Zoneomics Logo
search icon

Mariposa County Unincorporated
City Zoning Code

17.100 Light

Manufacturing And Industrial Zone-1 M-1

17.100.010 Purpose And Intent

The Light Manufacturing and Industrial Zone-1, hereinafter referred to as M-1 zone is designed to provide area for light industrial development that can be established in close proximity to commercial and residential development.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

17.100.020 Development Standards For M-1

Development standards for the M-1 zone shall be as follows:

  1. Location: This zone shall be located on, or easily accessible to state highways and designated primary county roads, i.e. collector and arterial roads as specified on the current official county road map, as amended from time to time.
  2. Uses:
    1. Permitted Uses:
      1. Automotive; assembly, repair, and painting;
      2. Boat and boating equipment manufacturing and repair;
      3. Ceramic products;
      4. Sign manufacturing;
      5. Electrical parts and components, manufacture and assembly;
      6. Engine rebuilding and assembly;
      7. Gas and electrical fixture manufacture assembly;
      8. Cabinet and carpentry shops;
      9. Machine shops and sheet metal shops excluding drop hammers and foundaries;
      10. Paint shops;
      11. Manufacturing, compounding, processing, and packaging of bakery goods; candy; cosmetics; health foods; pharmaceuticals;
      12. Assembly of articles or merchandise from the following previously prepared materials: canvas; cellophane; glass; plaster; plastics or synthetics;
      13. Radio, television and other communication equipment storage, assembly, repair, and wholesale;
      14. Rubber and metal stamps;
      15. Shoes and other footware manufacturing;
      16. Other similar manufacturing, processing, treatment or assembly activities as determined by the Planning Commission;
      17. Bottling plants;
      18. Creameries;
      19. Laboratories;
      20. Cleaning, laundry and dyeing plants;
      21. Tire retreading and recapping;
      22. Fabrication of products from finished rubber;
      23. Assembly of electric and electronic equipment;
      24. Wholesaling and warehousing;
      25. Printing and publishing;
      26. Lumber and wood product manufacturing or processing except planing mills and sawmills;
      27. Contractors equipment yard; Public utility facilities and maintenance yards and other public facilities.
    2. Accessory Uses: Research and development facilities and all accessory uses listed in CG-1, Section 17.88.020(B)(2).
    3. Conditional uses: None.
    4. Prohibited uses: All uses listed in section 17.108.200 of this title and other uses not listed above are prohibited.
  3. Minimum parcel or lot sizes: No parcel of real property shall be divided or split into two (2) or more parcels or lots by voluntary transfer, court action or other conveyance where any one (1) of the parcels or lots so created will be less than twenty (20) acres or one-half of a legal quarter-quarter section in gross area. In no case shall any individual sub-parcel within the park, either for an individual's private use, or as a common ownership area, be less than six thousand (6,000) square feet in area.
  4. Density: One (1) single family residence per twenty (20) acres or one-half of a legal quarter-quarter section in gross area. The density contained herein shall remain unchanged regardless of whether or not the park is subdivided in sub-parcels as permitted by this title.
HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988
Amended by Ord. 1086 Sec. II on 12/20/2011

17.100.030 Minimum Setback Standard

The setback standards and parking or development within the setbacks for the M-1 zone shall be as specified for the CG-1 zone listed in section 17.88.030 of this title.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

17.100.040 Design Criteria

The design criteria for the M-1 zone shall be as specified for the CG-1 zone listed in section 17.88.040 of this title.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

17.100.050 Phasing Of The Project

Project phasing in the M-1 zone shall be as specified for the CG-1 zone listed in section 17.88.050 of this title.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

17.100.060 Procedures For Approval For A M-1 PLAN

The procedures for establishing an M-1 zone shall be as specified for the CG-1 zone listed in section 17.88.060 of this
title.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

17.100.070 Granting Of Permits

Granting of permits for an M-1 zone shall be as specified for the CG-1 zone listed in section 17.88.070 of this title.

HISTORY
Adopted by Ord. 704 Sec. 1 on 3/8/1988

1086