No building permit for new construction shall be issued unless a zoning permit pursuant to § 900.2 has first been issued by the Zoning Officer. Every application for a building permit shall be accompanied by duplicate plans, drawn in ink, or blueprint, having final approval of the Planning Board or Zoning Board of Adjustment as required under N.J.S.A. 40:55D-1 et seq. and as required by the land development regulations of the City of Lambertville showing the actual shape and dimensions of the lot to be built upon, the exact location, size and height of the structures and accessory structures existing and proposed, and the lines within which the building or structure is to be erected or altered, the existing or intended use of each structure or part of a structure, the number of families or dwelling units the structure is designed to accommodate, the number and location of off-street parking spaces and off-street loading areas and such other information with regard to the lot and neighboring lots as may be necessary to determine and provide for the enforcement of this Ordinance. One copy of such plans shall be returned to the owner when such plans shall have been approved by the Construction Code Official together with such permit as may be granted.
All dimensions shown on these plans relating to the location and size of the lot to be built upon shall be based on actual survey. The lot and the location of the structure thereon shall be staked out on the grounds before construction is started. Every application for a building permit shall be submitted by the owner of the land as indicated on the City of Lambertville tax assessment records or by a person furnishing a certification from the land owner granting such permission to the applicant for filing the application.