The Construction Official shall make or cause to be made, inspections for buildings and structures in flood hazard areas authorized by permit in accordance with the Uniform Construction Code, N.J.A.C. 5:23.
(1) Lowest floor elevation. Upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in §
107-30.1-801.2 shall be submitted to the Construction Official on an Elevation Certificate.
(2) Lowest horizontal structural member. In V zones and Coastal A zones, upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in §
107-30.1-801.2 shall be submitted to the Construction Official on an Elevation Certificate.
(3) Installation of attendant utilities (electrical, heating, ventilating, air-conditioning, and other service equipment) and sanitary facilities elevated as discussed in §
107-30.1-801.2.
(4) Final inspection. Prior to the final inspection, certification of the elevation required in §
107-30.1-801.2 shall be submitted to the Construction Official on an Elevation Certificate.