The following uses are permitted subject to administrative approval pursuant to WCC § 22.05.028:
.131
A temporary second dwelling unit of no more than 1,248 square feet in floor area, in the form of a manufactured home, a fully serviced travel trailer, park model trailer, or motor home, to provide:
(1)
A temporary dwelling space for family members who, due to professionally documented physical or mental disorders, or risks of such disorders, require supervision and care where such care is provided by members of the family who reside on the property; or
(2)
A temporary dwelling space for a person providing care for the resident owner of the subject property when said owner needs supervision and care as described in (1) above.
Approval Requirements:
Administrative approval for temporary second dwelling units shall be approved if it is determined that the proposal meets the following requirements:
(1)
Temporary second dwelling units shall only be permitted on fully serviced parcels on which the applicant can meet setback, ingress, egress, height restrictions, and lot coverage requirements.
(2)
The size of the temporary dwelling shall be appropriate to the use and size of the parcel and shall be limited so as to comply with the standards set forth in (1) above.
(3)
The temporary home shall be connected to an approved water supply and adequate capacity sewage disposal system approved by the Whatcom County health department.
(4)
When care is no longer necessary, the temporary home shall be removed within 60 days.
(5)
The permit shall be valid for one year. The permit may be extended on a yearly basis; provided, that an affidavit is furnished by the permittee affirming that the circumstances allowing the original permit remain in effect.
(6)
A covenant shall be filed that restricts sale of the property while the temporary dwelling is in place.
(7)
The use will not be hazardous or disturbing to existing or future neighboring uses.
(8)
Evidence of adequate off-street parking space shall be provided.
(9)
There shall be no occupancy of the temporary dwelling outside the conditions under which the temporary dwelling is permitted pursuant to this section.
(10)
All mobile homes must demonstrate compliance with minimum HUD Fire Safety Standards and compliance with current Washington Administrative Code (WAC).
Penalties: False statements on supporting documentation submitted with the application or failure to comply with any of the approval requirements may be cause for revocation of the permit and prosecution.
.132
Accessory dwelling units, when consistent with WCC § 20.80.910.
.133
Repealed by Ord. 2023-078.
.134
Type II home-based businesses pursuant to WCC § 20.80.970.
.135
Battery energy storage systems with up to five MW of storage capacity, provided:
(1)
Any structures shall be no closer than 25 feet from any property line.
(2)
The proposed use shall be compatible with the general appearance and character of the surrounding area. Landscape screening shall be required pursuant to the requirements of WCC § 20.80.345.
(3)
Any lights used to illuminate the facility shall be so arranged as to direct the light away from the adjoining properties and public roads.
(4)
The facility shall comply with state noise level standards under Chapter 173-60 WAC, as amended. The applicant shall provide information detailing the expected noise level and any proposed abatement measures. This may require noise attenuation devices or other mitigation measures to minimize impacts.
(Ord. 87-11, 1987; Ord. 87-12, 1987; Ord. 91-009, 1991; Ord. 95-031, 1995; Ord. 98-018 § 1, 1998; Ord. 99-068, 1999; Ord. 2001-012 § 1, 2001; Ord. 2005-079 § 1, 2005; Ord. 2006-061 § 1 (Att. A)(7), 2006; Ord. 2009-034 § 1 (Att. A), 2009; Ord. 2010-016 § 1 (Exh. A), 2010; Ord. 2013-057 § 1 (Exh. A), 2013; Ord. 2016-011 § 1 (Exh. D), 2016; Ord. 2019-013 § 1 (Exh. A), 2019; Ord. 2021-059 § 3 (Exh. C); Ord. 2022-048 § 1 (Exh. A), 2022; Ord. 2023-018 § 1 (Exh. A), 2023; Ord. 2023-078 § 1 (Exh. A § 9), 2023; Ord. 2025-020 § 1 (Exh. A), 2025)