INDUSTRIAL DISTRICT
Agricultural products processing |
Antennas mounted on an existing public utility transmission tower, communications equipment buildings, existing building or other existing structure subject to § 27-1210 |
Bus stations |
Business offices |
Business services |
Contractor yards |
Crop production |
Forestry and forest reserves, fish and game refuges, and similar conservation uses |
Industry |
Lumberyards |
Manufacturing, light |
Office buildings |
Park and ride facilities |
Public and semipublic buildings and uses |
Recycling facilities |
Retail home heating fuel distributors |
Short-term rental in a single-family dwelling existing on or before January 27, 2023 (§ 27-1014) |
Single-family dwelling on a lot existing on or before the effective date of this chapter |
Small warehouse |
Subdivision of two residential lots meeting R-1 District requirements from any tract existing on or before the effective date of this chapter |
Storage yards for forest products and minerals |
Temporary construction buildings, which must be removed 30 days after the use ends |
Township buildings and uses |
Wholesale businesses |
Wineries, farm |
Adult businesses (§ 27-1201) |
Airports |
Application of sewage sludge or septage under permit from PADEP |
Auctions, vehicle and equipments |
Data storage center (§ 27-1242) |
Distribution centers/truck terminals (§ 27-1215) |
Gaming establishments (§ 27-1217) |
Heliports |
Helistops |
Industrial wastewater treatment facilities |
Large warehouse |
Mineral extraction (§ 27-1223) |
Mineral processing |
Natural gas processing plants |
Bulk fuel storage facilities |
Bus, limousine or taxi terminals |
Communications towers, antennas and communications equipment buildings (§ 27-1210) |
Composting facilities |
Pipeline compressor station, metering station or operation/maintenance |
Power plants |
Resource recovery facilities |
Solar commercial facility (§ 27-1236) |
Solid waste facilities (§ 27-1237) |
Water withdrawal facilities |
Lot Area and Lot Width for Newly Created Lots | ||
|---|---|---|
Use | All Types of Water and Sewage | |
Minimum Required | ||
Lot Area* (square feet) | Lot Width (feet) | |
All uses | 43,560 | 150 |
* | Additional lot area may be required if well testing, soil limitations for on-site sewage disposal, or other factors require the need for a larger lot. |
Lot Depth to Width Ratio for Newly Created Lots | |
|---|---|
All uses | 4 to 1 |
Setbacks for All Lots (except as modified by § 27-301) | |||
|---|---|---|---|
Front* (feet) | Side (feet) | Rear (feet) | |
All uses | 50 | 25 | 35 |
* |
Maximum Lot Coverage of Impervious Surfaces for All Lots | |
|---|---|
All uses | 75% of gross lot area |
Maximum Building Height (measured from the average finished grade of the ground immediately adjoining the building to the highest point of the roof except as modified by § 27-301) | |
|---|---|
All uses | Principal structures: 50 feet Accessory structures: 25 feet (not applicable to agricultural structures) |
INDUSTRIAL DISTRICT
Agricultural products processing |
Antennas mounted on an existing public utility transmission tower, communications equipment buildings, existing building or other existing structure subject to § 27-1210 |
Bus stations |
Business offices |
Business services |
Contractor yards |
Crop production |
Forestry and forest reserves, fish and game refuges, and similar conservation uses |
Industry |
Lumberyards |
Manufacturing, light |
Office buildings |
Park and ride facilities |
Public and semipublic buildings and uses |
Recycling facilities |
Retail home heating fuel distributors |
Short-term rental in a single-family dwelling existing on or before January 27, 2023 (§ 27-1014) |
Single-family dwelling on a lot existing on or before the effective date of this chapter |
Small warehouse |
Subdivision of two residential lots meeting R-1 District requirements from any tract existing on or before the effective date of this chapter |
Storage yards for forest products and minerals |
Temporary construction buildings, which must be removed 30 days after the use ends |
Township buildings and uses |
Wholesale businesses |
Wineries, farm |
Adult businesses (§ 27-1201) |
Airports |
Application of sewage sludge or septage under permit from PADEP |
Auctions, vehicle and equipments |
Data storage center (§ 27-1242) |
Distribution centers/truck terminals (§ 27-1215) |
Gaming establishments (§ 27-1217) |
Heliports |
Helistops |
Industrial wastewater treatment facilities |
Large warehouse |
Mineral extraction (§ 27-1223) |
Mineral processing |
Natural gas processing plants |
Bulk fuel storage facilities |
Bus, limousine or taxi terminals |
Communications towers, antennas and communications equipment buildings (§ 27-1210) |
Composting facilities |
Pipeline compressor station, metering station or operation/maintenance |
Power plants |
Resource recovery facilities |
Solar commercial facility (§ 27-1236) |
Solid waste facilities (§ 27-1237) |
Water withdrawal facilities |
Lot Area and Lot Width for Newly Created Lots | ||
|---|---|---|
Use | All Types of Water and Sewage | |
Minimum Required | ||
Lot Area* (square feet) | Lot Width (feet) | |
All uses | 43,560 | 150 |
* | Additional lot area may be required if well testing, soil limitations for on-site sewage disposal, or other factors require the need for a larger lot. |
Lot Depth to Width Ratio for Newly Created Lots | |
|---|---|
All uses | 4 to 1 |
Setbacks for All Lots (except as modified by § 27-301) | |||
|---|---|---|---|
Front* (feet) | Side (feet) | Rear (feet) | |
All uses | 50 | 25 | 35 |
* |
Maximum Lot Coverage of Impervious Surfaces for All Lots | |
|---|---|
All uses | 75% of gross lot area |
Maximum Building Height (measured from the average finished grade of the ground immediately adjoining the building to the highest point of the roof except as modified by § 27-301) | |
|---|---|
All uses | Principal structures: 50 feet Accessory structures: 25 feet (not applicable to agricultural structures) |