A. Purpose: The purpose of site plan and architectural review is for the review of the design and layout of new development in the City to ensure that it is consistent with the regulations of this title, other relevant titles in the Lemoore Municipal Code, and all relevant City policies, requirements, and development standards that would apply to the project prior to the issuance of subsequent permits, such as discretionary actions required by the City Zoning Ordinance or City Subdivision Ordinance, improvement plans, and building permits. It is the intent that site plan and architectural review be a ministerial action limited to review of the project development project for conformance with City of Lemoore ordinances, policies, requirements, and development standards.
B. Applicability: Site plan and architectural review shall be required prior to the issuance of any ministerial building permits or site improvement plans and prior to any discretionary action of corresponding development applications (e.g., conditional use permit, variance). Site plan and architectural review may serve as the preliminary application for housing development projects seeking vesting rights pursuant to SB 330, the Housing Crisis Act of 2019.
1. Review Required: Site plan and architectural review is required for all of the following activities:
a. New nonresidential or mixed-use developments;
b. Nonresidential building additions greater than 1,000 square feet;
c. Conceptual plan for a mixed-use center as required by chapter 7, “Mixed Use Development Standards”, of this title.
d. New multi-family residential developments of more than two units (e.g., apartments, condominiums, townhomes)
e. The design and layout of new residential subdivisions as part of the tentative subdivision map process as provided in title 8, chapter 7, “Land Division”, of the Municipal Code;
f. Demolition or exterior alterations and additions to nonresidential buildings that are more than seventy five (75) years old.
2. Exemptions: The following activities are specifically exempt from site plan and architectural review:
a. Single-family residential homes and duplexes on an existing lot;
b. Additions to or the exterior remodels of single-family residential homes within normal setbacks;
c. Accessory structures consistent with the provisions of section 9-4D-18, “Residential Accessory Structures”, of this title;
d. Changes to the exterior facade of existing buildings;
e. Painting existing buildings in the DMX zoning districts with historic color palettes as described in subsection 9-6-4C, “Colors And Painting”, of this title;
f. Repairs and maintenance to the site or structure that do not add to, enlarge, or expand the area occupied by the land use, or the floor area of the structure and that employ the same materials and design as the original construction;
g. Interior alterations that do not increase the gross floor area within the structure, or change/expand the permitted use of the structure (including solar collectors); and
h. Construction, alteration, or maintenance by a public utility or public agency of underground or overhead utilities intended to service existing or nearby approved developments.
i. Nonresidential building additions of 1,000 square feet of gross floor area or less.
C. Approval Authority: The designated approval authority for site plan and architectural design review shall be the Community Development Director.
D. Process: The applicant shall provide a completed application on a form provided by the City, a site plan and, if new non-residential buildings or multi-family dwellings are proposed, an elevation plan. No public hearing or notice is required for a site plan and architectural review. Site plan and architectural review is a ministerial process conducted by City staff to determine compliance with existing City of Lemoore ordinances, policies, requirements, and development standards and is therefore exempt from the requirements of the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15268.
E. Approval: A site plan and architectural review permit, or any modification thereto, shall be granted only when the designated approving authority finds that the proposed project is consistent with the objectives of the general plan and complies with applicable zoning regulations, specific plan provisions, and policies and improvement standards adopted by the City, or that a general plan amendment or zoning amendment is going to be subsequently applied for by the developer. If the site plan submitted requires major changes before this finding can be made, the developer may be required to make changes and submit the site plan again.
F. Post approval Implementation: A site plan and architectural design review permit is ministerial in nature. As such, the Planning Director may not impose discretionary conditions on the issuance of the permit. If the proposed development project requires approval of a discretionary action after completion of the site and architectural design review process, conditions of approval can be placed on the discretionary approval.
G. Appeals. If the applicant disagrees with the interpretation or application of a City ordinance, policy, requirement, or development standard, they may appeal the interpretation per procedures in Section 9-2A-7 and 9-2A-8.
H. Expiration. A site plan and architectural design review permit shall expire one (1) year after issuance unless an application for a related discretionary approval or a building permit is submitted. Upon written request by the applicant prior to expiration, the Community Development Director may extend the expiration for an additional one (1) year. (Ord. 2013-05, 2-6-2014; amd. Ord. 2018-03, 5-15-2018; Ord. 2023-10, 9-19-2023)