CONDITIONAL USES, SPECIAL EXCEPTIONS, AND EXPRESS STANDARDS AND CRITERIA
Permitted Increase (dBA) | Duration of Increase (minutes)* | |
|---|---|---|
5 | 15 | |
10 | 5 | |
15 | 1 | |
20 | 1 |
* | Cumulative minutes during any one hour. |
It is the purpose of these regulations to promote the safe, effective and efficient use of renewable energy systems to reduce the consumption of utility-supplied energy, heat, hot water, or any combination of the above, while protecting the health, safety and welfare of the residents of the Township, and while protecting adjacent land uses through appropriate zoning and land use controls. Non-utility-supplied energy systems not specified herein may be permitted subject to conditional use approval. Building-integrated systems shall not be subject to zoning approval. Where, in the course of reviewing a permit application for any renewable energy system, it is deemed advisable for the Township to retain the services of the Township Engineer or any other consultant, all reasonable costs therefor shall be borne by the applicant. |
CONDITIONAL USES, SPECIAL EXCEPTIONS, AND EXPRESS STANDARDS AND CRITERIA
Permitted Increase (dBA) | Duration of Increase (minutes)* | |
|---|---|---|
5 | 15 | |
10 | 5 | |
15 | 1 | |
20 | 1 |
* | Cumulative minutes during any one hour. |
It is the purpose of these regulations to promote the safe, effective and efficient use of renewable energy systems to reduce the consumption of utility-supplied energy, heat, hot water, or any combination of the above, while protecting the health, safety and welfare of the residents of the Township, and while protecting adjacent land uses through appropriate zoning and land use controls. Non-utility-supplied energy systems not specified herein may be permitted subject to conditional use approval. Building-integrated systems shall not be subject to zoning approval. Where, in the course of reviewing a permit application for any renewable energy system, it is deemed advisable for the Township to retain the services of the Township Engineer or any other consultant, all reasonable costs therefor shall be borne by the applicant. |