A building permit may be issued for a model home upon approval and recording of a final plat, provided that:
A. The number of model homes within the final plat shall not exceed:
1. Prior to completion of public infrastructure improvements provided that at least a maintainable Class 5 aggregate base, structurally sufficient to allow public safety access to each building site approved by the City Engineer is installed prior to issuance of a building permit:
a. One (1) building per homebuilder or the following, whichever is greater:
(1) Plats with less than forty (40) lots:
(a) Two (2) single family or detached townhouse buildings.
(b) One (1) two family or townhouse building.
(2) Plats with forty (40) lots or more:
(a) Three (3) single family or detached townhouse buildings.
(b) One (1) two family or townhouse building.
b. Construction of more than one (1) model home building allowed under this subsection shall require the buildings be located on abutting lots.
2. After completion of public infrastructure improvements, including a first lift of asphalt, approved by the City Engineer:
a. Single family or detached townhouse dwellings: Three (3) buildings or ten percent (10%) of the single family or detached townhouse lots within the final plat, whichever is greater.
b. Two family or townhouse dwellings: Six (6) units or 10 percent (10%) of the total number of attached units within the final plat, whichever is greater.
B. No certificate of occupancy shall be issued for a model home until the public infrastructure improvements including the first lift of asphalt have been completed and approved by the City Engineer. (Ord. 979, 5-15-2017; amd. Ord. passed 8-4-2025)