- DEVELOPMENT REVIEW






The purpose of this article is to establish and describe the types of procedures involved in obtaining development approval. This article establishes the requirements for each type of development approval, beginning with general procedures, which are applicable to all levels of approval and followed by specific procedures that are applicable to each process. This article is applicable to all applications for development approval that are initiated subsequent to the effective date of these LDRs.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
After an application for development approval is determined to be complete and technically competent, if a site plan is required under the provisions of subsection 3-206A, the development review committee (DRC) shall review the application in accordance with the procedures adopted by the DRC and any procedures applicable to the application for development approval. The zoning administrator will coordinate the DRC review, assist in the resolution of conflicts and inform the applicant of any changes that need to be made to the applications to allow further review of the application to proceed. The following shall be required to be submitted with an application for site plan approval:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Any use listed as a permitted use in a zoning district may be permitted subject to obtaining a building permit and site plan approval, business tax receipt and certificate of use, as may be required by these LDRs.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Permit required.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Certain buildings, structures, improvements and installations are exempted by the Florida Building Code from building permit issuance, but must otherwise comply with the minimum requirements of this chapter. Therefore, such buildings, structures, improvements and installations shall be subject to review under the Zoning Improvement Permit (ZIP) standards contained in this section, as well as the regulations of the underlying zoning district and other applicable provisions of these LDRs.
The following buildings, structures, improvements and installations shall require a ZIP from the community planning and development department:
The community planning and development director shall have the authority to require ZIP review for other buildings, structures, improvements and installations that are newly created or come about by changes in the state or local building codes.
In the event any portion of the subject property is contiguous to or across the street from a municipal boundary, applicant shall submit a boundary survey performed in accordance with section 5J-17.051, Florida Administration Code.
The submittal of plans shall be necessary to fully advise and acquaint the issuing department with the location and use of the buildings, structures, improvements and installations, and such plans must accompany the application for a ZIP. The Miami-Dade County’s environmental resources management and fire rescue departments shall review the submitted plans only to the extent of their respective jurisdiction under the Code of Miami-Dade County. In the event there is a question as to the legality of a use, the community planning and development director may require affidavits and such other information as may be deemed appropriate or necessary to establish the legality of the use, before a ZIP permit is issued.
Where a lot extends through from one (1) street to another, the setback requirement for each such street shall be complied with and any building shall have dual facing. Lots which have a decorative wall as defined in section 5-1209 along the rear property line as required by plat shall not be considered through lots.
A certificate of occupancy (CO) is required for all new construction. A CO can be issued by the building official after all applicable final inspections are approved, all required documents are filed with the building official and all applicable fees are paid.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
A certificate of completion (CC) is required for all substantial remodeling, renovations and rehabilitations without any change in use. A CC can be issued after all applicable final inspections are approved, all required documents are filed with the building services department and all applicable fees, and code enforcement fines are paid.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1324, § 1, 12-3-11; Ord. No. 1381, § 1, 10-14-14)
If an application for conditional use permit, special exceptions, variances, appeals, text amendments to the LDRs and/or zoning map amendments, comprehensive plan text and/or map amendments, and abandonment and vacation of right-of-ways and easements, is denied by the city council or the board of adjustment, another similar request on the same property or portions thereof shall not be accepted within a one (1) year period, unless the city council or the board of adjustment specifies that the denial of the application is made without prejudice, or if the city council or the board of adjustment makes a determination that significant new material or facts are present, which justify reconsideration of the application and thereby grants specific approval for refiling of the application, then said one (1) year waiting period may be waived.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1284, § 1, 10-27-09; Ord. No. 1323, § 1, 11-8-11; Ord. No. 1332, § 1, 4-24-12)
(Ord. No. 1495, § 2, 10-25-22)
The intent of this section is to establish procedures to ensure procedural due process and maintain citizen access to the local government decision-making process relating to the approval of applications requiring quasi-judicial and legislative hearings. This policy shall be applied and interpreted in a manner recognizing both the legislative and judicial aspects of the local government decision-making process relating to site-specific parcels. The procedures set out in this division shall be applicable to all public hearings required by any provision of these LDRs.(Ord. No. 1278, § 1(exh. 1), 4-28-09)
In every case where a public hearing is required pursuant to these LDRs, city staff shall provide a notice of public hearing in the manner set out in this section.
Notice of (Type) Change The City of North Miami proposes to adopt the following ordinance or approve the following application: (title of ordinance or description of application). A public hearing on the ordinance or application will be held on (date) at (time) at (location). The proposed ordinance or application materials are available for inspection at the office of community planning and development department during normal business hours. Interested parties may appear at the meeting and will be given the opportunity to be heard on the matter. |
[NAME OF DECISION-MAKING BODY] NOTICE OF PUBLIC HEARING PHONE: _____ HEARING DATE: _____ HEARING TIME: _____ HEARING NO.: _____ ACTION REQUESTED: _____ ADDRESS: _____ |
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1440, § 2, 6-25-19)
In addition to the application for a conditional use permit, the following items shall be submitted for review and approval:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
An application for conditional use approval shall be made in writing upon an application form approved by city staff, and shall be accompanied by applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The planning commission shall review the application for conditional use, the recommendation and report of city staff and the standards for conditional uses in section 3-405. The planning commission may attach such conditions to the approval of the conditional use that are necessary to ensure compliance with the standards in section 3-405 in furtherance of protecting the public health, safety and general welfare. The planning commission, after reviewing the reports and application as well as hearing testimony at the public hearing, shall make a recommendation for approval, approval with conditions or denial. If the planning commission determines that additional information is needed in order to make a decision, it may continue the item for receipt of such information and further review.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council shall review the application, the recommendation of the planning commission and city staff and shall conduct a quasi-judicial public hearing on the proposed conditional use request. The city council, at the conclusion of the public hearing, shall render a decision on the conditional use to either approve, approve with conditions or deny the proposed conditional use. If the city council determines that additional information is needed in order to make a decision, it may continue the item for receipt of such information and further review. The city council shall set forth its findings in writing.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Approval of a conditional use shall be deemed to authorize only the particular use(s) for which it is issued and shall entitle the recipient to apply for a building permit or any other approval that may be required by these LDRs, the city or regional, state or federal agencies. Within one (1) year after approval of a planned development conditional use approval, a precise plan shall be filed denoting overall development as approved by the city council and all permits which are issued for the conditional use shall be in accordance with the provisions of the precise plan. If a precise plan is not filed within one (1) year, the conditional use approval shall be null and void.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1382, § 1, 1-27-15)
Unless otherwise specified in the approval, an application for a building permit shall be made within one (1) year of the date of the conditional use approval. An extension of time may be granted by the community planning and development director for a period not to exceed six (6) months and only within the original period of validity.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
An application for special exception approval shall be made in writing upon an application form approved by the city, accompanied by a site plan and other information required and applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Applications for special exceptions shall demonstrate compliance with the following standards:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The board of adjustment shall review the application for special exception, the recommendation and report of city staff and the standards for special exception in section 3-504. The board of adjustment shall conduct a quasi-judicial public hearing on the application and may attach such conditions to the approval of the special exception that are necessary to ensure compliance with the standards in section 3-504 in furtherance of protecting the public health, safety and general welfare. The board of adjustment, after reviewing the reports and application as well as hearing testimony at the public hearing, shall approve, approve with conditions or deny the application. If the board determines that additional information is needed in order to make a decision, it may continue the item for receipt of such information and further review.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Editor's note— Ord. No. 1321, § 1, adopted September 27, 2011, repealed the former section 3-506 in its entirety, which pertained to appeal to city council and derived from Ord. No. 1278, § 1(exh. 1), adopted April 28, 2009. Subsequently, Ord. No. 1321 redesignated the former sections 3-507—3-510 as sections 3-506—3-509. The historical notation has been preserved for reference purposes.
Approval of a special exception shall be deemed to authorize only the particular use for which it is issued and shall entitle the recipient to apply for a building permit or any other approval that may be required by these LDRs, the city or regional, state or federal agencies.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Note— See editor's note at section 3-505.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Note— See editor’s note at section 3-506.
Unless otherwise specified in the approval, an application for a business tax receipt or building permit necessary to establish such use shall be made within one (1) year of the date of the special exception approval. An extension of time may be granted by the community planning and development department for a period not to exceed six (6) months, and only if requested within the original period of validity.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Note— See editor’s note at section 3-505.
The purpose of this division is to establish a procedure for reviewing and granting variances from the literal terms of these LDRs where there are practical difficulties or unnecessary and undue hardships so that the spirit of these regulations shall be observed, public safety and welfare secured, and substantial justice done. No variances may be granted to permit a use not listed as a permitted use in the applicable zoning district and/or to permit a prohibited use.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
An application for a variance shall be made in writing upon an application form approved by the city staff, accompanied by such other information as required by the city and by applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)

(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The board of adjustment shall review an application for all variances which are not administrative, the report, recommendation and proposed findings prepared by city staff, and conduct a quasi-judicial public hearing on the application in accordance with the requirements of section 3-303 and render a decision. The decision shall be based upon written findings of fact and the board of adjustment shall either grant, grant with conditions or deny the variance.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Any variance granted under the provisions of this division shall become null and void and of no effect twelve (12) months from and after the date of approval, unless within such period of twelve (12) months a building permit is issued if required; or if no permit is required, unless the requested action permitted by the variance shall have taken place within the twelve (12)-month period. An extension of six (6) months may be granted by the community planning and development director for good cause.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Approval of a variance shall be deemed to authorize only the particular use for which it is issued and shall entitle the recipient to apply for a building permit or any other approval that may be required by these LDRs, the city or regional, state or federal agencies.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Editor's note— Ord. No. 1321, § 1, adopted September 27, 2011, changed the title of section 3-609 from “Appeals of board of adjustment decision to city council” to “Appeals from board of adjustment.” The historical notation has been preserved for reference purposes.
The purpose of this division is to set forth procedures for appealing the decisions of city staff and other boards, where it is alleged that there is an error in any order, requirement, decision or interpretation made in the enforcement or interpretation of these LDRs. An action by any administrative official, development review committee, or any board made pursuant to the provisions the LDRs may be appealed to the zoning appeals board in accordance with the provisions of this article.
An appeal of the decision of the administrative official, development review committee, or any board within the scope of these LDRs may be made within 30 days from the date such decision is filed with the clerk of that official or board. If filed, an appeal stays any further action on the permit until final resolution of the appeal, unless the administrative official, development review committee, or any board whose action is the subject of the appeal, certifies in writing that the stay poses an imminent peril to life or property, except that staff may review plans filed in furtherance of such approval appealed as long as no final action is taken to issue the permit allowed by the decision on appeal.
Any appealable decision may be appealed by an applicant, the city, or any aggrieved party, including affected neighborhood, community and civic associations, whose name appears in the record of the official or board from which the appeal is made, by filing with the community planning and development department a petition in a form prescribed by the city.
Appealable decisions include the following, but are not limited to:
An application for appeal must be filed with the city manager or designee and the body, office or department whose action is the basis for appeal, along with a fee for the processing of the appeal. The application shall be on a form provided by the city and include a written statement specifying in brief, concise language the grounds and reasons for requesting a reversal of the ruling made by the lower official or board. Such reasons for the appeal shall be based upon the evidence presented prior to the original decision. Failure of the appellant to present such reasons shall be deemed cause for denial of the appeal.
Within forty-five (45) working days of receipt of a complete appeal application, the city manager or designee shall schedule a public hearing before the zoning appeals board.
The public hearing on the appeal shall be noticed as required by Sec. 3-302. The notice shall state that an appeal has been filed; describe the order being appealed; describe the lot, parcel, property or areas that are the subject of the appeal; describe the final decision on the original request; and note other pertinent information, as may be determined by the director of community planning and development.
The decision of the zoning appeals board on an appeal shall be effective immediately.
Any persons aggrieved by a decision of the zoning appeals board may appeal by petition for writ of certiorari to a court of competent jurisdiction for judicial relief within thirty (30) days after a decision by the zoning appeals board is filed with the clerk of that board. The election of remedies shall lie with the appellant.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1321, § 1, 9-27-11)
Editor’s note— Ord. No. 1321, § 1, adopted September 27, 2011, repealed the former section 3-703 in its entirety, which pertained to appeals from decisions of the board of adjustment, and derived from Ord. No. 1278, § 1(exh. 1), adopted April 28, 2009. Subsequently, Ord. No. 1321 redesignated the former section 3-704 as section 3-703. The historical notation has been preserved for reference purposes.
The purpose of this division is to provide application and review procedures for the subdivision of land within the city. This division shall be applicable to any subdivision or re-subdivision of land that creates one (1) or more parcels. No building permit shall be issued for construction of any improvements on a parcel that was not legally created in compliance with these LDRs.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Whenever land is subdivided a plat must be recorded, except that the recording of a plat will not be required if:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1545, § 2, 3-10-26)
The city shall withhold all public improvement of whatsoever nature, including the maintenance of streets and the furnishing of sewage facilities and water service from all subdivisions which have not been approved, and from all areas dedicated to the public which have not been accepted, in the manner prescribed herein.
Prior to the granting of the final plat approval, the subdivider shall have installed or shall have furnished adequate bond, as provided for herein this article, the amount equal to 110 percent of the cost of improvements for the ultimate installation of the following:
In lieu of immediate construction of improvements, the subdivider may file with the city a cash bond or letter of credit for 110 percent of the work with the required fees in an amount approved by the city’s department of public works, a company approved by the city to insure the city the actual satisfactory completion of construction of proposed improvements within a period of not more than one year from the date of such bond. The bond for the installation of sidewalks may be a separate bond. Provisions shall be made for extension of all such bonds, such extension to be commensurate with the progress of the development. Provisions shall also be made for reduction of such bonds, such reduction to be commensurate with the percentage of improvements constructed in the subdivision concerned. This bond shall also include a maintenance provision for two years covering drainage and for one year covering all other improvements by the subdivider. The amount to be included for maintenance shall be outlined in the county’s public works construction manual. Bonds shall be subject to cancellation, reduction or renewal only by the city upon written certification of the city’s public works department.
The owner or developer of a tract may prepare a master plan for that entire tract and then may submit a tentative and final plat for only a portion of the tract. No construction of subdivision improvements shall be started until construction plans for the entire area covered by the final plat have been approved. Except as otherwise provided in these LDRs, improvements must be installed for all of that area for which a final plat is submitted before building permits will be issued. In such cases of partial subdivision of a tract, the street system, drainage systems, trunk sewers and sewage treatment plants and water plants shall be designed and built to serve the entire area, or designed and built in such a manner as to be easily expanded or extended to service the entire area.
Variances from the provisions of this article are subject to the rules and procedures for the granting of variances as set forth in these LDRs.
In the event the city's regulations provide, or are of a higher standards of subdivision regulations than those provided by the county, as have been adopted in accordance with law, the city's standards shall be noticed to the county public works department, and those higher standards shall be enforced as a supplement to chapter 28 of the Miami-Dade Code and by the county departments concerned.
Street type designations will be approved or assigned by the community planning and development department. Street names submitted for review must include street type designations and must be evaluated. If meeting the criteria for street types, they will be approved. Street types appearing on tentative, final check subdivision plats, site plans, or the subdivision record plats, which do not meet criteria shall be noted for change by the developer/design engineer and approvals will be withheld until such changes are implemented. The following are the criteria for street type designation assignment or approval:
NOTICE OF STREET NAME CHANGE Public notice is hereby given that the City Council of the City of North Miami, Florida has enacted a resolution changing the name of ____________/____________/____________ to ____________/____________/____________. This name change is effective immediately and has been duly recorded with the United States Postal Service. |
Numbers on buildings shall conform to the following specifications.
The community planning and development department director shall have the authority to change the numbering of any existing or new address upon determining that such change is a necessity based on health, safety, and welfare of the citizenry. The community planning and development department director shall determine appropriate new address numbers to supplant those to be changed. The community planning and development director shall notify the owners of the property by mail as to the impending change. In all cases, changes shall become effective not less than 60 days subsequent to the notification letter mailing date. The community planning and development director shall coordinate notification of changes with appropriate county agencies and the United States Postal Service.
It shall be the duty of the owner of any dwelling unit, building or place of business to which a number has been assigned, to display such number in numeral form in accordance with the following standards:
The purpose of this division is to establish a uniform procedure for the abandonment of real property interests of the city. This division applies to city streets, alleys, sidewalks, easements and other fee or non-fee property interests of similar character.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1329, § 1, 4-10-12)
A property owner whose property abuts a public right-of-way or alleyway may apply to the city for the abandonment, in whole or in part, of the abutting right-of-way or alleyway. The fee simple right-of-way or alleyway to be abandoned shall be appraised by an independent appraiser to determine the fair market value.
The applicant is required to pay a cost recovery fee for the independent appraisal. Once appraised the applicant will have the option to purchase the property for no less than ninety (90) percent of the appraised value of said lands in accordance with article 1, section 3 of the City Charter. All requests for abandonment of city streets, alleys, sidewalks, easements and other fee or non-fee interests which the city may have in real property shall be made in writing upon an application form approved by city staff and shall be accompanied by applicable fees, and shall be filed with the community planning and development department.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1329, § 1, 4-10-12)
Editor’s note— Ord. No. 1329, § 1, adopted April 10, 2012, changed the title of section 3-902 from “Application” to “Application and fees.” The historical notation has been preserved for reference purposes.
Applications for vacation or abandonment of city streets, alleys, sidewalks, easements and other fee or non-fee interests which the city may have in real property shall be approved provided that it is demonstrated that:
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1329, § 1, 4-10-12)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The planning commission shall:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council shall review the application at one (1) public hearing. At the public hearing, the city council shall:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The purpose of this division is to establish a uniform procedure for zoning map changes and for text amendments to these LDRs. This division applies to all such changes and amendments, whether initiated by the city or by one (1) or more private property owners.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
All applications for district boundary changes or text amendments to these LDRs shall be made in writing upon an application form approved by the city, and shall be accompanied by applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Consideration of text amendments to these LDRs shall include consideration of the following factors:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The planning commission shall:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The purpose of this division is to establish a uniform procedure for amending the text and maps of the comprehensive land use plan. This division does not supersede the requirements of F.S. Ch. 163, Part II. If any part of this division conflicts with F.S. Ch. 163, Part II, the statutory requirement shall control. This division applies to all text and map amendments to the comprehensive land use plan, whether initiated by the city or by one (1) or more private property owners.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)

B. State coordinated review process. The following plan amendments must follow the state coordinated review process established in F.S. §163.3184 (4):
1. Those based on an evaluation and appraisal pursuant to F.S. §163.3191.
2. Propose development subject to the requirements of F.S. §380.06.

C. Small-scale amendment review process. Plan amendments that qualify as small-scale development amendments are subject to the small-scale review process established in F.S. §163.3187 A small scale development amendment may be adopted if the proposed amendment:
1. Involves a use of ten (10) acres or less;
2. Does not involve a text change to the goals, policies and objectives of the comprehensive land use plan, but only proposes a land use change to the future land use map for a site-specific small scale development activity; however, text changes that relate directly to, and are adopted simultaneously with, the small scale future land use map amendment shall be permissible; and
3. The cumulative annual effect of acreage for all small scale amendments does not exceed one hundred twenty (120) acres.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
All applications for amendments to the text or maps of the comprehensive land use plan shall be made in writing upon an application form approved by city staff and shall be accompanied by applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city shall submit all adopted comprehensive plan and future land use map amendments to DEO, and any other unit of local government or governmental agency that provided timely comments within ten (10) working days after the adoption hearing pursuant to the requirements established in F.S. §163.3184. If the amendment is a small-scale development amendment, the transmittal requirements established herein shall apply.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council may enter into a compliance agreement with DEO with regard to any proposed or adopted comprehensive plan amendment, as follows:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
It is the purpose of this division to provide an administrative remedy for applicants who allege that their vested rights have been abrogated in the event of destruction and/or redevelopment or by a final action of the city. This division sets out a process for obtaining an official and binding determination of vested rights to use or develop property in a particular manner.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council may grant an application for a determination of vested rights if it is demonstrated that:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
Staff review of the application for vested rights shall be conducted pursuant to this division.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council shall review the application at a quasi-judicial public hearing, and shall decide whether the application should be approved, approved with conditions or denied. The city council may continue the matter if it determines it needs more information.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council may enter into development agreements in accordance with the provisions of this division and applicable Florida law to encourage a stronger commitment to comprehensive and capital facilities planning, ensure the provision of adequate public facilities for development, encourage the efficient use of resources, and reduce the economic cost of development. Development agreements shall be required for all developments within the Planned Community Urban Design (PCUD) Overlay District. Development agreements for university campus master plans shall also be subject to the requirements of F.S. §1013.30.
(Ord. No. 1278, § 1(exh. 1), 4-28-09; Ord. No. 1440, § 2, 6-25-19)
All applications for a determination of a development agreement pursuant to this division shall be made in writing upon an application form approved by the director of community planning and development, and shall be accompanied by applicable fees.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The shall review the application for a development agreement with the development review committee in accordance with the applicable provisions of these LDRs, and shall prepare a written recommendation to the planning commission.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The planning commission shall conduct a quasi-judicial public hearing and review the proposed development agreement, the recommendation of staff, and the testimony at the public hearing, the standards for review herein these LDRs and shall issue a recommendation to the city council for approval or denial of the development agreement.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city council shall conduct a quasi-judicial public hearing on the proposed development agreement. Upon conclusion of the public hearing, the council shall review the proposed development agreement, the recommendation of the planning commission, the recommendation of staff and the testimony at the public hearing. The council shall approve, approve with modifications, or deny the proposed development agreement. The council may continue the matter if it determines it needs more information.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
In reaching a decision as to whether or not the development agreement should be approved, approved with modifications, approved with conditions, or denied, the city council shall determine whether the development agreement is consistent with and furthers the goals, policies and objectives of the comprehensive land use plan.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The approved development agreement shall contain, at a minimum, the following:
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
No later than fourteen (14) days after the execution of a development agreement by all parties thereto, the city shall record the development agreement with the Clerk of the Circuit Court in Miami-Dade County. The applicant for a development agreement shall bear the expense of recording the development agreement.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
A development agreement may be amended by mutual consent of the parties, provided the notice and public hearing requirements of these LDRs are followed. A party to a development agreement may request one (1) extension of the duration of the development agreement, not to exceed one (1) year from the date of expiration of the initial term of the development agreement, by submitting an application to the community planning and development department at least sixty (60) days prior to the expiration of the initial term of the agreement. The application shall address the necessity for the extension and shall demonstrate that the extension is warranted under the circumstances. The community planning and development director shall schedule the requested extension as a proposed amendment to the development agreement for public hearing before the planning commission in accordance with division 3 of this article.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
The city manager shall review all lands within the city subject to a development agreement at least once every twelve (12) months to determine if there has been demonstrated good-faith compliance with the terms of the development agreement. The city manager shall make an annual report to the city council as to the results of this review. In the event the city council finds, on the basis of substantial competent evidence, that there has been a failure to comply with the terms of the development agreement, the development agreement may be revoked or modified by the city council upon giving a minimum of a 15-day written notice to the parties named in the development agreement. Such termination of a development agreement shall occur only after compliance with the public hearing and notice requirements of division 3 of this article.
(Ord. No. 1278, § 1(exh. 1), 4-28-09)
This chapter shall be known and may be cited to as the “City of North Miami Impact Fees Ordinance.”
(Ord. No. 1302, § 2, 9-15-10; Ord. No 1531, § 4, 11-26-24)
(Ord. No. 1302, § 3, 9-15-10; Ord. No 1531, § 4, 11-26-24)
This division is intended to impose impact fees, payable at the time of building permit issuance, in order to fund capital improvements, capital facility capacity, and capital equipment needed to address demand for public facilities attributable to new development. This division is not intended to authorize imposition of fees related to capital facility or equipment needs attributable to existing development. This division is intended to allow new development in compliance with the comprehensive plan and to provide a mechanism for new development to help address the burdens created by new development.
(Ord. No. 1302, § 4, 9-15-10; Ord. No 1531, § 4, 11-26-24)
The city council is authorized to establish and adopt an impact fees ordinance pursuant to the authority granted by the Florida Impact Fee Act, F.S. section 163.31801, the Florida Constitution, article VII, sections 1(f), 1(g) and 2(b), the Municipal Home Rule Powers Act, F.S. Ch. 166, as amended, the City of North Miami Charter, and the Community Planning Act, as amended. In addition, the Community Planning Act, as amended, encourages the use of innovative land development regulations, including impact fees. The provisions of this division shall not be construed to limit the power of the city to adopt such ordinance pursuant to any other source of local authority nor to utilize any other methods or powers otherwise available for accomplishing the purposes set forth herein, either in substitution of or in conjunction with these Land Development Regulations ("LDRs").
(Ord. No. 1302, § 5, 9-15-10; Ord. No 1531, § 4, 11-26-24)
For the purpose of this division, the following definitions shall apply unless the context clearly indicates or requires a different meaning:
Applicant shall mean the property owner, or duly designated agent of the property owner, of land on which an application for a building permit is submitted and impact fees are due pursuant to this division, or shall mean the property owner or duly designated agent of the property owner of land identified in a credit agreement pursuant to section 3-1410(D) where such property owner or agent is responsible for the provision of system improvements.
Appropriation shall mean, for purposes of this division, funds identified in the capital budget related to a system improvement.
Capital budget shall mean the city current fiscal year capital budget which is the first year of the five-year capital improvements plan and which identifies capital projects that are proposed to be initiated in that fiscal year or to receive any changes in funding in that fiscal year.
Capital improvement plan (CIP) shall mean the city current five-year program of proposed capital improvements which identifies all capital projects that are proposed to be initiated during the five-year period.
General government facilities shall mean administrative office space, maintenance facilities, and associated land for all city functions except parks and recreation facilities as herein defined, and capital equipment, parking garage space and vehicle fleet for all the departments of the city.
Impact fee shall mean a fee imposed at building permit issuance and calculated based upon a new development’s proportionate share of the average cost of system improvements required to accommodate new development.
Impervious cover shall mean surface areas of a parcel of real property that has been compacted or covered with a layer of material so that it is highly resistant to infiltration by water, excluding such areas within public rights-of-way.
Industrial/warehouseshall mean any of the following:
Multifamily shall mean a building containing two or more dwelling units, excluding single-family attached (townhome) units. It includes duplexes, apartments, and residential condominiums.
New development shall mean the carrying out of any building activity, the making of any material change in the use of a structure or land, the installation of a water meeter, or the making of a connection to the sewer system that generates demand for capital facilities and equipment over and above the previously existing documented use of the development site, but excluding government owned and operated facilities.
Office shall mean a building exclusively containing establishments providing executive, management, administrative, financial, medical or professional services, and which may include ancillary services for office workers, such as a restaurant, coffee shop, newspaper or candy stand, or childcare facilities. It may be the upper floors of a multi-story office building, excluding ground floor retail uses. Typical uses include real estate, insurance, property management, investment, employment, travel, advertising, secretarial, data processing, telephone answering, and telephone marketing offices; medical offices and hospitals, emergency care centers, and veterinary clinics; institutions of higher education; technical or trade schools; music, radio and television recording and broadcasting studios; professional or consulting services in the fields of law, architecture, design, engineering, accounting and similar professions; interior decorating consulting services; and business offices of private companies, utility companies, trade associations, unions and nonprofit organizations. This category does not include an office use within a shopping center or an administrative office that is ancillary to a different primary use of the site.
Parks and recreation facilities shall mean parks and library facilities, related administrative space and maintenance and storage facilities, community centers, swimming pools, gymnasiums, tennis courts, ballfields, and similar recreational improvements and associated land.
Retail/commercial shall mean a shopping center or a free-standing retail or commercial use. A shopping center shall mean an integrated group of commercial establishments planned, developed, owned or managed as a unit. A retail or commercial use shall mean the use of a building or structure primarily for the sale to the public of services, goods, or foods that have not been made, assembled or otherwise changed in ways generally associated with manufacturing or basic food processing in the same building or structure. This category includes, but is not limited to, all uses located in shopping centers and the following typical types of free-standing uses: amusement park, bank, bar, camera shop, car wash, convenience store, department store, discount store, florist shop, golf course or driving range, health or fitness club, hobby, toy and game shop, hotel or motel, laundromat, laundry or dry cleaning, lawn and garden supply store, marina, massage establishment, movie theater, music store, newsstand, racetrack, recreation facility, restaurant, service station, specialty retail shop, used merchandise store, variety store, and vehicle and equipment rental.
Sewer facilities shall mean the city’s sewer collection and conveyance system and associated improvement and land, but excluding gravity lines and force mains less than 16 inches in diameter and associated improvements and land.
Single-family detached/attached shall mean a building containing only one dwelling, or one of multiple units attached on one or both sides to other units and separated by a wall that separates the units from the ground through the roof, also referred to as a townhome.
Stormwater facilities shall mean the city system of flood prevention and mitigation and associated land and improvements, including but not limited to pumps, storm drains, auger wells, catch basins, and french drains.
System improvements shall mean improvements that expand the capacity of a set of improvements for a particular public facility type, if such capacity can be quantified, or otherwise enhance the ability of such systems to provide the same level of service to new development as is currently provided to existing development. System improvements do not include the replacement, repair, rehabilitation, or maintenance of existing facilities.
Water facilities shall mean the city’s water supply, treatment and distribution system, including associated improvements and land, but exculding water lines less than 16 inches in diameter and associated improvements and land.
(Ord. No. 1302, § 6, 9-15-10; Ord. No 1531, § 4, 11-26-24)
This article shall be uniformly applicable to all new development, and the appropriate impact fees shall be collected prior to issuance of a building permit except where a building permit is issued for:
(Ord. No. 1302, § 7, 9-15-10; Ord. No 1531, § 4, 11-26-24)
Impact fees are hereby levied on all new development imposed pursuant to this division, as set forth in the following fee schedules.
A. Parks and recreation impact fee schedule.
| Land Use Type | Unit | Year 1 | Year 2 | Year 3 | Year 4 |
|---|---|---|---|---|---|
| Single Family Det./Att. | Dwelling | $2,937 | $4,112 | $4,993 | $5,874 |
| Multi-Family | Dwelling | $1,986 | $2,780 | $3,375 | $3,971 |
B. General government impact fee schedule.
| Land Use Type | Unit | Year 1 | Year 2 | Year 3 | Year 4 |
|---|---|---|---|---|---|
| Single Family Det./Att. | Dwelling | $1,329 | $1,860 | $2,258 | $2,657 |
| Multi-Family | Dwelling | $919 | $1,287 | $1,562 | $1,838 |
| Retail/Commercial | 1,000 sq. ft. | $2,214 | $3,100 | $3,764 | $4,428 |
| Office | 1,000 sq. ft. | $1,279 | $1,790 | $2,173 | $2,557 |
| Industrial/Warehouse | 1,000 sq. ft. | $201 | $281 | $341 | $401 |
| Public/Institutional | 1,000 sq. ft. | $677 | $948 | $1,151 | $1,354 |
C. Water impact fee schedule.
| Water Meter Size | Meter Type | Year 1 | Year 2 | Year 3 | Year 4 |
|---|---|---|---|---|---|
| 3/4" | Disc | $4,532 | $6,344 | $7,704 | $9,063 |
| 1" | Disc | $7,568 | $10,595 | $12,865 | $15,135 |
| 1.5" | Disc | $15,090 | $21,125 | $25,652 | $30,179 |
| 2" | Disc | $24,153 | $33,814 | $41,059 | $48,305 |
| 1.5" | Turbine | $48,350 | $67,690 | $82,195 | $96,700 |
| 2" | Turbine | $60,404 | $84,565 | $102,686 | $120,807 |
| 3" | Turbine | $135,942 | $190,319 | $231,101 | $271,884 |
| 4" | Turbine | $302,109 | $422,952 | $513,584 | $604,217 |
| 5" | Turbine | $422,916 | $592,082 | $718,956 | $845,831 |
| 6" | Turbine | $604,172 | $845,840 | $1,027,092 | $1,208,343 |
| 8" | Turbine | $1,057,312 | $1,480,236 | $1,797,430 | $2,114,623 |
D. Sewer impact fee schedule.
| Water Meter Size | Meter Type | Fee Per Meter |
|---|---|---|
| 3/4" | Disc | $1,768 |
| 1" | Disc | $2,953 |
| 1.5" | Disc | $5,887 |
| 2" | Disc | $9,423 |
| 1.5" | Turbine | $18,865 |
| 2" | Turbine | $23,567 |
| 3" | Turbine | $53,040 |
| 4" | Turbine | $117,873 |
| 5" | Turbine | $165,007 |
| 6" | Turbine | $235,727 |
| 8" | Turbine | $412,527 |
E. Stormwater impact fee schedule.
Fee per square foot of impervious cover: $0.78
(Ord. No. 1302, § 8, 9-15-10; Res. No. R-2010-103, § 1, 9-28-10; Ord. No. 1409, § 1, 12-13-16; Ord. No 1531, § 4, 11-26-24)
(Ord. No. 1302, § 9, 9-15-10; Ord. No 1531, § 4, 11-26-24)
Expenses to be incurred by the city in connection with the administration of the development impact fee ordinance and the mobility fee ordinance in division 15 of this article have been estimated and budgeted and have been determined to be of benefit to the properties therein and shall be assessed through the imposition of a service charge in the amount of three (3) percent of the impact or mobility fee due. The nonrefundable service charges are in addition to and shall be paid separately from the impact or mobility fees but shall be payable at the time of application for the building permit and shall be for the sole purpose of defraying expenses as provided herein.
(Ord. No. 1302, § 10, 9-15-10; Ord. No 1531, § 4, 11-26-24)
Any request for review of a decision by the zoning appeals board under this article shall be made by filing an appeal within thirty (30) days of such decision being filed with the city clerk, with the circuit court in accordance with the Florida Rules of Appellate Procedure.
This division shall not affect, in any manner, the permissible use of property, density of development, design and improvement standards and requirements or any other aspect of the development of land or provision of public improvements subject to the city comprehensive plan, zoning regulations, subdivisions regulations, or other regulations of the city, all of which shall be operative and remain in full force and effect without limitation with respect to all such development.
The payment of impact fees imposed pursuant to this division is additional and supplemental, and not in substitution, to any other requirements imposed by the city on the development of land or the issuance of building permits. It is intended to be consistent with and to further the objectives and policies of the comprehensive plan, the land development regulations, and to be coordinated with the city’s capital improvement program, and other city policies, ordinances and resolutions by which the city seeks to ensure the provision of public facility improvements in conjunction with the development of land. In no event shall a property owner be required to pay impact fees for the same improvements in an amount in excess of the amount calculated pursuant to this division, provided, however, that a property owner may berequired to provide or pay, pursuant to Miami-Dade County, state and/or city ordinances, policies or regulations, for public facility improvements in addition to payment of impact fees pursuant to this division. Nothing in this division shall be construed as a guarantee of adequate public facilities at the time of development of any particular property.
In the event that the appropriate amount of impact fees due pursuant to this division are not paid prior to the issuance of a building permit, the city may elect to collect the impact fees due by any other method, which is authorized by law.
(Ord. No. 1302, § 16, 9-15-10)
This division shall be known and may be cited to as the “City of North Miami Mobility Fee Ordinance."
(Ord. No. 1530, § 2, 11-26-24)
(Ord. No. 1530, § 2, 11-26-24)
This division is intended to impose mobility fees, payable at the time of building permit issuance, in order to fund mobility projects needed to address person travel demand for mobility projects attributable to development activity. This division is not intended to authorize imposition of fees related to mobility project needs attributable to existing development. This division is intended to allow development activity in compliance with the comprehensive plan and to provide a mechanism for development activity to help address the burdens created by development activity.
(Ord. No. 1530, § 2, 11-26-24)
The city council is authorized to establish and adopt a mobility fee ordinance pursuant to the authority granted by F.S. section 163.3180, the Florida Constitution, article VII, sections 1(f), 1(g) and 2(b), the Municipal Home Rule Powers Act, F.S. Ch. 166, as amended, the City of North Miami Charter, and the Community Planning Act, as amended. In addition, the Community Planning Act, as amended, encourages the use of innovative land development regulations, including mobility fees. The provisions of this division shall not be construed to limit the power of the city to adopt such ordinance pursuant to any other source of local authority nor to utilize any other methods or powers otherwise available for accomplishing the purposes set forth herein, either in substitution of or in conjunction with these Land Development Regulations.
(Ord. No. 1530, § 2, 11-26-24)
The Technical Report includes definitions related to the mobility action plan and mobility fee. For the purpose of this division, the following definitions shall supersede any other mobility related definitions:
Development Activity shall mean new residential and non-residential construction, any new land development or site preparation activity, any new construction of buildings or structures, any modification, reconstruction, redevelopment, or upgrade of buildings or structures, any change of use of a building, land, or structure, and any special exception approval, variance, or special use permit that results in an increase in person travel demand (aka impact) above the demand generated by the existing use of property. Property includes submerged lands.
Mobility shall mean the ability to move people and goods from an origin to a destination by multiple modes of travel in a timely manner based on the speed of travel.
Mobility fee shall mean a monetary exaction imposed on development activity at building permit issuance pursuant to division 15 of this article 3 to fund mobility projects identified in the most recently adopted mobility action plan.
Mobility action plan shall mean the Streets Plan, Multimodal Plan, Transit Plan, Mobility Action Plan Programs included in the City of North Miami 2045 Mobility Action Plan and Mobility Fee Technical report dated October 2024 and prepared by NUE Urban Concepts, LLC that identifies mobility projects within the City to meet future person travel demand between 2024 and 2045 and serves as the basis for the city’s mobility fee. Future updates of the mobility action plan may be referenced as a mobility plan.
Mobility action plan program shall mean mobility programs identified in the mobility action plan in recognition that the mobility action plan is the first part of a multi-part plan to develop and construct mobility projects and implement mobility programs. These mobility programs include a variety of mobility initiatives, plans, services, and studies that the city will undertake as part of implementation of the mobility action plan and expenditure of the mobility fee.
Mobility fee expenses shallmean expenditures for: (a) the repayment of principal and interest or any redemption premium for loans, advances, bonds, bond anticipation notes, and any other form of indebtedness then outstanding consistent with statutory allowances and used to advance mobility projects identified in the Mobility Plan; (b) reasonable administrative and overhead expenses necessary or incidental to expanding and improving mobility projects; (c) crosswalks, traffic control and crossing warning devices, landscape, trees, multimodal way finding, irrigation, hardscape, and lighting related to projects; (d) micromobility devices, microtransit vehicles, programs and services, (e) mobility hubs, transit circulators, water taxis, docks, facilities, programs, shuttles, services, vehicles and vessels; (f) reasonable expenses for engineering studies, stormwater reports, soil borings, tests, surveys, construction plans, and legal and other professional advice or financial analysis relating to projects; (g) the acquisition of right-of-way and easements for the improvements, including the costs incurred in connection with the exercise of eminent domain; (h) the clearance and preparation of any site, including the demolition of structures on the site and relocation of utilities; (i) floodplain compensation, wetland mitigation and stormwater management facilities; (j) all expenses incidental to or connected with the issuance, sale, redemption, retirement, or purchase of bonds, bond anticipation notes, or other forms of indebtedness, including funding of any reserve, redemption, or other fund or account provided for in the ordinance or resolution authorizing such bonds, notes, or other form of indebtedness consistent with statutory allowances and used to advance mobility projects identified in the Mobility Plan; (k) reasonable costs of planning, design, engineering, and construction, including mobilization, maintenance of traffic during construction and CEI (construction engineering and inspection) services of mobility projects, (l) city administration, implementation updates to the mobility plan and mobility fee, including any analysis, assessments, counts, data collection, plans, programs or studies needed for mobility projects, (m), local match for federal, state and county funded projects.
Mobility fee technical report shall mean the City of North Miami 2045 Mobility Action Plan and Mobility Fee Technical Report dated October 2024 and prepared by NUE Urban Concepts, LLC that documents the analysis, data and methodology used to develop a mobility fee and is adopted pursuant to an implementing ordinance which authorizes imposition of the mobility fee.
Mobility project shall mean corridor and intersection improvements such as bike lanes, buffered bike lanes, protected bike lanes, intersections, interchanges, landscape, shared-use paths, trails, greenways, boardwalks, pedestrian overpasses or underpasses, roads, roundabouts, sidewalks, streets, curbless shared streets, green streets, traffic calming, and streetscape. Mobility projects also include policies, programs and services, wayfinding, micromobility devices, and transit vehicles and vessels, lanes, stops, docks, and facilities, along with mobility hubs. Projects can include new or additional road travel lanes and turn lanes, upgrade of roads that results in a change in functionally classification of the road, complete and green streets, curbless shared streets, new or upgraded traffic signals, traffic synchronization, mobilization, maintenance of traffic, survey, geotechnical and engineering, utilities, construction, PD&E, planning, engineering and inspection, utility relocation, right-of-way, easements, land acquisition, stormwater management facilities.
Multimodal shall mean multiple modes of travel including, but not limited to walking, bicycling, jogging, rollerblading, skating, scootering, riding transit, driving a golf cart, low speed electric vehicle or motor vehicle.
Transportation system shall mean the arterial, collector, local, and residential roads and streets within the city and includes city, county, and state facilities, as well as bicycle lanes, boardwalks, buffers, intersections, landscape, lighting, mobility hubs, on-street parking, paths, railways, sidewalks, streetscape, swales, trails, and transit facilities, stops, and stations.
(Ord. No. 1530, § 2, 11-26-24)
This division shall be uniformly applicable to development activity within the city limits for mobility projects identified in the Mobility Action Plan or Capital Improvements Program. It shall not be applicable to any government-owned and operated facility or other uses exempt from impact fees or mobility fees by Florida Statute.
(Ord. No. 1530, § 2, 11-26-24)
| Use Categories, Use Classifications, and Representative Uses | Unit of Measure | Mobility Fee |
|---|---|---|
| Residential Uses | ||
| Residential (Single-Family, Multifamily, Active Adult) | sq. ft. | $2.46 |
| Institutional Uses | ||
| Community Serving (Assembly, Centers, Lodges, Museum, Performance Venues, Religious Institution, Studios) | sq. ft. | $1.62 |
| Long Term Care (Adult Day Care, Assisted Living, Continuum of Care Facility, Skilled Nursing Facility) | sq. ft. | $2.02 |
| Private Education (Afterschool, Child Care or Day Care, K-12, Pre-K, Trade School, Tutor) | sq. ft. | $1.67 |
| Commercial Recreational Uses | ||
| Marina (wet berths, dry slips, ancillary repair, any publicly accessible land uses pay applicable fee per use) | berth, plus per 10 dry slips | $1,462 |
| Recreation / Entertainment, Outdoor (Golf, Multi-Purpose, Sports, Tennis) | acre | $14,082 |
| Recreation / Entertainment, Indoor (Exercise Studio, Fitness, Gym, Health, Indoor Sports, Recreation) | sq. ft. | $7.38 |
| Industrial Uses | ||
| Industrial (Assembly, Development and Testing, Distribution and Processing, Microbrewing, Trades, Utilities) | sq. ft. | $2.29 |
| Commercial Storage (Junk /Salvage Yard, Mini-Warehouse, Outdoor Storage, Recycling / Waste Management, Warehouse) | sq. ft. | $0.92 |
| Office Uses | ||
| Office (Administrative, Business, Professional, Professional School, Higher Education, Hospital) | sq. ft. | $4.57 |
| Medical Office (Clinic, Dental, Health Service, Laboratory, Professional Care, Emergency Care, Rehab, Veterinary) | sq. ft. | $8.31 |
| Retail Uses | ||
| Local Retail (Café, Restaurant, Retail, Sales and Services, Personal Services) | sq. ft. | $3.43 |
| Retail (Discount, Large Scale Retail, Superstore, Sales & Services, Variety Store, Vehicle Sales) | sq. ft. | $7.94 |
| High Impact Retail (Banks, Financial Services, Pharmacy, Sit-Down Restaurants, Supermarket, Wine & Spirits) | sq. ft. | $13.89 |
| Convenience Retail (Convenience Store, Fast Food Restaurant, Motor Vehicle Charging / Fueling) | sq. ft. | $32.56 |
| Non-Residential Uses Per Unit of Measure (All uses are Additive Mobility Fees except overnight lodging) | ||
| Fast Food Drive Thru | lane | $21,181 |
| Financial Service Drive-Thru Lane or Free-Standing ATM | lane / ATM | $16,402 |
| Overnight Lodging (B&B, Hotel, Motel, Transient) | room | $2,868 |
| Vehicle Cleaning (Detailing, Wash, Wax) | lane or stall plus per five (5) stations | $28,818 |
| Vehicle Charging or Fueling (Commercial Facility which requires Payment) | per charging or fueling position | $14,495 |
| Vehicle Repair or Service (Accessories, Brakes, Maintenance, Major, Minor, Quick Lube, Repair, Tires) | bay or stall | $9,978 |
(Ord. No. 1530, § 2, 11-26-24)
(Ord. No. 1530, § 2, 11-26-24)
(Ord. No. 1530, § 2, 11-26-24)
This division shall not affect, in any manner, the permissible use of property, density of development, design and improvement standards and requirements or any other aspect of the development of land or provision of public improvements subject to the city comprehensive plan, zoning regulations, subdivisions regulations, or other regulations of the city, all of which shall be operative and remain in full force and effect without limitation with respect to all such development.
(Ord. No. 1530, § 2, 11-26-24)
The payment of mobility fees imposed pursuant to this division is additional and supplemental, and not in substitution, to any other requirements imposed by the city on the development of land or the issuance of building permits. It is intended to be consistent with and to further the objectives and policies of the comprehensive plan, the land development regulations, and to be coordinated with the city’s capital improvement program, and other city policies, ordinances and resolutions by which the city seeks to ensure the provision of public facility improvements in conjunction with the development of land. In no event shall a property owner be required to pay impact fees for the same improvements in an amount in excess of the amount calculated pursuant to this division, provided, however, that a property owner may be required to provide or pay, pursuant to Miami-Dade County, state and/or city ordinances, policies or regulations, for mobility projects in addition to payment of mobility fees pursuant to this division. Nothing in this division shall be construed as a guarantee of adequate public facilities at the time of development of any particular property.
(Ord. No. 1530, § 2, 11-26-24)
In the event that the appropriate amount of mobility fees due pursuant to this division are not paid prior to the issuance of a building permit or equivalent development order approval, the city may elect to collect the mobility fees due by any other method, which is authorized by law.
(Ord. No. 1530, § 2, 11-26-24)