Before a tract of land may be considered for planned unit development, the developer(s) shall:
A. Preapplication Meeting: Meet with the town engineer to discuss the proposal prior to submission of any application;
B. Submittal Documents: Submit, prior to the development of an existing or proposed PUD within the town limits, the following to the town engineer:
1. A site plan application per requirements of section 8-3-9 of this title;
2. A written statement that shall contain, as a minimum, the following information:
a. An explanation of the objectives to be achieved by the planned unit development,
b. A list of the abutting owners of record and their addresses from available records,
c. A statement of architectural theme and building type, distinguishing the uses of single-family dwellings, multi-family dwellings, townhouses, condominiums, and commercial and industrial structures,
d. A program describing the uses and activities to be permitted within each area, including the following:
(1) The types, sizes, and mixture of dwelling units,
(2) The acreage or square footage of each use, including nonresidential parking, roadways, easements, rights of way, and recreational areas,
(3) The number of off street parking spaces,
(4) Any other applicable restrictions such as building setbacks, height limits, access, grades, or widths of roads,
(5) The overall density for the entire planned unit development, as well as the maximum density for each land use, excluding rights of way and easements,
(6) The proportion of land to be left in a natural condition as major open space or preserved areas, stated in terms of acreage or square footage, if any, as well as the ratio of open space in areas to be developed, stated on a square foot per unit basis,
(7) A written statement by a registered, professional engineer(s), which shall describe the following:
(A) The proposed method and arrangement for connecting to the municipal water system, and the projected usage and needs,
(B) The proposed method and arrangement for connecting to the municipal sewer system, and the projected usage and needs,
(C) The soil, geological, and groundwater conditions of the site; the manner in which storm drainage will be handled,
(8) If the PUD is to be developed in stages, a description of each stage and an estimated date of completion for each stage. Any change or alteration in the design of the PUD or completion, will require the owner to submit an amended plan in compliance with the most current rules and regulations adopted by the town;
C. Land Use Plan: For a PUD established at the time of annexation, the owner shall provide a land use plan supported by the estimated water consumption;
D. Subdivision Regulations: If the planned unit development is to be subdivided, the subdivision regulations of the town shall apply. If said regulations are precluded in any manner, through the use of townhouse or condominiums, appropriate platting shall be required and approved by the commission;
E. Required Information: All information hereinabove required shall be submitted to the town engineer. All submissions shall include:
1. All applicable data required by the subdivision regulations of the town,
2. All information required by section 8-3-9, "Site Plan Regulations", of this title. (Ord. 2012-1, 4-17-2012)