The provisions of this section are applicable to all new multifamily residential and nonresidential development or redevelopment in any zone.
A. Construction Standards:
1. Hot water recirculation systems must be installed, unless hot water delivery can be demonstrated to occur without first displacing more than zero point five (0.5) gallons of system water.
2. New and future installations of plumbing fixtures must meet or exceed the water conservation requirements specified in the building code as adopted by Santa Clara City.
3. All units located partially or completely on a ground floor, and which are individually subdivided, must be separately metered, sub metered, or equipped with alternative technology capable of tracking the water use of the individual unit, and the information must be made available to the resident of each unit. Individually platted condominium units are excepted if a condominium owners' association owns and maintains the water lines and meters. All nonresidential projects require separate water meters for all outdoor water usage, including landscaping.
4. All commercial car washes must utilize a wastewater recirculation system and limit water use to a maximum amount of thirty-five (35) gallons per vehicle washed.
5. Manmade ornamental water features are limited to twenty-five (25) square feet per parcel and are limited to the parcel.
6. All golf courses using water district or municipal water supplies shall have a separate meter and irrigate with secondary irrigation water. Irrigation with potable water is prohibited. Each golf course development must submit and follow a water budget with the landscape documentation package and identify water conservation measures for city approval.
7. Outdoor misting systems may only be operated during the May through September time period where the daily high temperature is ninety degrees (90°) Fahrenheit or greater.
B. Landscape Standards: For all multifamily residential and nonresidential development subject to this section, landscaping must meet the following requirements:
1. Lawn is prohibited in park strips, all landscape areas less than eight (8) feet wide, and on any slope that exceeds twenty percent (20%).
2. Attached multi-family residential units may have up to one hundred (100) square feet of lawn per dwelling unit. Properties with less than six (6) dwelling units are allowed up to six hundred (600) square feet of lawn.
3. Lawn areas are prohibited for nonresidential uses except where an active recreation area is appropriate, such as a childcare center or athletic complex.
4. Landscape and irrigation installers must follow plans that have been signed and approved by the city.
5. Each project must propose and comply with an approved planting plan that has a minimum of forty percent (40%) vegetative cover of a landscaped area with water-efficient shade trees and bushes adequate in number and configuration to visually enhance the project, prevent heat islands, and prevent soil erosion. The city has sole discretion to approve or require adjustments to the configuration of vegetation in the planting plan.
6. If secondary irrigation water is available, each project shall connect to the system for all outdoor water use. The city may make minor exceptions, allowing use of treated water for outdoor plantings in small beautification areas, in its sole discretion.
C. Required Documentation:
1. Landscape Documentation Package: A copy of a landscape documentation package must be submitted to and approved by the city prior to the issue of any building permit. A copy of the approved landscape documentation package must be provided to the property owner or site manager. The landscape documentation package must be prepared by a professional landscape architect (PLA) and must consist of the following items:
a. Project data sheet containing the following:
(1) Project name and address;
(2) Applicant or applicant agent's name, address, phone number, and email address;
(3) Landscape architect's name, address, phone number, and email address; and
(4) Landscape contractor's name, address, phone number and email address, if available currently.
b. Planting Plan: A detailed planting plan must be drawn at a scale that clearly identifies the following:
(1) Location of all plant materials, a legend with common and botanical names, and size of plant materials;
(2) Property lines and street names;
(3) Existing and proposed buildings, walls, fences, utilities, paved areas and other site improvements;
(4) Existing trees and plant materials to be removed or retained;
(5) Scale: graphic and written;
(7) Designation of hydrozones; and
(8) Details and specifications for tree staking, soil preparation, and other planting work.
c. Irrigation Plan: A detailed irrigation plan must be drawn at the same scale as the planting plan and contain the following information:
(1) Layout of the irrigation system and a legend summarizing the type and size of all components of the system, including manufacturer name and model numbers;
(2) Static water pressure in pounds per square inch (psi) at the point of connection to the public water supply;
(3) Flow rate in gallons per minute and design operating pressure in psi for each valve and precipitation rate in inches per hour for each valve with irrigation equipment (i.e., sprinklers, drip emitters, bubblers, etc.); and
(4) Installation details for irrigation components.
d. Grading Plan: A grading plan must be drawn at the same scale as the planting plan and must contain the following information:
(1) Property lines and street names, existing and proposed buildings, walls, fences, utilities, paved areas, and other site improvements; and
(2) Existing and finished contour lines and spot elevations as necessary for the proposed site improvements, as well as drainage.
2. Plan Review, Construction Inspection, And Post-Construction Monitoring:
a. As part of the building permit approval process, a copy of the landscape documentation package must be submitted with a city provided pre-submittal checklist completed for the city to initiate a review and approval process before construction begins.
b. All installers and designers must meet state and local license, insurance, and bonding requirements, and be able to show proof of such.
c. During construction, site inspection of the landscaping may be performed by the building department or other city official tasked with such inspections.
d. Following construction and prior to issuing an occupancy permit, an inspection must be scheduled with the building department or other city official tasked with such inspections to verify compliance with the approved landscape plans. The certificate of substantial completion must be completed by the property owner, developer, contractor, or landscape architect and submitted to the city. The certificate of substantial completion must be accompanied by a certification from the landscape architect that the landscaping, irrigation, and related improvements have been installed consistent with the approved landscape documentation package.
e. The building department or other city official tasked with such inspections reserves the right to perform site inspections at any time before, during, or after the irrigation system and landscape installation, and to require corrective measures if requirements of this chapter are not satisfied. (Ord. 2024-02: Ord. 2022-05: Ord. 2026-01)