In addition to other uses specifically identified elsewhere in this title, the following are conditional uses in an RS-4 district and require a conditional use permit based upon procedures set forth in and regulated by chapter 4 of this title. Additionally, besides the specific standards and criteria which may be cited below for respective conditional uses, each request for a conditional use permit shall be evaluated based upon the standards and criteria set forth in subsection 11-4-3E and section 11-4-7 of this title.
A. Daycare facilities as a principal or an accessory use, except as provided for by this chapter, provided that the use complies with the provisions of chapter 31 of this title.
B. Essential services involving transmission pipelines and transmission or substation lines in excess of thirty three (33) kV and up to one hundred (100) kV, as regulated by chapter 26 of this title.
D. Government buildings and structures; public or quasi-public or private recreational buildings and neighborhood or community centers; public and private educational institutions limited to accredited elementary, middle or junior high and senior high school; and religious institutions such as churches, chapels, temples, and synagogues provided that side yards shall be double that required for the district, but no greater than thirty feet (30').
E. Parks and recreational areas owned or operated by public bodies; other than the city of Lakeville.
F. Personal wireless service antennas not located on a public structure, or existing tower as regulated by chapter 30 of this title.
G. Religious institutions, provided that:
1. Minimum side yards shall be double that required for the district, but no greater than thirty feet (30').
2. Dwelling in micro units within a sacred community shall be allowed subject the provisions of section 11-33-7 of this title.
H. Single-family detached dwellings; reduction of minimum lot area and width requirements, provided that:
1. Not more than thirty five (35) percent of the lots within the preliminary plat shall have a lot area or width less than the minimums required by Section 11-53-13 of this title.
2. The preliminary plat shall have direct access via minor collector or local streets to an arterial or major collector street as defined by the Comprehensive Plan.
3. Sewer and water utility capacity consistent with the Comprehensive Plan is sufficient and available to accommodate the preliminary plat, subject to review and approval of the City Engineer.
4. The subdivision design shall provide for a curvilinear form of street layout, opposed to a grid pattern, based on consideration for natural and man-made barriers to organize lots and blocks, minimize through traffic, and calm traffic speeds.
5. Lots less than the minimum area and width required by Section 11-53-13
of this title shall comply with the following, subject to additional requirements, exceptions, and modifications set forth in this title:
I. Social services or other activities which are not directly worship related as an accessory use within a religious institutional building(s). (Ord. 867, sec. 98, 5-17-2010; amd. Ord. 1089, secs. 35 - 37, 5-6-2024; Ord. passed 8-4-2025)