Procedure. As determined by the Building Department, building permit applications filed in the Village of Port Washington North may include photographs of the property from the street and photographs of the areas of the lot affected by the proposed construction, clearing and/or grading, if the construction, clearing or grading contains a hillside area as determined by the Building Department. If the Building Department determines that the construction, clearing and/or grading may fall under this article, then a sworn and notarized affidavit signed by the property owner shall be submitted with the application attesting that the parcel is not a steep slope as defined; or if it does, that no part of the proposed work, clearing and/or grading will occur in such areas. In addition to the affidavit from the property owner, the Planning Board and/or Building Department may, at its discretion, request a sworn and notarized affidavit by a licensed surveyor or professional engineer bearing the original seal and attesting that the parcel has no hillside areas or that the proposed construction, clearing and/or grading will not be performed in such areas. The Planning Board/Building Department may also require a topographical survey showing elevations at two-foot intervals. If a field inspection determines that a false statement or misrepresentation has been made, a stop-work order shall be issued and the permit revoked. The applicant will be required to file a new building permit application, pay the requisite fees, and go through the review provided by this article. In all cases, a topographical survey, grading plans with tree clearing limits shown, and any other proof requested by the Village will be required for construction, clearing or grading in hillside areas.