Zoneomics Logo
search icon

Newtown City Zoning Code

§ B70-11.08

Inspection.

Inspection shall be made by the Commission or the Conservation Director, its designated agent, during development to ensure compliance with the certified plan and that control measures and facilities are properly performed or installed and maintained. The Commission may require the permittee to verify through progress report that soil erosion and sediment control measures and facilities have been performed or installed according to the certified plan and are being operated and maintained. It shall be the responsibility of the permittee to provide proper notification for inspection of control measures and facilities that are required prior to proceeding with any development work which is affected by the installation of these measures. Failure to provide this notification shall nullify any approvals given by the Commission on the project site.