General. All best management practices required to comply with this section shall meet the design criteria, standards and specifications in the latest edition of the Wisconsin Construction Site Best Management Practice Handbook, as published and amended from time to time by the State Department of Natural Resources. In drafting the plan, the applicant shall take into account and indicate on the plan all factors which may affect erosion control on and adjacent to the site and provide a site drawing, drawn to scale, designating the location of the most suitable erosion control devices, so as to prevent sediment runoff to the greatest degree practicable. The plan shall also include a timetable of land disturbing activities, the area involved in each such activity, and the temporary and permanent procedures to be taken to minimize sediment runoff.