Abandonment and decommissioning.
Solar carports shall be considered abandoned after 12 consecutive months without electrical energy generation. All above-ground and below-ground equipment, structures, and foundations must be removed from the property at the owner and/or operators' expense no later than 90 days after deemed abandoned.
A decommissioning plan signed by the owner and/or operator shall be submitted by the applicant, including the anticipated life, all associated removal costs, removal methods, and restoration methods required, prior to issuance of a special exception use permit. The decommissioning plan shall state that the site shall be restored to its previous condition, including surface grade, soil, vegetation, or pavement, within six months of the removal. As part of the decommissioning plan, the applicant shall be required to post with the Town, as a condition precedent to receiving all necessary approvals, a performance bond approved by the Town Board of no less than 125% of the estimated removal costs. The applicant shall acknowledge that should the removal not occur in accordance with the plan, the bond shall be forfeited to the Town, which shall then utilize the funds to undertake or complete the decommissioning plan. The bond shall remain in effect until restoration of the property, as set forth in the decommissioning plan, is completed.