[Ord. #1354, S21A—2.1]
A permit shall be required to be obtained from the Zoning Officer for the following, same to be issued upon payment of the fee indicated:
a.
Residential.
1.
Nonresidential improvement: $15.00
2.
Accessory structure: $15.00
b.
Nonresidential:
4.
Change in use*: $50.00
* The type of change in use covered here is the type allowed within that same zone and not requiring a variance.
6.
Nonstructural improvement: $25.00