[Amended 2-15-2012 by L.L. No. 1-2012]
For all purposes of this chapter, "excavation operations" shall in no event be construed to mean, be, or include natural gas and/or petroleum exploration activities or natural gas and/or petroleum extraction activities (as those terms are defined at § 160-141 of this chapter). Excavation operations, including the extraction of sand, gravel and topsoil and the processing or other operations for the preparation of sand and gravel, may be permitted in the Agricultural-Residential Use District of the Town of Jerusalem, provided that the following conditions and standards are observed and an advanced special use permit is received.
A.
The minimum lot area for such use shall be five acres. All buildings and excavation operations shall be located or shall occur not less than 30 feet from any street or property lines. The Zoning Board of Appeals may require fencing or some similar effective barrier of six feet in height where excavations exceed four feet.
B.
All buildings and structures used in such operations shall be dismantled and removed within 12 months following the termination of the operations. Such dismantling and removal shall be at the expense of the operator and shall be a condition of approval of its special use permit.
C.
All equipment used for the extraction of sand and gravel and processing thereof shall be maintained and operated in such a manner as to eliminate, as far as practicable, noises, vibrations and dust conditions which are injurious or substantially annoying to persons living in the vicinity. A plan for storage and disposal of hazardous materials and waste materials, antifreeze, etc., from equipment used, serviced and/or stored on site shall be submitted with the special use request.
[Amended 3-16-2016 by L.L. No. 2-2016]
D.
All buildings, structures and plants used for the processing of excavated materials shall be maintained so as to assure that such buildings, structures and plants shall not become dilapidated.
E.
All areas which have been excavated must be rehabilitated in accordance with the standards set forth herein within one year of the termination of operations at the expense of the operator and shall be a condition of the approval of the special use permit.
(1)
Excavations made to water-producing depth shall be properly sloped to the waterline with banks sodded or surfaced with soil of equal quality to adjacent land area topsoil. Such topsoil required under this section shall be planted with trees, shrubs, legumes or grasses upon the parts of such area where revegetation is possible.
(2)
Excavations not made to a water-producing depth must be graded or backfilled with nonnoxious, nonflammable, noncombustible, solid material and in a topographic character which will result in general conformity to adjacent lands; such grading or backfilling shall be designed to minimize erosion and shall be surfaced with a soil equal in quality to that of adjacent land areas and planted with trees, shrubs, legumes or grasses upon the parts of such areas where revegetation is possible.