All new construction and substantial improvement of any habitable building (as defined in § 107-30.1-201) located in flood hazard areas shall have the lowest floor, including basement, together with the attendant utilities (including all electrical, heating, ventilating, air-conditioning and other service equipment) and sanitary facilities, elevated to or above the Local Design Flood Elevation as determined in § 107-30.1-102.3, be in conformance with ASCE Chapter 7, and be confirmed by an Elevation Certificate.