Minimum/maximum front yard [i.e., building line/front yard setback]: any new principal building or structure must have minimum and maximum front yard setback that conforms with (i.e., aligns with) the front yard setbacks (i.e., front yard/building line setbacks) of the existing structures on the immediately adjacent lots (or an average thereof).