Control
The legislature of the state of Utah has in Utah Code §§ 10-3-701 and 17-53-201 delegated the responsibility of local governmental units to adopt regulations designed to minimize flood losses. Therefore, the city council of Nibley City, Utah, does ordain as follows:
Nibley City elects to comply with the requirements of the national flood insurance act of 1968 (PL 90-488, as amended). The national flood insurance program, established in the aforesaid act, provides that areas of the town having a special flood hazard be identified by the federal emergency management agency and that floodplain management measures be applied in such flood hazard areas. The national flood insurance program was broadened and modified with the passage of the flood disaster protection act of 1973 and other legislative measures. It was further modified by the national flood insurance reform act of 1994. The national flood insurance program is administered by the federal emergency management agency, a component of the U.S. department of homeland security.
Unless specifically defined below, words or phrases used in this title shall be interpreted to give them the meaning they have in common usage and to give this title its most reasonable application:
AREA OF FUTURE CONDITIONS FLOOD HAZARD: The land area that would be inundated by the one percent (1%) annual chance (100-year) flood based on future conditions hydrology.
AREA OF SHALLOW FLOODING: A designated AO, AH, AR/AO, AR/Aft or VO zone on a community's flood insurance rate map (FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth of one to three feet (3') where a clearly defined channel does not exist, where the path of flooding is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
AREA OF SPECIAL FLOOD HAZARD: The land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year. The area may be designated as zone A on the FHBM. After detailed ratemaking has been completed in preparation for publication of the flood insurance rate map, zone A usually is refined into zones A, AO, AE-1, A1-30, AE, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, VO, or V1-30, VE, or V. For purposes of these regulations, the term "special flood hazard area" is synonymous in meaning with the phrase "area of special flood hazard".
AREA OF SPECIAL FLOOD RELATED EROSION HAZARD: The land within a community which is most likely to be subject to severe flood related erosion losses. The area may be designated as zone E on the flood hazard boundary map (FHBM). After the detailed evaluation of the special flood related erosion hazard area; in preparation for publication of the FIRM, zone E may be further refined.
BASE FLOOD: The flood having a one percent (1%) chance of being equaled or exceeded in any given year.
BASE FLOOD ELEVATION (BFE): The water surface elevation of the one percent (1%) annual chance flood. The height in relation to mean sea level expected to be reached by the waters of the base flood at pertinent points in the floodplains of coastal and riverine areas.
BASEMENT: Any area of the building having its floor subgrade (below ground level) on all sides.
BREAKAWAY WALL: A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces, without causing damage to the elevated portion of the building or supporting foundation system.
BUILDING: See definition of Structure.
DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.
EROSION: The process of the gradual wearing away of land masses. This peril is not per se covered under the program.
EXISTING CONSTRUCTION: For the purposes of determining rates, structures for which the "start of construction" commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. "Existing construction" may also be referred to as "existing structures".
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.
EXISTING STRUCTURES: See definition of Existing Construction.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufacturing homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
FLOOD ELEVATION DETERMINATION: A determination by the administrator of the water surface elevations of the base flood, that is, the flood level that has a one percent (1%) or greater chance of occurrence in any given year.
FLOOD INSURANCE RATE MAP (FIRM): An official map of a community, on which the administrator has delineated both the special hazard areas and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY OR FLOOD ELEVATION STUDY: An examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) and/or flood related erosion hazards.
FLOOD OR FLOODING:
FLOODPLAIN OR FLOOD PRONE AREA: Any land area susceptible to being inundated by water from any source (see definition of Flood Or Flooding).
FLOODPROOFING: Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
FLOODWAY: See definition of Regulatory Floodway.
FLOODWAY ENCROACHMENT LINES: The lines marking the limits of floodways on federal, state and local floodplain maps.
FREEBOARD: A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
FUNCTIONALLY DEPENDENT USE: A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and shipbuilding and ship repair facilities, but does not include long term storage or related manufacturing facilities.
HIGHEST ADJACENT GRADE: The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
HISTORIC STRUCTURE: Any structure that is:
LEVEE: A manmade structure usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control, or divert the flow of water so as to provide protection from temporary flooding.
LEVEE SYSTEM: A flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.
LOWEST FLOOR: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of section 60.3 of the national flood insurance program regulations.
MANUFACTURED HOME: A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" does not include a "recreational vehicle".
MANUFACTURED HOME PARK OR SUBDIVISION: A parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale.
MAP: The flood hazard boundary map (FHBM) or the flood insurance rate map (FIRM) for a community issued by the agency.
MEAN SEA LEVEL: For purposes of the national flood insurance program, the national geodetic vertical datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.
NEW CONSTRUCTION: For the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.
NEW MANUFACTURED HOME PARK OR SUBDIVISION: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community.
RECREATIONAL VEHICLE: A vehicle which is:
REGULATORY FLOODWAY: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
SPECIAL FLOOD HAZARD AREA: See definition of Area Of Special Flood Hazard.
SPECIAL HAZARD AREA: An area having special flood, mudslide (i.e., mudflow), or flood related erosion hazards, and shown on an FHBM or FIRM as zone A, AO, A1-30, AE, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, A99, AH, VO, V1-30, VE, V, M, or E.
START OF CONSTRUCTION: For other than new construction or substantial improvements under the coastal barrier resources act (Pub. L. 97-348), includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STRUCTURE: For floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally aboveground, as well as a manufactured home. Structure, for insurance purposes, means:
SUBSTANTIAL DAMAGE: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT: Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include either:
VARIANCE: A grant of relief by a community from the terms of a floodplain management regulation.
VIOLATION: The failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) is presumed to be in violation until such time as that documentation is provided.WATER SURFACE ELEVATION: The height, in relation to the national geodetic vertical datum (NGVD) of 1929 (or other datum, where specified), of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
This title shall apply to all areas of special flood hazard within the jurisdiction of Nibley City.
The areas of special flood hazard identified by the federal emergency management agency in a scientific and engineering report entitled, "The Flood Insurance Study For Nibley City" dated May 9, 2023, with accompanying flood insurance rate maps and flood boundary-floodway maps (FIRM and FBFM) and any revisions thereto are hereby adopted by reference and declared to be a part of this title.
A development permit shall be required to ensure conformance with the provisions of this title.
No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this title and other applicable regulations.
This title is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this title and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
The degree of flood protection required by this title is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. On rare occasions greater floods can and will occur and flood heights may be increased by manmade or natural causes. This title does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This title shall not create liability on the part of the community or any official or employee thereof for any flood damages that result from reliance on this title or any administrative decision lawfully made thereunder.
Flood Insurance Rate Maps and Flood Boundary-Floodway Maps (FIRM and FBFM) and any revisions thereto are hereby adopted by reference and declared to be a part of this ordinance.
In all areas of special flood hazards where base flood elevation data has been provided as set forth in: a) NCC 23.06.020, b) NCC 23.08.010(B,8), or c) NCC 23.10.030(C), the following provisions are required:
Violation of the provisions of this title by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Any person who violates this title or fails to comply with any of its requirements shall upon conviction thereof be guilty of a class C misdemeanor, for each violation, and in addition shall pay all costs and expenses involved in the case. Nothing herein contained shall prevent Nibley City from taking such other lawful action as is necessary to prevent or remedy any violation.
If any section, provision, or portion of this ordinance is adjudged unconstitutional or invalid by a court, the remainder of the ordinance shall not be affected.
It is hereby found and declared by Nibley City that severe flooding has occurred in the past within its jurisdiction and will certainly occur within the future; that flooding is likely to result in infliction of serious personal injury or death, and is likely to result in substantial injury or destruction of property within its jurisdiction; in order to effectively comply with minimum standards for coverage under the National Flood Insurance Program; and in order to effectively remedy the situation described herein, it is necessary that this ordinance become effective immediately. Therefore, an emergency is hereby declared to exist, and this ordinance, being necessary for the immediate preservation of the public peace, health and safety, shall be in full force and effect from and after its passage and approval.
Control
The legislature of the state of Utah has in Utah Code §§ 10-3-701 and 17-53-201 delegated the responsibility of local governmental units to adopt regulations designed to minimize flood losses. Therefore, the city council of Nibley City, Utah, does ordain as follows:
Nibley City elects to comply with the requirements of the national flood insurance act of 1968 (PL 90-488, as amended). The national flood insurance program, established in the aforesaid act, provides that areas of the town having a special flood hazard be identified by the federal emergency management agency and that floodplain management measures be applied in such flood hazard areas. The national flood insurance program was broadened and modified with the passage of the flood disaster protection act of 1973 and other legislative measures. It was further modified by the national flood insurance reform act of 1994. The national flood insurance program is administered by the federal emergency management agency, a component of the U.S. department of homeland security.
Unless specifically defined below, words or phrases used in this title shall be interpreted to give them the meaning they have in common usage and to give this title its most reasonable application:
AREA OF FUTURE CONDITIONS FLOOD HAZARD: The land area that would be inundated by the one percent (1%) annual chance (100-year) flood based on future conditions hydrology.
AREA OF SHALLOW FLOODING: A designated AO, AH, AR/AO, AR/Aft or VO zone on a community's flood insurance rate map (FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth of one to three feet (3') where a clearly defined channel does not exist, where the path of flooding is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
AREA OF SPECIAL FLOOD HAZARD: The land in the floodplain within a community subject to a one percent (1%) or greater chance of flooding in any given year. The area may be designated as zone A on the FHBM. After detailed ratemaking has been completed in preparation for publication of the flood insurance rate map, zone A usually is refined into zones A, AO, AE-1, A1-30, AE, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, VO, or V1-30, VE, or V. For purposes of these regulations, the term "special flood hazard area" is synonymous in meaning with the phrase "area of special flood hazard".
AREA OF SPECIAL FLOOD RELATED EROSION HAZARD: The land within a community which is most likely to be subject to severe flood related erosion losses. The area may be designated as zone E on the flood hazard boundary map (FHBM). After the detailed evaluation of the special flood related erosion hazard area; in preparation for publication of the FIRM, zone E may be further refined.
BASE FLOOD: The flood having a one percent (1%) chance of being equaled or exceeded in any given year.
BASE FLOOD ELEVATION (BFE): The water surface elevation of the one percent (1%) annual chance flood. The height in relation to mean sea level expected to be reached by the waters of the base flood at pertinent points in the floodplains of coastal and riverine areas.
BASEMENT: Any area of the building having its floor subgrade (below ground level) on all sides.
BREAKAWAY WALL: A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces, without causing damage to the elevated portion of the building or supporting foundation system.
BUILDING: See definition of Structure.
DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials.
EROSION: The process of the gradual wearing away of land masses. This peril is not per se covered under the program.
EXISTING CONSTRUCTION: For the purposes of determining rates, structures for which the "start of construction" commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. "Existing construction" may also be referred to as "existing structures".
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community.
EXISTING STRUCTURES: See definition of Existing Construction.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufacturing homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
FLOOD ELEVATION DETERMINATION: A determination by the administrator of the water surface elevations of the base flood, that is, the flood level that has a one percent (1%) or greater chance of occurrence in any given year.
FLOOD INSURANCE RATE MAP (FIRM): An official map of a community, on which the administrator has delineated both the special hazard areas and the risk premium zones applicable to the community.
FLOOD INSURANCE STUDY OR FLOOD ELEVATION STUDY: An examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) and/or flood related erosion hazards.
FLOOD OR FLOODING:
FLOODPLAIN OR FLOOD PRONE AREA: Any land area susceptible to being inundated by water from any source (see definition of Flood Or Flooding).
FLOODPROOFING: Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
FLOODWAY: See definition of Regulatory Floodway.
FLOODWAY ENCROACHMENT LINES: The lines marking the limits of floodways on federal, state and local floodplain maps.
FREEBOARD: A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
FUNCTIONALLY DEPENDENT USE: A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and shipbuilding and ship repair facilities, but does not include long term storage or related manufacturing facilities.
HIGHEST ADJACENT GRADE: The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
HISTORIC STRUCTURE: Any structure that is:
LEVEE: A manmade structure usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control, or divert the flow of water so as to provide protection from temporary flooding.
LEVEE SYSTEM: A flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.
LOWEST FLOOR: The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of section 60.3 of the national flood insurance program regulations.
MANUFACTURED HOME: A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" does not include a "recreational vehicle".
MANUFACTURED HOME PARK OR SUBDIVISION: A parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale.
MAP: The flood hazard boundary map (FHBM) or the flood insurance rate map (FIRM) for a community issued by the agency.
MEAN SEA LEVEL: For purposes of the national flood insurance program, the national geodetic vertical datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community's flood insurance rate map are referenced.
NEW CONSTRUCTION: For the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.
NEW MANUFACTURED HOME PARK OR SUBDIVISION: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community.
RECREATIONAL VEHICLE: A vehicle which is:
REGULATORY FLOODWAY: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
SPECIAL FLOOD HAZARD AREA: See definition of Area Of Special Flood Hazard.
SPECIAL HAZARD AREA: An area having special flood, mudslide (i.e., mudflow), or flood related erosion hazards, and shown on an FHBM or FIRM as zone A, AO, A1-30, AE, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, A99, AH, VO, V1-30, VE, V, M, or E.
START OF CONSTRUCTION: For other than new construction or substantial improvements under the coastal barrier resources act (Pub. L. 97-348), includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
STRUCTURE: For floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally aboveground, as well as a manufactured home. Structure, for insurance purposes, means:
SUBSTANTIAL DAMAGE: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT: Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include either:
VARIANCE: A grant of relief by a community from the terms of a floodplain management regulation.
VIOLATION: The failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) is presumed to be in violation until such time as that documentation is provided.WATER SURFACE ELEVATION: The height, in relation to the national geodetic vertical datum (NGVD) of 1929 (or other datum, where specified), of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
This title shall apply to all areas of special flood hazard within the jurisdiction of Nibley City.
The areas of special flood hazard identified by the federal emergency management agency in a scientific and engineering report entitled, "The Flood Insurance Study For Nibley City" dated May 9, 2023, with accompanying flood insurance rate maps and flood boundary-floodway maps (FIRM and FBFM) and any revisions thereto are hereby adopted by reference and declared to be a part of this title.
A development permit shall be required to ensure conformance with the provisions of this title.
No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this title and other applicable regulations.
This title is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this title and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
The degree of flood protection required by this title is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. On rare occasions greater floods can and will occur and flood heights may be increased by manmade or natural causes. This title does not imply that land outside the areas of special flood hazards or uses permitted within such areas will be free from flooding or flood damages. This title shall not create liability on the part of the community or any official or employee thereof for any flood damages that result from reliance on this title or any administrative decision lawfully made thereunder.
Flood Insurance Rate Maps and Flood Boundary-Floodway Maps (FIRM and FBFM) and any revisions thereto are hereby adopted by reference and declared to be a part of this ordinance.
In all areas of special flood hazards where base flood elevation data has been provided as set forth in: a) NCC 23.06.020, b) NCC 23.08.010(B,8), or c) NCC 23.10.030(C), the following provisions are required:
Violation of the provisions of this title by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Any person who violates this title or fails to comply with any of its requirements shall upon conviction thereof be guilty of a class C misdemeanor, for each violation, and in addition shall pay all costs and expenses involved in the case. Nothing herein contained shall prevent Nibley City from taking such other lawful action as is necessary to prevent or remedy any violation.
If any section, provision, or portion of this ordinance is adjudged unconstitutional or invalid by a court, the remainder of the ordinance shall not be affected.
It is hereby found and declared by Nibley City that severe flooding has occurred in the past within its jurisdiction and will certainly occur within the future; that flooding is likely to result in infliction of serious personal injury or death, and is likely to result in substantial injury or destruction of property within its jurisdiction; in order to effectively comply with minimum standards for coverage under the National Flood Insurance Program; and in order to effectively remedy the situation described herein, it is necessary that this ordinance become effective immediately. Therefore, an emergency is hereby declared to exist, and this ordinance, being necessary for the immediate preservation of the public peace, health and safety, shall be in full force and effect from and after its passage and approval.