prior to the issuance of any certificate of occupancy, the building official will ensure that the building complies with all requirements of this title, the land management code, the county's adopted building codes and other codes as adopted by the county and shall require that all conditions of approval of the application for the moving of buildings have been complied with.
(Ord. 158 § 1 (part), 1998)
When the site to be vacated by the moving building or structure is located within the county, the zoning administrator may require a bond, authorized by Section 17.48.040 for all costs to restore the vacated site to a safe and sightly condition.
(Ord. 158 § 1 (part), 1998)
48 - MOVING OF BUILDINGS
These provisions are designed to facilitate and manage the moving of buildings and structures within Iron County and to establish necessary requirements for the moving of buildings and structures.
(Ord. 158 § 1 (part), 1998)
An application for the moving of buildings shall be filed with the zoning administrator.
(Ord. 158 § 1 (part), 1998)
A.
An application for the moving of buildings shall be reviewed and approved by the zoning administrator.
B.
In considering the request for the moving of buildings, the zoning administrator shall consider the following, among other items, and find:
1.
That the building will have no material negative effect on the surrounding area and property values in the area to which the building is to be moved;
2.
The building is in conformity with the type and quality of the buildings existing in the area to which the building is to be moved;
3.
That the building and the property on which the building is proposed to be located complies fully with all the provisions of this title and all applicable building codes;
4.
The building and its proposed location does not in any way adversely affect existing buildings, uses or property in the area;
5.
That all approvals, dedications and improvements required by the county are provided in conformity with the standards of the land management code and all other county ordinances.
C.
Upon finding of compliance with the items listed and any other items deemed necessary, the zoning administrator may approve the application for the moving of buildings.
(Ord. 158 § 1 (part), 1998)
Before building permits can be issued, and as a condition of approval of the application for the moving of buildings, the zoning administrator may require the applicant to post a bond as determined necessary to adequately cover the installation of all improvements required by the county in approving the application.
(Ord. 158 § 1 (part), 1998)
Prior to the issuance of any certificate of occupancy, the building official will ensure that the building complies with all requirements of this title, the land management code, the county's adopted building codes and other codes as adopted by the county and shall require that all conditions of approval of the application for the moving of buildings have been complied with.
(Ord. 158 § 1 (part), 1998)
When the site to be vacated by the moving building or structure is located within the county, the zoning administrator may require a bond, authorized by Section 17.48.040 for all costs to restore the vacated site to a safe and sightly condition.
(Ord. 158 § 1 (part), 1998)