SUBDIVISION AND LAND PARTITION
Article 13 of the Astoria Development Code shall be known as "Subdivision and Land Partition."
The purpose of this ordinance is to enact subdivision and land partitioning regulations for the City which will provide for better living conditions within new land divisions; assure necessary streets, open space, utilities and public areas and provide for their installation or improvement; enhance and secure property values in land divisions and adjacent land; simplify and make land descriptions more certain and in general to promote the health, safety, convenience and general welfare of the people of Astoria.
Any subdivision or partition of an area or tract of land shall be in compliance with the provisions of this ordinance.
This ordinance prescribes the types of land divisions permitted within the City and the processes required to review them. The permitted types of land divisions are:
The minimum standards for design and improvements in a major land partitioning shall conform to Sections 13.400 to 13.630.
The minimum standards for design and improvements in a minor land partitioning shall conform to Sections 13.400 to 13.630.
A land division, whether by a subdivision, creation of a street, or a partitioning, shall conform to any development plans, shall take into consideration any preliminary plans made in anticipation thereof, and shall conform to the design standards established by this ordinance. The City Engineer shall prepare and submit to the City Council specifications to supplement the standards of this ordinance, based on standard engineering practices, concerning streets, drainage facilities, sidewalks, sewer and water systems.
(Section 13.410.A amended by Ordinance 14-03, 4-21-14) (Section 13.410.B to 13.410.N deleted by Ordinance 14-03, 4-21-14)
Easements for sewer, drainage, water mains, public utility installations, including overhead or underground systems, and other like public purposes shall be dedicated, reserved or granted by the land divider in widths not less than five (5) feet on each side of the rear lot or parcel lines, alongside lot or parcel lines and in planting strips wherever necessary, provided that easements of width, such as for anchorage, may be allowed when the purposes of easements may be accomplished by easements of lesser width as approved by the City.
In dividing tracts into large lots or parcels which at some future time are likely to be redivided, the Planning Commission may require that the blocks be of such size and shape, be so divided into building sites and contain such site restrictions as will provide for extension and opening of streets at intervals which will permit a subsequent division of any tract into lots or parcels of smaller size.
The land divider shall, subject to riparian rights, dedicate a right-of-way for storm drainage purposes, conforming substantially with the lines of any natural water course or channel, stream or creek that traverses the subdivision or partitions, or, at the option of the land divider, provide, by dedication, further and sufficient easements or construction, or both to dispose of the surface and storm waters.
The Planning Commission may refuse to approve a subdivision or partition when the only practical use which can be made of the property proposed to be subdivided or partitioned is a use prohibited by this code or law, or if the property is deemed unhealthful or unfit for human habitation or occupancy by the County or State health authorities, or, if the property is deemed unsuitable for the reason that it is in an actual landslide area or in a wetlands area.
If any portion of land proposed for development is subject to overflow, inundation or flood hazard by, or collection of, storm waters, an adequate system of storm drains, levees, dikes and pumping systems shall be provided.
No tentative subdivision plat or subdivision plan or subdivision shall be approved which bears a name approved by the County Surveyor or County Assessor, which is the same as similar to or pronounced the same as the name of any other subdivision in Clatsop County unless the land platted is contiguous to and platted by the same party that platted the subdivision bearing that name, or unless the party files and records the consent of the party that platted the contiguous subdivision bearing that name. All subdivision plats must continue the lot numbers and if used, the block numbers of the subdivision plat of the same name last filed.
Improvements to be installed at the expense of the subdivider or applicant and at the time of subdivision or major partition:
(Section 13.610 amended by Ordinance 94-02, 2-7-94)
All monuments shall be set according to the provisions of ORS 92.060. In making the survey for the subdivision or partition, the surveyor shall set sufficient permanent monuments prior to recording so that the survey or any part thereof may be retraced according to Oregon Revised Statutes.
Interior boundary and lot monuments for the subdivision or partition shall be marked by a registered land surveyor in accordance with ORS 92.060, and referenced in the plat. If the monuments are in place at the time the subdivision or partition is recorded, no performance bond is necessary. If monumentation is delayed beyond the date on which the subdivision is recorded, a bond must be posted to assure that the monuments will be set by a certain date, in accordance with ORS 92.065. The City shall determine the length of time and estimated amount of bond or cash deposit to guarantee payment of the cost of setting the interior monuments in the subdivision or partition.
(Section 13.680 added by Ordinance 10-06, 4-19-10)
Variances to the requirements of this ordinance may be granted where the criteria in Section 12.010 are met.
It shall be the responsibility of the applicant to pay for the full cost of processing permit applications. Such fees shall not be refundable. The applicant shall be billed for costs incurred at the conclusion of the City action on the permit request. However, in no case shall the actual cost exceed the cost to the City. Fees shall not include the cost of preparing transcripts for appeals. Fees for preparation of written transcripts shall not exceed the actual cost of preparing the transcript, up to $500, plus one half of the actual cost over $500.
The provisions of this ordinance are severable. Should any section, clause, or provision of the ordinance be declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of the ordinance as a whole or any part thereof, other than the part so declared to be invalid.
In addition to penalties provided by State law, a person who violates or fails to comply with a provision of this ordinance shall, upon conviction thereof, be punished by a fine of not more than $500 or imprisonment for not more than 100 days, or both. A violation of the ordinance shall be considered a separate offense for each day the violation continues.
SUBDIVISION AND LAND PARTITION
Article 13 of the Astoria Development Code shall be known as "Subdivision and Land Partition."
The purpose of this ordinance is to enact subdivision and land partitioning regulations for the City which will provide for better living conditions within new land divisions; assure necessary streets, open space, utilities and public areas and provide for their installation or improvement; enhance and secure property values in land divisions and adjacent land; simplify and make land descriptions more certain and in general to promote the health, safety, convenience and general welfare of the people of Astoria.
Any subdivision or partition of an area or tract of land shall be in compliance with the provisions of this ordinance.
This ordinance prescribes the types of land divisions permitted within the City and the processes required to review them. The permitted types of land divisions are:
The minimum standards for design and improvements in a major land partitioning shall conform to Sections 13.400 to 13.630.
The minimum standards for design and improvements in a minor land partitioning shall conform to Sections 13.400 to 13.630.
A land division, whether by a subdivision, creation of a street, or a partitioning, shall conform to any development plans, shall take into consideration any preliminary plans made in anticipation thereof, and shall conform to the design standards established by this ordinance. The City Engineer shall prepare and submit to the City Council specifications to supplement the standards of this ordinance, based on standard engineering practices, concerning streets, drainage facilities, sidewalks, sewer and water systems.
(Section 13.410.A amended by Ordinance 14-03, 4-21-14) (Section 13.410.B to 13.410.N deleted by Ordinance 14-03, 4-21-14)
Easements for sewer, drainage, water mains, public utility installations, including overhead or underground systems, and other like public purposes shall be dedicated, reserved or granted by the land divider in widths not less than five (5) feet on each side of the rear lot or parcel lines, alongside lot or parcel lines and in planting strips wherever necessary, provided that easements of width, such as for anchorage, may be allowed when the purposes of easements may be accomplished by easements of lesser width as approved by the City.
In dividing tracts into large lots or parcels which at some future time are likely to be redivided, the Planning Commission may require that the blocks be of such size and shape, be so divided into building sites and contain such site restrictions as will provide for extension and opening of streets at intervals which will permit a subsequent division of any tract into lots or parcels of smaller size.
The land divider shall, subject to riparian rights, dedicate a right-of-way for storm drainage purposes, conforming substantially with the lines of any natural water course or channel, stream or creek that traverses the subdivision or partitions, or, at the option of the land divider, provide, by dedication, further and sufficient easements or construction, or both to dispose of the surface and storm waters.
The Planning Commission may refuse to approve a subdivision or partition when the only practical use which can be made of the property proposed to be subdivided or partitioned is a use prohibited by this code or law, or if the property is deemed unhealthful or unfit for human habitation or occupancy by the County or State health authorities, or, if the property is deemed unsuitable for the reason that it is in an actual landslide area or in a wetlands area.
If any portion of land proposed for development is subject to overflow, inundation or flood hazard by, or collection of, storm waters, an adequate system of storm drains, levees, dikes and pumping systems shall be provided.
No tentative subdivision plat or subdivision plan or subdivision shall be approved which bears a name approved by the County Surveyor or County Assessor, which is the same as similar to or pronounced the same as the name of any other subdivision in Clatsop County unless the land platted is contiguous to and platted by the same party that platted the subdivision bearing that name, or unless the party files and records the consent of the party that platted the contiguous subdivision bearing that name. All subdivision plats must continue the lot numbers and if used, the block numbers of the subdivision plat of the same name last filed.
Improvements to be installed at the expense of the subdivider or applicant and at the time of subdivision or major partition:
(Section 13.610 amended by Ordinance 94-02, 2-7-94)
All monuments shall be set according to the provisions of ORS 92.060. In making the survey for the subdivision or partition, the surveyor shall set sufficient permanent monuments prior to recording so that the survey or any part thereof may be retraced according to Oregon Revised Statutes.
Interior boundary and lot monuments for the subdivision or partition shall be marked by a registered land surveyor in accordance with ORS 92.060, and referenced in the plat. If the monuments are in place at the time the subdivision or partition is recorded, no performance bond is necessary. If monumentation is delayed beyond the date on which the subdivision is recorded, a bond must be posted to assure that the monuments will be set by a certain date, in accordance with ORS 92.065. The City shall determine the length of time and estimated amount of bond or cash deposit to guarantee payment of the cost of setting the interior monuments in the subdivision or partition.
(Section 13.680 added by Ordinance 10-06, 4-19-10)
Variances to the requirements of this ordinance may be granted where the criteria in Section 12.010 are met.
It shall be the responsibility of the applicant to pay for the full cost of processing permit applications. Such fees shall not be refundable. The applicant shall be billed for costs incurred at the conclusion of the City action on the permit request. However, in no case shall the actual cost exceed the cost to the City. Fees shall not include the cost of preparing transcripts for appeals. Fees for preparation of written transcripts shall not exceed the actual cost of preparing the transcript, up to $500, plus one half of the actual cost over $500.
The provisions of this ordinance are severable. Should any section, clause, or provision of the ordinance be declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of the ordinance as a whole or any part thereof, other than the part so declared to be invalid.
In addition to penalties provided by State law, a person who violates or fails to comply with a provision of this ordinance shall, upon conviction thereof, be punished by a fine of not more than $500 or imprisonment for not more than 100 days, or both. A violation of the ordinance shall be considered a separate offense for each day the violation continues.