Traffic impact analysis. Any proposed development of greater than three acres shall be accompanied by a traffic impact analysis prepared by a qualified professional traffic engineer or transportation planner. The analysis will be done in accordance with the requirements of § 300-438E of this chapter, and shall include a specific analysis of weekend average daily trips. In addition, for developments that are proposed to contain less than 10,000 square feet of gross floor area and that generate less than 100 peark hour trips in either the morning or afternoon peak hour, the Township may permit the applicant to limit the traffic impact study to an analysis of the proposed driveway(s), which shall consider, at a minimum, the location, configuration and traffic expected to use the driveway(s) at the time of highest peak-hour demand. Additional information may be required at the discretion of the Township Board of Supervisors, upon the recommendation of the Township Engineer or Traffic Consultant.