Site Plan Review
Minimum Driveway Spacing Standards Development Size in Peak Hour Trips (pht) | ||||
|---|---|---|---|---|
Type of Road | Small: 0 to 100 pht (feet) | Moderate: 101 to 200 pht (feet) | Large: 201 or greater pht (feet) | |
Major arterial | 330 | 440 | 660 | |
Collector | 220 | 330 | 440 | |
NOTES: | ||
1. | Peak hour trips (pht) should be based on full build-out of the parcel. | |
2. | The larger of the minimum driveway spacing standards for the proposed development or for existing developments at abutting properties will apply. Driveways for in-fill development must meet the larger of the minimum driveway spacing standards for development abutting properties on both sides. | |
Minimum Corner Clearance Requirements | ||
|---|---|---|
Type of Access | Minimum Clearance (feet) | |
For partial access, right turns in and/or out only | 100 | |
For full access, all directional movements | 220 | |
Site Plan Review
Minimum Driveway Spacing Standards Development Size in Peak Hour Trips (pht) | ||||
|---|---|---|---|---|
Type of Road | Small: 0 to 100 pht (feet) | Moderate: 101 to 200 pht (feet) | Large: 201 or greater pht (feet) | |
Major arterial | 330 | 440 | 660 | |
Collector | 220 | 330 | 440 | |
NOTES: | ||
1. | Peak hour trips (pht) should be based on full build-out of the parcel. | |
2. | The larger of the minimum driveway spacing standards for the proposed development or for existing developments at abutting properties will apply. Driveways for in-fill development must meet the larger of the minimum driveway spacing standards for development abutting properties on both sides. | |
Minimum Corner Clearance Requirements | ||
|---|---|---|
Type of Access | Minimum Clearance (feet) | |
For partial access, right turns in and/or out only | 100 | |
For full access, all directional movements | 220 | |