And Small Scale Developments, Conditional Uses, Planned Mountain Home Developments, Large Scale Industrial Projects, Mines, Utility Transmission Projects, Planned Unit Developments, Condominium Projects, Factory Built Housing Parks, Shopping Centers, Mountain Recreation Developments, Guest Ranches, Resorts, Oil And Gas Wells, Manmade Lakes, And Other Projects
The following large and small scale developments may be authorized within the County, but only in those zoning districts in which the particular development type is specifically listed, as a permitted conditional use.
Type of Development
Zoning Districts in which Authorized
Planned Mountain Home Developments
MR, RFM, PV, SL
Large Scale Industrial Projects
I-1, I-2, M&G, RFM
Underground and Surface Mines
MR, M&G
Utility Transmission & Railroad Projects
All zoning districts except SC, SL, FPO
Planned Unit Developments
RR-5, RR-2.5, RR-1, R-1-20,000, R-1-12,000, R-4-8,000, R-2-8,000 R-1-8,000
Condominium Projects – new & conversion
RR-1, R-1-20,000, R-1-12,000, R-2-8,000, R-4-8,000, R-1-8,000, PV
Twin Homes
R-2-8,000, R-4-8,000
Factory Built Housing Parks
C-1, C-2
Recreational Vehicle Parks
C-1, C-2
Planned Shopping Centers and Malls
C-1, SC-1
Mountain Recreation Developments
PV, RFM, SL
Guest Ranches and Resorts
M&G, HMC
Gas and Oil Wells, exploratory and production
All zoning districts except WS, SL, HMC, R-1-20,000, R-1-12,000, R-4-8,000, R-2-8,000, and R-1-8,000
Manmade Lakes & Reservoirs
RFM, MR, WS, M&G
Hotels, Motels, and Apartments
C-1, C-2
Residential treatment facilities shall be deemed to be permitted uses in all zoning districts in which residences are allowed as permitted uses.
Conditional use permit applications for other conditional uses authorized in particular zoning districts, as set forth elsewhere in the County Development Code, shall be administered according to this Section.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A conditional use is a land use that, because of its unique characteristics or potential impact on the county, surrounding neighbors or adjacent land uses, may be compatible only if certain conditions are required that mitigate or eliminate the detrimental impacts of the land use.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A conditional use permit shall be required for all uses listed as conditional uses in the zone regulations where they are, or will be located, or if the use is specified as a conditional use elsewhere in this Carbon County Land Use Ordinance.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The listing of a conditional use in any table of permitted and conditional uses found at the end of each chapter of this Carbon County Land Use Ordinance for each category of zoning district does not constitute an assurance or presumption that such conditional use will be approved. Rather, each proposed conditional use shall be evaluated on an individual basis, in relation to its compliance with the standards and conditions set forth in this chapter and with the standards for the district in which it is located, in order to determine whether the conditional use is appropriate at the particular location.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Only when the following elements are satisfied is a conditional use application deemed complete:
Plans requiring review by the Planning Commission shall be provided 14 days in advance of the next regularly scheduled meeting of the Planning Commission so that staff can review the materials submitted for completeness and place the item on the agenda for consideration by the Planning Commission.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The zoning administrator shall act as the Land Use Authority with respect to all conditional use permits, except that the Planning Commission shall act as the Land Use Authority as to the following types of conditional use permits:
The zoning administrator may, in his discretion, designate the Planning Commission to consider any matter as the Land Use Authority with respect to any conditional use permit which he would otherwise be permitted to consider under this Ordinance. The zoning administrator shall approve an application within 30 days of its submission; otherwise, the applicant shall have the right to present the application to the Planning Commission for its approval.
When considering an application, the Planning Commission may recommend to the applicant that he revise his application and that the matter be continued prior to a decision being made on the application, but the Planning Commission shall not continue the matter unless the applicant consents to a continuation.
Any applicant may request that a conditional use permit that could otherwise be approved by the Zoning Administrator be considered instead by the Planning Commission, as set forth above.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The land use authority shall approve a conditional use permit if the applicant, after having submitted a completed application, brings forth substantial evidence to show that reasonable conditions can be imposed to mitigate the reasonably anticipated detrimental effects of the proposed use, in accordance with applicable standards in which a conditional use permit is required by the regulations of that zone or elsewhere in these ordinances. If the reasonably anticipated detrimental effects of a proposed conditional use cannot be substantially mitigated by the imposition of reasonable conditions to achieve compliance with applicable standards the conditional use shall be denied. The effects of the proposed use shall include the effects upon adjacent or nearby properties and other nearby land uses, public facilities, and the public welfare. A conditional use permit shall not be issued if the applicant has made a false, misleading or deceptive statement in providing the information required.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The Land Use Authority may presume that the conditions required by any federal or state agency regulating the use for which the application is submitted are comprehensive and sufficient to mitigate all reasonably anticipated detrimental effects of the use.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
If a conditional use permit is granted by the applicable Land Use Authority, the conditional use permit shall be issued in writing and signed by the applicable authority. The permit shall set forth each and every specific condition imposed by the Land Use Authority. The applicant shall also acknowledge the terms and conditions of the permit by signing the same. The permit shall not be effective until it has been signed by both the applicable Land Use Authority and the applicant.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The applicant shall come into compliance with all conditions of the permit within 30 days of the issuance of the permit, or shall be deemed to be in violation thereof. The Planning Commission shall have the right to extend the term by which all conditions of the permit are satisfied if doing so will not materially affect the health and welfare of the general citizenry.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Any party adversely affected by the granting or denial of a conditional use permit by the Land Use Authority may appeal to the Appeal Authority designated within the County Development Code within 30 days of the decision of the Land Use Authority.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Modifications requested by the holder of the permit may be granted if it can be reasonably determined that such changes or modifications are necessary to accommodate special circumstances related to the location, siting, or implementations of the approve site plan and conditions, and such modifications are so insignificant and minor as to not measurably or unreasonably change the approved site plan or intent of the conditions imposed by the conditional use permit. Any modification which would enlarge the area of use, change the use to a different permitted use in the underlying zoning district, add to the number of structures or result in an increase in the number of structures, or otherwise significantly alter the intent of the approved conditions and the character of the neighborhood shall be considered to be a new application.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Unless there is substantial action under a conditional use permit within a period of one year from the date written approval of the conditional use permit is granted, the conditional use permit shall expire. The Planning Commission may grant a maximum extension of time of one year. Upon expiration of any extension of time granted by the Planning Commission, the approval for the conditional use permit shall expire and become null and void.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
When an approved conditional use has been discontinued and/or abandoned for a period of one year, the conditional use permit becomes null and void. In order to restore the conditional use, a new application must be submitted.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A breach, violation or default of the terms of the conditional use permit may result in the revocation of the permit by the Planning Commission. The holder of the permit shall first be given notice of violation in writing, and shall be given 30 days to remedy the violation of the permit. In the event that the violation of the permit materially affects the health and safety of the public, the zoning administrator may in his discretion require that the violation be remedied within a shorter period of time. In the event the violation has not been remedied within 30 days of the notice of the violation, the Planning Commission shall, after giving reasonable notice to the holder of the permit, require the holder of the permit to attend a public meeting and show cause why the permit should not be revoked. Multiple or repeated violations of the terms of the permit shall not require that 30 days’ notice be given prior to a hearing before the Planning Commission, but in all cases the permit holder shall be afforded a hearing before the Planning Commission, and only the Planning Commission shall have the right to revoke the conditional use permit.
After considering the arguments and evidence put forth by the holder of the permit, the Planning Commission shall determine whether the permit will be revoked. The Planning Commission shall revoke the permit if it determines that the holder of the permit is unwilling or unable to abide by the terms and conditions of the permit, and the conditional use shall immediately cease.
HISTORY:
Ord. 491, 1/17/2018
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Planned Mountain Home Developments may be constructed in those zones in which they are specifically listed as a permitted use, subject to compliance with the intent of the zone in which they are situated and the following conditions and procedures:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The minimum acreage required to qualify for a Planned Mountain Home Development shall be eighty (80) acres.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The maximum number of dwelling units within a Planned Mountain Home Development shall be in accordance with the following density schedule:
Zone
Method of sewage disposal
One dwelling per
MR
Sewer
Septic
3.5 acres
4 acres
RFM
Sewer
Septic
3.5 acres
4 acres
PV
Sewer
Septic
4 acres
4 acres
SL
Sewer
Sewer
5 acres
5 acres
Depending on proximity to water sources the Planning Commission may require a decrease in density following a hydrological study of the area.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Same as required under Section 5.15.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Minimum Lot Size
Zone
Central Sewer
Individual Septic System
MR
20,000 square feet
one acre
RFM
20,000 square feet
one acre
PV
12,000 square feet
one acre
SL
12,000 square feet
not allowed
Each lot shall have the following minimum width:
Zone
Central Sewer
Individual Septic System
MR
130 feet
150 feet
RFM
130 feet
150 feet
PV
100 feet
130 feet
SL
100 feet
not allowed
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in all developments, if not existing. Said improvements shall meet minimum County standards and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be in accordance with the provisions in Section 7.
Developers may install other improvements; however, the construction of other improvements shall not be required as a condition of approval of a Planned Mountain Home Development.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
It is the intent of these provisions to permit the construction of major industrial activities under controlled conditions, which will best preserve the quality of life and protect the health, safety and general welfare of the public. These projects may include, but are not limited to manufacturing, fabrication, salvage yards, power plants and similar industrial activities which emit fumes, smoke, noise, vibration, dust, glare or odor in amounts that are discernable beyond the limits of the site.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A narrative description of the proposed project and a site plan drawn to scale of the proposed industrial development shall be submitted. Said plan shall show the following information:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in all developments. Said improvements shall meet minimum County standards and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvement shall be in accordance with the provisions in Section 7.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
It is the intent of this Section to promote and regulate the health, safety, social, economic and environmental impacts to the County from mine developments and to regulate the location, construction, operation and reclamation of lands subjected to mineral extraction activities.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
This section shall apply to all new and expanded existing underground mines. In the case of conflicting provisions, The Utah Division of Oil Gas and Mining shall be considered the County’s expert in determining the proper regulations necessary to protect the land and residents of the County.
The permits required and obtained from the State for the construction and operation of the mine shall be sufficient evidence of compliance with the onsite surface provisions of this section, except for the proper construction of any surface facilities regulated by the State and County Building Codes which shall be constructed in accordance with those adopted building codes.
Carbon County will regulate the off-site improvements and operations in compliance with this section and other County Ordinances.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Major mining developments shall be approved as required under Section 5.15.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this section is to allow the installation of major electric power, petroleum, natural gas and water transmission lines and railroad tracks, while meeting the responsibility to provide for the health, safety and general welfare of the public.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
These provisions shall apply to major utility transmission lines and railroad projects as defined in this Code.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Major Utility Transmission and Railroad Projects shall be approved as required under Section 5.15 except that for electric power transmission lines of less than 138 KV capacity the approval procedure shall be as set forth under Section 3.3.32.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Change of Official Map. The County shall add the project to the Official Map of the County, after the project receives final approval from the Legislative Body.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this section is to establish guidelines dealing specifically with design, construction and operation of planned unit developments.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The maximum number of dwelling units within a Planned Unit Development shall be in accordance with the following density schedule:
Zone
Min. Area in Development (In Acres)
Method of Sewage Disposal
Maximum Number of Dwelling Units per Acre
RR-5
10
Septic
Sewer
1
1.25
RR-2.5
5
Septic
Sewer
1
1.25
RR-1
5
Septic
Sewer
1
1.5
R-1-20,000
2
Sewer
2.5
R-1-12,000
2
Sewer
2.5
R-1-8,000
2
Sewer
5.5
R-2-8,000
2
Sewer
7.0
R-4-8,000
2
Sewer
8.5
The proposed plan shall include all potentially developable property or shall be designed to permit the extension of the development into those areas not included within the original plan.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Planed Unit Developments shall be approved as required under Section 5.15 of this Code.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The layout and design of all planned unit developments, and the content of all required plats, engineering plans and other required submissions, shall be prepared in accordance with minimum County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Satisfactory evidence of an entitlement to a firm and uninterruptible right to the use of culinary and fire water, from a recognized water supply agency for each lot or unit in the development, shall be submitted with each application as follows:
Written approval by the Price River Water Improvement District or other recognized water supply entity, indicating:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in all Planned Unit Developments, if not existing. Said improvements shall meet minimum County standards and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period of up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be in accordance with the provisions in Section 7.
Developers may install other improvements; however, the construction of other improvements shall not be required as a condition of approval of a planned unit development.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the developer for each development. All documents shall be prepared in accordance with County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Where the development is being developed for sale as a condominium the plans and documents shall also comply with the provisions of Section 5.7, and the approval process may be combined.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this section is to establish guidelines dealing specifically with design, construction and operation of proposed new condominium projects. These provisions shall be supplemental and in addition to the general requirements for large scale developments contained under Section 5.1 of this Code, and also the requirements of the Utah Code Annotated, 1953, as amended.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses permitted within a condominium project shall be limited to those uses specifically permitted within the zone that underlies the area of the project.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Where the proposed condominium project consists of a use or structure that is authorized as a use-by-right within the zone, said use or structure shall comply to all applicable requirements of the underlying zone.
Where the proposed condominium project is to be developed under the provisions relating to a planned unit development, planned shopping center, or similar Planned Development, all uses or structures shall comply with the plans for such project as approved by the County.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The procedure leading to approval of a condominium project – new construction shall be the same as set forth in Section 5.15.
Where such condominium project is being developed as a planned unit development, planned shopping center, or similar planned development, the procedures for approval of said planned development and the approval of said development as a condominium project may be combined.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the developer for each condominium project:
Where, in the opinion of the Planning Commission, a particular document as required under this Section is inapplicable for the particular condominium project proposed, the County may waive the requirement for submitting said document.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
It shall be unlawful to record any record of survey map or declaration of a condominium project in the Office of the County Recorder, unless the same shall bear thereon final approval of the Planning Commission as required by the terms of this Code, and any record of survey map or declaration so recorded without such approval shall be null and void. Any owner, or agent of any owner, of land or units located within a purported condominium project, who transfers or sells any land, structure or condominium unit in such a purported condominium project, before obtaining the final approval by the Planning Commission on the record of survey map and declaration, and recording the same in the Office of the County Recorder, shall be guilty of a misdemeanor for each lot, parcel of land, structure or condominium unit so transferred or sold.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this Section is to establish guidelines and minimum requirements relating to the conversion of existing structures to condominium ownership and the maintenance and operation of such projects. These provisions shall be supplemental and in addition to the general requirements for large scale developments contained under Section 5.1 of this Code, and also the requirements of the Utah Code Annotated, 1953, as amended.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses permitted within a condominium project shall be limited to those uses specifically permitted within the zone which underlies the area of the project and shall be subject to all conditions and restrictions required within the zone for the use.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Each proposed condominium conversion project shall conform to the following minimum standards:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The procedure to be followed shall be the same as set forth in Section 5.15, except that where the conversion project consists entirely of a two-family dwelling located on conforming lots of record, the conversion shall be considered as a twin home project and shall be processed in accordance with the provisions relating thereto.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the developer for each condominium conversion project:
Where, in the opinion of the Planning Commission, a particular document required under this Section is inapplicable for the particular project proposed, the Planning Commission may waive the requirement for submitting said document.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of these regulations is to establish guidelines dealing specifically with design, construction and operation of factory-built housing parks. These provisions shall be supplemental and in addition to the general requirements for large-scale developments.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Permitted uses within a factory-built housing park shall be limited to the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Factory-built home parks shall have a minimum area of four (4) acres and a maximum density of seven and one-half (7.5) dwelling units per acre.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Factory Built Housing Parks shall be approved as required under Section 5.15.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The layout and design of all manufactured housing parks and the content of all required plats, engineering plans and other required submissions shall be prepared in accordance with minimum County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Satisfactory evidence of an entitlement to a firm and uninterruptible right to the use of culinary water, from a recognized water supply agency for each lot or unit in the development, shall be submitted with each application as follows:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in all developments, if not existing. Said improvements shall meet minimum County standards or the approved plan, and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be required as a condition of approval. Said assurances shall be in accordance with the provisions in Section 7.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the Developer for each development. All documents shall be prepared in accordance with County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this section is to promote the convenience of residents living beyond walking distance from the central business district, in obtaining a variety of goods and services, and to establish guidelines dealing specifically with the design and construction of shopping centers.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses within the zone shall be limited to the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Each shopping center project shall contain not less than six (6) acres; provided, however, that additions of less than six acres may be made to an existing development.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Planned shopping center developments shall be approved as required under Section 5.15. The procedure for rezoning to SC-1 and approval of a planned shopping center development may be combined.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The layout and design of all shopping center developments and the content of all required plats, engineering plans and other required submissions shall be prepared in accordance with minimum County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Satisfactory evidence of an entitlement to a firm and uninterruptible right to the use of culinary and fire water, from a recognized water supply agency, shall be submitted with each application as follows:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in all developments, if not existing. Said improvements shall meet minimum County standards or the approved plans, and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be required as a condition of approval. Said assurances shall be in accordance with the provisions of Section 7.
Developers may install other improvements; however, the construction of other improvements shall not be required as a condition of approval of a planned shopping center development.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the Developer for each development. All documents shall be prepared in accordance with County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Mountain Recreation Developments may be constructed only in those zones in which they are specifically a permitted use and shall be subject to compliance with the following conditions and procedures.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses permitted in a Mountain recreation development shall be limited to the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Each development shall contain not less than four (4) acres.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Planned mountain recreation projects shall be approved as required under Section 5.15.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A detailed site plan of the proposed development shall be submitted. Said plan shall contain the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The layout and design of the development and the content of all required plats, engineered plans, and other required submissions shall be in accordance with County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Satisfactory evidence of title to a permanent water right from a reliable water source in the amount necessary, as determined by the County, to meet minimum State Health requirements for all features of the project shall be submitted.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed in the developments, provided that where a particular improvement is inapplicable for the project proposed, the County may waive the requirement. All required improvements shall meet minimum County standards and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be required as a condition of approval. Said assurances shall be in accordance with the provisions of Section 7.
Developers may install other improvements; however, the construction of other improvements shall not be required as a condition of approval of a mountain recreation development.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the developer for each development, provided, that where a particular document required under this Section is inapplicable for the particular project proposed, the County may waive the requirement.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses permitted in a Recreational Vehicle (RV) Court shall be limited to the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Uses permitted in a Recreational Vehicle (RV) Court shall be limited to the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Recreational Vehicle Courts shall be approved as required under Section 5.15.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
A detailed site plan of the proposed development shall be submitted. Said plan shall contain the following:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The layout and design of the development and the content of all required plats, engineering plans, and other required submissions shall be in accordance with County standards.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Satisfactory evidence of title to a permanent water right from a reliable water source in the amount necessary, as determined by the County, to meet minimum State Health requirements for all features of the project shall be submitted.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following improvements shall be installed according to County standards and shall be completed within one year from the date of final approval of the project by the Planning Commission; except that, upon a showing of good and sufficient cause, the Planning Commission may authorize an extension of the time limit for a period up to six (6) months. Financial assurances guaranteeing the construction of all required improvements shall be required as a condition of approval. Said assurances shall be in accordance with the provisions of Section 7.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent of this section is to establish guidelines dealing specifically with design approval, construction and operation of proposed new hotels, motels, and apartments. These provisions shall be supplemental and in addition to the general requirements for large-scale developments contained under Section 5.1 of this Code.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
Hotels, motels and apartments shall comply to all applicable requirements of the underlying zone, and where the proposed hotel, motel or apartment is to be developed under the provisions relating to a planned unit development, all uses or structures shall comply with the plans for such project as approved by the County.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The procedure leading to approval of a hotel, motel or apartment – new construction shall be the same as set forth in Section 5.15.
Where such hotel, motel or apartment is being developed as a planned unit development, planned shopping center, or similar planned development, the procedures for part of approval of said planned development and the approval of said development as a hotel, motel or apartment project may be combined.
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The following documents shall be prepared and submitted by the developer for each hotel, motel and apartment:
HISTORY:
Ord. 515, 5/1/2019
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The intent and purpose of this Ordinance is to provide for the extraction of earth products using surface mining methods, for stockpiling mined materials, and for the placement of overburden and leftover earth materials in mining waste dumps, while protecting the environment, the rights of neighboring property owners, and roads and other public facilities from unusual wear or damage.
HISTORY:
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The provisions of this Ordinance shall apply to all sites located in Carbon County, Utah, on private property, or property owned by Carbon County, and not on property owned by the State of Utah or the United States of America, or on property directly supervised by the U.S. Army Corps of Engineers, and where sand, gravel, clay, topsoil, rocks or minerals will be extracted by any open pit methods and to all sites where such extracted earth products are stockpiled; and sites where overburden and leftover earth materials are placed in mining waste dumps.
HISTORY:
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The Zoning Administrator shall issue a permit for an open pit, stockpile, or a waste dump only when all of the following are met:
PROVIDED, however, that upon finding such is necessary to protect the property values of neighboring property interests or to preserve desirable aesthetics, the County Planning Commission may require as part of the bond an agreement that the extent of the disturbed area at the site of extraction shall be no larger than seven (7) acres at any one time and/or may require that the extraction process shall cease and the site rehabilitated (whether or not all materials have been obtained) within a specific time period, not to be less than 5 years. When limited to 7-acre units the pit, or portions of it, shall be closed, rehabilitated, and approved by the Zoning Administrator as meeting the standards of this ordinance before further areas are disturbed.
PROVIDED, however that desert areas located in the M&G Zone which naturally lack soil or vegetation shall be restored to a surface that corresponds with the native condition rather than adding soil and/or re-seeding.
HISTORY:
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
HISTORY:
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
In addition to the business licenses and building or grading permits required elsewhere in county ordinances, any open pit operation shall be required to have a current certificate of zoning compliance. No certificate of zoning compliance for an open pit operation shall have a period of validity past December 31 of each calendar year, but the permit shall be automatically renewed if the pit is found to be in compliance with the standards of this ordinance. The Zoning Administrator, with the advice of the County Engineer, shall determine if such compliance exists.
HISTORY:
Ord. 525, 12/4/2019
Ord. 545, 3/17/2021
The purpose of the conference is to acquaint the developer with the range of opportunities for development under the provisions of this Code, and the requirements and procedures for approval by the Planning Commission The County staff may suggest changes in the proposed development project so that the project may be more fully consistent with the County’s development regulations, policies and this Code. The recommendations from the staff shall be purely advisory and in no way shall the conference be construed to constitute approval or disapproval of the plan.
The item will not be placed on the agenda of the Planning Commission until such time as the developer submits a complete application and documents, after which time the item will be placed on the next available meeting agenda of the Planning Commission.
If the item is placed on the agenda for Planning Commission approval, the developer will also submit the plans, documents, statements, and data required by other agencies such as the County Engineer, Road Supervisor, Weed Department Supervisor, County Attorney, Fire Marshal, Health Department, Utah Division of Oil, Gas & Mining, or other appropriate agency or official, as determined during the administration of the application.
If the proposed project is a subdivision, planned unit development, or other type of project which is required by this Code to receive other levels or stages of approval, the Planning Commission shall place the project item on the next Planning Commission agenda, and successive meeting agendas, for consideration of that next level of approval, as requested by the developer.
The final approval of the project shall be by passage of a motion by the Planning Commission, which outlines the project scope and identifies the territory to be included in the project plan. Upon completion by the developer, and acceptance of the project by the County, including the release of any financial guarantees, the approved project shall constitute the zoning requirements for the territory covered by the project. The specific requirements of the underlying zone shall be considered modified in conformance with the plans, plats, documents and agreements approved for the project.
If disapproved, no further action is required.
If approved as submitted, the developer will proceed to prepare final plans, documents, statements and data to be submitted to the Zoning Administrator who shall issue any Conditional Use or other Zoning Permits.
In the case of a Mountain Home or Recreation Development, Planned Unit Development, Condominium Project or other project requiring the filing of a plat, the developer shall prepare the required final plans, plats, documents, statements, data, financial guarantee, title report, or other documentation and permits required by other levels of government or agencies and officials, to be submitted to the Zoning Administrator. The Zoning Administrator shall review the plat and the documents and refer the plat to the County Surveyor or Engineer who shall review the plat for accuracy. Upon determining that the project is in full compliance with this Code and other applicable regulations, the Zoning Administrator shall submit the plat to the County Recorder for filing. The developer shall pay any recording fees.
If approved subject to modifications, the Planning Commission shall instruct the developer as to any modifications required, then refer the project to the Zoning Administrator who shall document that all such modifications have been made to the plans for the project, then either issue the appropriate permits or submit the plat to the County Recorder for filing and recording. The developer shall pay any recording fees.
No plat for a development approved under this section shall be recorded unless and until all of the requirements of this Code for such development has been received by Carbon County.
Planning Commission approval of any project administered under this section shall remain valid for a period of twelve (12) months, beginning from the date of approval by the Planning Commission. The time limit may be extended by action of the Planning Commission for periods not exceeding one (1) year. Any requests for extension of time shall be officially requested by the original developer in writing, and placed on the agenda of a Planning Commission meeting for approval no later than thirty-one (31) days prior to the expiration of the one-year period. No construction shall be permitted until final approval of the development has been obtained.
HISTORY:
Ord. 515, 5/1/2019
Ord. 545, 3/17/2021