The following requirements shall govern the construction and installation of all photovoltaic systems:
A. Building Permit: All photovoltaic systems require a building permit from the Building Inspector prior to the initiation of construction. Drawings and specifications by a Licensed Architect or Licensed Engineer shall be submitted to the Village of Herscher and shall provide evidence and certification of compliance with all applicable ordinances and statutes of the Village of Herscher and the State of Illinois.
B. Controls: All electrical controls shall be inspected, upon installation by an electrician licensed by the State of Illinois.
C. Design Safety Certification: The safety of the design of all photovoltaic systems shall be certified by an electrician licensed by the State of Illinois. The standard for certification shall be good engineering practice and compliance with all ordinances and statutes of the Village of Herscher and the State of Illinois.
D. Installation Certification: The design of all photovoltaic systems shall be certified by an electrician licensed by the State of Illinois. The standard for certification shall be good engineering practices and compliance with all applicable ordinances and statutes of the Village of Herscher and the State of Illinois.
E. Setbacks: Setbacks from public roads and property lines shall be as established by the Zoning Ordinances of the Village of Herscher.
F. Height: A building mounted photovoltaic system may not extend above the peak roof height of the building to which the system is affixed, except on a flat roof, the height of a building-mounted photovoltaic system shall not extend more than six feet (6') above the roof line, or above the maximum permitted heights in the zoning district, whichever is less. The maximum height of a ground-mounted photovoltaic system shall be six feet (6') as measured from the average grade at the base of the pole to the highest edge of the system.
G. Prohibited Location: No ground-mounted photovoltaic system shall be constructed or maintained in the front yard of any lot or in the side yard of a corner lot which is closest to the street.
H. Utilities Agreement: Proof of an inter-connection agreement between the owner of the lot and the local public utility company shall be submitted to the Village of Herscher with the permit application.
I. Accessory Use: A photovoltaic system shall be accessory to the principal permitted use of a site.
J. Maintenance: All photovoltaic systems shall be maintained in compliance with applicable Building and Safety Codes of the Village of Herscher and also be in compliance with any other State or Federal statutes or rules and regulations of any agency having jurisdiction to regulate such systems.
K. Electricity Usage: Energy produced by a photovoltaic system shall only be used on the site where the system is located.
L. Signage: No sign, advertisement or attention-getting device shall be permitted on or attached to any photovoltaic system.