.205
If a major project permit is determined to be required, an application shall be completed and filed along with the appropriate fees, and the application shall be processed in accordance with Chapter 22.05 WCC. A master plan is required as part of the application for a major project permit. The master plan document shall include all elements required per the department's administrative manual.
.210
Development Standards. The major project permit may propose standards that will control development of the possible future uses that are in addition to, or substitute for, requirements of this chapter. These may be such things as height limits, setbacks, frontage, landscaping requirements, parking requirements, signage, view corridors or facade treatments. Proposed standards that do not meet the minimum county standards must obtain the appropriate variance prior to county approval of the proposed standards. If the proposed design standards will apply to property located partially or totally within an urban growth area, concurrence of the affected city will be required.
.215
Procedures. Major project permit review shall be conducted under current review procedures. Other land use reviews may be conducted concurrently with the major project permit review.
(a)
Any modifications, additions or changes to an approved master plan are subject to the following:
(i)
Minor changes shall be reviewed for compliance and compatibility with the approved major project permit.
(A)
A determination is made by the director. The director is authorized to consult a technical committee at his/her discretion.
(B)
Minor changes are those amendments which may affect the dimensions, location and type of improvements of facilities; provided, the amendment maintains the basic character of the major project permit application approved by the county council including general type and location of dwellings and other land use activities, arrangement of buildings, density of the development, and provisions of the project to meet density bonus and open space requirements, or capacity limits, and maintains required conditions or mitigation.
(ii)
Major changes shall be subject to the original procedural application type, subject to the fees as contained in the unified fee schedule.
(iii)
Major project permits may include, as a condition of their approval, a requirement for periodic progress reports and mandatory updates on a predetermined interval.
.270
Where a project requires a major project permit, that project shall be exempt from the requirement of obtaining a conditional use permit.
.275
Major project permits: Where an applicant has applied for a planned unit development or a development agreement, that project shall be exempt from the requirement to obtain a major project permit except in the Cherry Point Industrial District.
.280
Major project permits in the Cherry Point Industrial District: Where a project in the Cherry Point Industrial District requires a major project permit, the major project permit shall be concurrently processed with other required land use permits including but not limited to: planned unit development or development agreement.
(Ord. 86-16, 1986; Ord. 87-11, 1987; Ord. 87-12, 1987; Ord. 91-075, 1991; Ord. 93-091, 1993; Ord. 96-056 Att. A § A2, 1996; Ord. 99-081, 1999; Ord. 2003-039 Exh. A, 2003; Ord. 2016-011 § 1 (Exh. H), 2016; Ord. 2018-032 § 1 (Exh. D), 2018; Ord. 2019-013 § 1 (Exh. A), 2019; Ord. 2021-046 § 3 (Exh. C), 2021)