For a transportation concurrency evaluation, the applicant shall provide a traffic study prepared by a traffic engineer, which shall compare the calculated level of service to the adopted level of service standard for each impacted transportation facility. To establish the scope of the traffic study, the applicant may provide a preliminary, limited scope analysis documenting the estimated trip generation and distribution (subsections (1)(a)(i) and (ii) of this section) for the proposed development application. The director or his designee will review and adjust, if necessary, this information for use in establishing the analysis locations for the traffic study for the concurrency evaluation. The traffic study shall, at a minimum, provide the following information for the identified concurrency locations:
(i)
Number of peak hour trips generated by the development according to the ITE trip generation manual or other method approved by the director;
(ii)
Anticipated trip distribution;
(iii)
The current calculated level of service of all impacted transportation facilities;
(iv)
The future calculated level of service of all impacted transportation facilities, as identified by the county, incorporating traffic volumes from the proposed development;
(v)
Any proposed mitigation; and
(vi)
The future calculated level of service of all impacted transportation facilities with the incorporation of proposed development traffic volumes and any proposed mitigation.