SUPPLEMENTARY USE REGULATIONS
For the purposes of this section, spacing distances shall be measured from all property lines of any of the uses specified in Paragraph A, above. |
The Zoning Officer shall note on the temporary permit or attach to the permit application, information that demonstrates that the applicant has agreed to or complies with the requirements of this section. The Zoning Officer shall inspect the site as necessary to ensure that the provisions of the permit are adhered to. |
In addition to the yard requirements set forth above, a twenty-five-foot buffer yard shall be provided around the entire perimeter of the development site. The area of this buffer may be included as part of the development's required open space; however, where such buffer is included as part of the required open space, it shall not be included as part of any required lot area. If the area of the buffer is not included as part of the required open space, then the area may be included as part of the required lot area. (See also Paragraph J below.) |
Due consideration shall be given to all applications where irregular topography causes a roof peak line to be greatly exaggerated. |
No permit shall be given for use of an outdoor solid fuel furnace until formal inspection of the installation has occurred and the Township has received the required copy of the unit's owner's manual. |
Lot Size | Maximum Number of Turbines |
|---|---|
Less than 1 acre to 5 acres | 1 turbine |
5+ acres to 10 acres | 2 turbines |
+ 10 acres | 3 turbines |
In addition, applications for oil and gas operations in an identified floodplain in the Township shall meet all State requirements for the protection of waters of the Commonwealth, including any conditions which may be placed on or waivers approved for such application by the PA Department of Environmental Protection as part of the State's permit review process. |
Zoning Classifications for Oil and Gas Operations | ||||||||
|---|---|---|---|---|---|---|---|---|
Districts | ||||||||
Uses | RA | RR | RS | RU | C | IC | I | |
Oil & Gas Operations | P | P* | P* | P* | P | P | P | |
Impoundment Areas | P | P | P | P | P | P | P | |
Nat'l Gas Compressor Stations | P | C | C | C | C | C | P | |
Nat'l Gas Processing Plants | C | — | — | — | — | — | P | |
Water Withdrawal and Water Distribution Facilities** | C | — | — | — | C | C | C | |
Oil & Gas Staging Areas | — | — | — | — | C | C | P | |
* | This use is prohibited in these zones where the well site cannot be placed so that the wellhead is at least 500 feet from any existing building. | |||||||
** | See standards for this use in § 27-449. | |||||||
NOTE: This table is intended to illustrate the zoning classification of oil and gas uses, by zone, in the Township. For a complete listing of uses provided in the Township see the table of uses in Appendix 27-E or the district regulation charts in Part 3 of this chapter. See also § 27-448.A for additional standards governing oil and gas operations. | ||||||||
Key RA - Residential Agriculture; RR - Residential Rural; RS - Residential Suburban; RU - Residential Urban; C - Commercial; IC - Interchange Commercial; and I - Industrial District P - Permitted Uses; C - Conditional Uses | ||||||||
SUPPLEMENTARY USE REGULATIONS
For the purposes of this section, spacing distances shall be measured from all property lines of any of the uses specified in Paragraph A, above. |
The Zoning Officer shall note on the temporary permit or attach to the permit application, information that demonstrates that the applicant has agreed to or complies with the requirements of this section. The Zoning Officer shall inspect the site as necessary to ensure that the provisions of the permit are adhered to. |
In addition to the yard requirements set forth above, a twenty-five-foot buffer yard shall be provided around the entire perimeter of the development site. The area of this buffer may be included as part of the development's required open space; however, where such buffer is included as part of the required open space, it shall not be included as part of any required lot area. If the area of the buffer is not included as part of the required open space, then the area may be included as part of the required lot area. (See also Paragraph J below.) |
Due consideration shall be given to all applications where irregular topography causes a roof peak line to be greatly exaggerated. |
No permit shall be given for use of an outdoor solid fuel furnace until formal inspection of the installation has occurred and the Township has received the required copy of the unit's owner's manual. |
Lot Size | Maximum Number of Turbines |
|---|---|
Less than 1 acre to 5 acres | 1 turbine |
5+ acres to 10 acres | 2 turbines |
+ 10 acres | 3 turbines |
In addition, applications for oil and gas operations in an identified floodplain in the Township shall meet all State requirements for the protection of waters of the Commonwealth, including any conditions which may be placed on or waivers approved for such application by the PA Department of Environmental Protection as part of the State's permit review process. |
Zoning Classifications for Oil and Gas Operations | ||||||||
|---|---|---|---|---|---|---|---|---|
Districts | ||||||||
Uses | RA | RR | RS | RU | C | IC | I | |
Oil & Gas Operations | P | P* | P* | P* | P | P | P | |
Impoundment Areas | P | P | P | P | P | P | P | |
Nat'l Gas Compressor Stations | P | C | C | C | C | C | P | |
Nat'l Gas Processing Plants | C | — | — | — | — | — | P | |
Water Withdrawal and Water Distribution Facilities** | C | — | — | — | C | C | C | |
Oil & Gas Staging Areas | — | — | — | — | C | C | P | |
* | This use is prohibited in these zones where the well site cannot be placed so that the wellhead is at least 500 feet from any existing building. | |||||||
** | See standards for this use in § 27-449. | |||||||
NOTE: This table is intended to illustrate the zoning classification of oil and gas uses, by zone, in the Township. For a complete listing of uses provided in the Township see the table of uses in Appendix 27-E or the district regulation charts in Part 3 of this chapter. See also § 27-448.A for additional standards governing oil and gas operations. | ||||||||
Key RA - Residential Agriculture; RR - Residential Rural; RS - Residential Suburban; RU - Residential Urban; C - Commercial; IC - Interchange Commercial; and I - Industrial District P - Permitted Uses; C - Conditional Uses | ||||||||