Zoneomics Logo
search icon

Newtown City Zoning Code

§ B70-11.07

Conditions relating to soil erosion and sediment control.

A. 
The estimated costs of measures required to control soil erosion and sedimentation, as specified in the certified plan, that are a condition of certification of any modified site plan, if such a modified site plan is submitted for review by the Commission, may be required to be covered in a performance bond or other assurance acceptable to the Commission in accordance with the provisions specified in the appropriate sections of the Zoning Regulations of the Borough of Newtown and the Subdivision Regulations of the Town of Newtown, as from time to time amended.
B. 
Site development shall not begin unless the soil erosion and sediment control plan is certified and those control measures and facilities in the plan schedule for installation prior to site development are installed and functional.
C. 
Planned soil erosion and sediment control measures and facilities shall be installed as scheduled according to the certified plan.
D. 
All control measures and facilities shall be maintained in effective condition until the sign-off of the certificate of occupancy or the designated date reflected in the site stabilization agreement to ensure the compliance of the certified plan.
[Amended 12-9-2015, effective 12-21-2015]