When yards are required abutting major and secondary highways and traffic collector streets, the yards shall be measured from the future highway right-of-way line established by the general plan for an existing right-of-way. Where yards are not required, the building shall be located on or to the rear of the future highway right-of-way line.
(1964 Code Appx. A § 10.30)