search icon

Vicksburg City Zoning Code

ARTICLE XII

Procedures and Processes

§ 475-12.01 Purpose.

The purpose of this article is to provide procedures and related standards for the processing of all requests for Village action or review under the provisions of this chapter.

§ 475-12.02 Zoning Permit.

Interior construction work shall not require a Zoning Permit. For activities requiring Site Plan Approval, the Site Plan Approval shall be considered the Zoning Permit. Alterations to the exterior of a building that do not alter the footprint, or the height of the building shall be exempt from the Zoning Permit requirement.

§ 475-12.03 Site plan review/process.

A. 
Intent. The site plan review procedures, standards, and required information in this section are intended to provide a consistent and uniform method of review of proposed development plans, to ensure full compliance with the regulations and standards contained in this chapter and other applicable ordinances and laws, including the Michigan Building Code, as amended, to achieve efficient use of the land, to protect natural resources, and to prevent adverse impact on adjoining or nearby properties. It is the intent of these provisions to encourage cooperation and consultation between the Village and applicant so as to facilitate development in accordance with the Village's land use objectives.
B. 
Site plan required.
(1) 
Site plan required. Site plan approval shall be required for the development of any new use, the construction of any new structures, any change to the footprint or height of an existing structure, and all other building or development activities, with the exception of the following activities, when they do not accompany an activity that requires site plan approval:
(a) 
Erecting, moving, relocating, expanding, or altering the footprint or height of a single-unit and two-unit home, which shall require only approval of a Building Permit issued by the Building Official.
(b) 
Erecting, moving, relocating, expanding, or structurally altering an accessory structure on any lot, which shall require only approval of a Building Permit by the Building Official. This exemption shall not apply to accessory structures designed for a use that requires Special Use approval.
(c) 
Construction of a fence or wall on a site, which shall require only approval of a Building Permit by the Building Official. Fences less than six feet in height may not require a Building Permit.
(d) 
Expansion of off-street parking (on a lot containing a use other than a single family home) involving 20 or fewer spaces, which shall require only approval of a Zoning Permit by the Zoning Administrator. Expansions of parking involving 21 or more spaces shall require Site Plan Approval.
(e) 
Construction involving only interior improvements where there is no change in use.
C. 
Administrative review.
(1) 
In lieu of site plan review conducted by the Planning Commission, the Zoning Administrator or designee, may review and approve, deny, or approve with conditions, site plans, or minor amendments to approved site plans if:
(a) 
Such plans relate to an expansion of an existing permitted use but does not propose substantial deviations to the site plan as approved by the Planning Commission. A substantial deviation may include the creation of new parking areas, and changes to site circulation.
(b) 
Such plans propose a change from one permitted use to another permitted use.
(c) 
The proposed modification involves the expansion of a principal building by no more than 50% of the existing building's footprint, or 5,000 square feet, whichever is less.
(d) 
Such plan is a new site plan relating to a special land use and the Planning Commission at the time of granting special land use approval specified that site plan review of the special land use could be conducted by the Zoning Administrator.
(e) 
Such plan is an amendment to a site plan for an existing special land use and:
[1] 
There is no proposed change in use.
[2] 
Such amended plan satisfies all the conditions originally attached to special land use approval.
D. 
Site plan review applications and procedures.
(1) 
Submission of site plan for formal review. In order to initiate formal review by the Planning Commission, the applicant is required to submit the materials listed below, as well as all required fees, to the Village. Electronic submission is permitted.
(2) 
Distribution of plans. Upon submission of all required application materials, the site plan proposal shall be reviewed by responsible agencies (planning and zoning, engineering, fire, etc.). Once the application material has been determined to be complete and accurate, it may be placed before the Planning Commission for further review. The site plans and application shall be distributed to appropriate officials for review.
E. 
Review and final action.
(1) 
Planning commission review. The Planning Commission shall review the site plan proposal and any requested reports and recommendations from the Zoning Administrator and/or reviewing agencies. The Planning Commission shall then make a final decision, based on the requirements and standards of this chapter. The Planning Commission may approve, approve with conditions, deny, or they may table the proposal, as noted below.
(a) 
Approval. Upon determination that a site plan is in compliance with the standards and requirements of this chapter and other applicable ordinances and laws, the Planning Commission shall approve the site plan.
(b) 
Approval subject to conditions. Upon determination that a site plan is in compliance except for minor modifications, the Planning Commission may impose reasonable conditions upon approval of the site plan. The conditions for approval shall be identified and the applicant shall be given the opportunity to correct the site plan. The conditions may include, but need not be limited to, the need to obtain variances, obtain approvals from other agencies, or obtain Special Land Use approval.
[1] 
The applicant shall submit a revised plan with a revision date indicating compliance with the conditions. The applicant must re-submit the site plan to the Planning Commission for final approval after conditions have been met, unless the Planning Commission waives its right to review the revised plan, and instead authorizes the Zoning Administrator to review and approve the site plan after all required conditions have been addressed.
(c) 
Denial. Upon determination that a site plan does not comply with the standards and regulations set forth in this article or elsewhere in this chapter, or requires extensive revision in order to comply with said standards and regulations, the Planning Commission shall deny the site plan and provide specifics as to why the plan has been denied.
(d) 
Tabling. Upon determination that a site plan is not ready for approval or rejection, or upon a request by the applicant, the Planning Commission may table consideration of a site plan until a later meeting.
(2) 
Time period for obtaining approval. An applicant shall have a maximum of 18 months from the date of submitting a site plan for formal review to achieve final approval of the site plan, including compliance with all conditions. If approval is not achieved within this period, the application becomes null and void and a new application is required to pursue site plan review further.
(3) 
Recording of site plan review action. Each action taken with reference to a site plan review shall be duly recorded in the minutes of the Planning Commission. The grounds for action taken upon each site plan shall also be recorded in the minutes.
(4) 
Procedure after site plan approval.
(a) 
Application for building permit. Following final approval of the site plan and the engineering plans, the applicant may apply for a building permit from the Building Department. It shall be the responsibility of the applicant to obtain all other applicable Village, county, state, or federal permits prior to issuance of a building permit.
(b) 
Expiration of site plan approval. If construction has not commenced, or if the project has commenced but has not made reasonable progress, within 18 months after final approval of the site plan, the site plan approval expires and a new application for site plan review shall be required. However, the applicant may apply in writing to the Planning Commission for an extension of site plan approval. The Planning Commission may grant one or more extensions of up to a total of 18 months upon request from the applicant prior to expiration of the previous approval and provided that it finds that the approved site plan adequately represents current conditions on and surrounding the site and provided that the site plan conforms to current Zoning Ordinance standards.
(c) 
Property maintenance after approval. It shall be the responsibility of the owner of a property for which site plan approval has been granted to maintain the property in accordance with the approved site design on a continuing basis until the property is razed, or until new zoning regulations supersede the regulations upon which site plan approval was based, or until a new site design is approved. Any property owner who fails to so maintain an approved site design shall be deemed in violation of the use provisions of this chapter and shall be subject to the same penalties appropriate for a use violation.
[1] 
With respect to condominium projects, the Master Deed shall contain provisions describing the responsibilities of the condominium association, condominium owners, and public entities, with regard to maintenance of the property in accordance with the approved site plan on a continuing basis. The Master Deed shall further establish the means of permanent financing for required maintenance and improvement activities which are the responsibility of the condominium association. Failure to maintain an approved site plan shall be deemed in violation of the use provisions of this chapter and shall be subject to the same penalties appropriate for a use violation.
(5) 
Site plan violation. In the event that construction is not in compliance with the approved plans, the Zoning Administrator or his/her designee shall take corrective action, unless a revised site plan is submitted for Village review. If the builder or developer fails to take corrective action or pursue approval of an amended site plan, the Zoning Administrator or his/her designee may issue a citation, after which the Village Council may commence and pursue appropriate action in a court having jurisdiction.
(6) 
Modification to approved plan. Modifications to an approved site plan shall be reviewed by, and may be approved by, the Zoning Administrator. The Zoning Administrator may determine that the requested revisions are substantial enough that a new site plan approval process, as described in this chapter, is required, and refer the site plan to the Planning Commission.
Each action related to modification of a site plan shall be duly recorded in writing on a copy of the approved plan and shall be kept on file at Village Hall. The Planning Commission shall be advised of all minor site plan modifications approved by the Zoning Administrator.
F. 
Required information on site plans. The following information shall be included on all site plans, where applicable. The Planning Commission or Zoning Administrator shall have the jurisdiction to waive any of these requirements upon determining that it does not apply to the site or that there are practical difficulties of a non-monetary nature in obtaining the information. Should requirement(s) be waived, a synopsis of which requirement(s) to be waived and the determination of such decision shall be submitted with the site plan review documentation.
(1) 
Application form. The application form shall contain the following information:
(a) 
Applicant's name and address.
(b) 
Name, address and signature of property owner, if different from applicant.
(c) 
Common description of property and complete legal description, including the tax identification number.
(d) 
Dimensions of land and total acreage.
(e) 
Existing zoning of applicant's parcel and surrounding land.
(f) 
Existing use of the applicant's parcel.
(g) 
Proposed use of land and name of proposed development, if applicable.
(h) 
Proposed buildings to be constructed, including square feet of gross and usable floor area.
(i) 
Proof of property ownership.
(j) 
Number of permanent employees, if applicable.
(k) 
Names, addresses, and telephone numbers of engineers, attorneys, architects, and other professionals associated with the project.
(l) 
Review comments and/or approvals from county, state, and federal agencies. Copies of letters or approval forms should be submitted with the site plan application.
(m) 
The Zoning Administrator may waive requirements listed above, subject to providing documentation of reasoning for waiving said requirement(s) to the Planning Commission.
(2) 
Descriptive and identification data. Site plans shall consist of an overall plan for the entire development, drawn to a scale of not less than one inch = 20 feet for property less than one acre, one inch = 30 feet for property larger than one acre but less than three acres, and one inch = 50 feet for property larger than three acres, unless another scale is approved by the Zoning Administrator. Sheet size shall be at least 24 inches by 36 inches. The following descriptive and identification information shall be included on any site plans.
(a) 
Applicant's name and address, and telephone number.
(b) 
Title block indicating the name of the development.
(c) 
Scale.
(d) 
Northpoint.
(e) 
Dates of submission and revisions (month, day, and year).
(f) 
Location map drawn to scale with north point.
(g) 
Legal and common description of property, including acreage.
(h) 
The dimensions of all lots and property lines, showing the relationship of the site to abutting properties. If the site is a part of a larger parcel the plan should indicate the boundaries of total land holding.
(i) 
A schedule for completing the project, including the phasing, or timing of all proposed developments.
(j) 
Identification and seal of the architect, engineer, land surveyor, or landscape architect who prepared or supervised and approved the plan.
(k) 
Written description of proposed land use.
(l) 
Zoning classification of applicant's parcel and all abutting parcels.
(m) 
Proximity to driveways serving adjacent parcels.
(n) 
Proximity to section corner and major thoroughfares.
(o) 
Notation of any variances that have or must be secured.
(p) 
Net acreage (minus rights-of-way) and total acreage, to the nearest 1/10 acre.
(3) 
Site data. The Zoning Administrator may determine that any of the following required elements are not relevant to a given site plan and waive the requirement.
(a) 
Existing lot lines, building lines, structures, parking areas, and other improvements on the site and within 100 feet of the site.
(b) 
Front, side, and rear setback dimensions.
(c) 
Topography on the site and within 100 feet of the site at two-foot contour intervals, referenced to a U.S.G.S. benchmark.
(d) 
Existing and proposed site features, including buildings, roadway widths and names, and parking areas.
(e) 
Existing structures within 50 feet of the subject property.
(f) 
Dimensions and centerlines of existing and proposed roads and road rights-of-way, and acreage of proposed roads and road rights-of-way.
(g) 
Acceleration, deceleration, and passing lanes, where required.
(h) 
Proposed vehicular circulation system, including location of driveway entrances, roads, and on-site driveways.
(i) 
Typical cross-section of proposed roads and driveways.
(j) 
Location of existing drainage courses, floodplains, lakes, and streams, with elevations, and acreage of bodies of water.
(k) 
Boundaries of all wetland areas, with sufficient dimensions between various points on the wetland boundary and buildings, property lines, or other features to allow accurate portrayal of the wetlands. The acreage shall be provided separately for all wetlands, and wetlands regulated by the state shall be identified. Wetlands staking and identification shall be done by a qualified wetlands expert (who must be approved by the Village). If deemed necessary because of site or soil conditions or because of the scope of the project, a detailed hydrology study may be required.
(l) 
Location of existing and proposed interior sidewalks and sidewalks in the road right-of-way.
(m) 
Exterior lighting locations and method of shielding lights from shining off the site.
(n) 
Trash and recycling receptacle locations and method of screening.
(o) 
Transformer pad location and method of screening, if applicable.
(p) 
Parking spaces, typical dimensions of spaces, indication of total number of spaces, drives, and method of surfacing.
(q) 
Information needed to calculate required parking in accordance with Zoning Ordinance standards.
(r) 
The location of lawns and landscaped areas, including required landscaped greenbelts.
(s) 
Landscape plan, including location, size, type and quantity of proposed shrubs, trees and other live plant material.
(t) 
Location, sizes, and types of existing trees five inches or greater in diameter, measured at one foot off the ground, before and after proposed development.
(u) 
Cross-section of proposed berms.
(v) 
Location and description of all easements for public rights-of-way, utilities, access, shared access, and drainage.
(w) 
Designation of fire lanes.
(x) 
Loading/unloading area.
(y) 
The location of any outdoor storage of materials and the manner by which it will be screened.
(z) 
Indicate locations of steep slopes.
(4) 
Building and structure details. The Zoning Administrator may determine that any of the following required elements are not relevant to a given site plan and waive the requirement.
(a) 
Location, height, and outside dimensions of all proposed buildings or structures.
(b) 
Building floor plans.
(c) 
Total floor area.
(d) 
Location, size, height, and lighting of all proposed signs.
(e) 
Proposed fences and walls, including typical cross-section and height above the ground on both sides.
(f) 
Building facade elevations, drawn to a scale of one inch equals four feet, or another scale approved by the Zoning Administrator and adequate to determine compliance with the requirements of this chapter. Elevations of proposed buildings shall indicate type and color of exterior building materials, roof design, projections, canopies, awnings and overhangs, screen walls and accessory buildings, and any outdoor or roof-located mechanical equipment, such as air conditioning units, heating units, and transformers.
(5) 
Information concerning utilities, drainage, and related issues. The Zoning Administrator may determine that any of the following required elements are not relevant to a given site plan and waive the requirement.
(a) 
Schematic layout and description of existing and proposed sanitary sewers, sewage treatment systems, and/or septic systems; water mains, well sites, and water service leads; hydrants that would be used by public safety personnel to service the site; storm sewers and drainage facilities, including the location of retention/detention facilities; and the location of gas, electric, and telephone lines.
(b) 
Layout and description of telecommunications infrastructure.
(c) 
Indication of site grading and drainage patterns.
(d) 
Types of soils and location of floodplains and wetlands, if applicable.
(e) 
Soil erosion and sedimentation control measures.
(f) 
Proposed finish grades on the site, including the finish grades of all buildings, driveways, walkways, and parking lots.
(g) 
Assessment of potential impacts from the use, processing, or movement of hazardous materials or chemicals, if applicable.
(h) 
Assessment of potential impact on groundwater, including but not limited to quality, quantity, and recharge.
(i) 
All utilities shall be located underground within the boundaries of a proposed development, including but not limited to gas, electric, telephone and cable television service leads.
(6) 
Information concerning residential development.
(a) 
The number, type and location of each type of residential unit (one bedroom units, two bedroom units, etc.).
(b) 
Density calculations by type of residential unit (dwelling units per acre).
(c) 
Lot coverage calculations.
(d) 
Floor plans of typical buildings with square feet of floor area.
(e) 
Garage and carport locations and details, if proposed.
(f) 
Pedestrian circulation system.
(g) 
Location and names of roads and internal drives with an indication of how the proposed circulation system will connect with the existing adjacent roads.
(h) 
Community building locations, dimensions, floor plans, and facade elevations, if applicable.
(i) 
Swimming pool fencing detail, including height and type of fence, if applicable.
(j) 
Location and size of recreation open areas.
(k) 
Indication of type of recreation facilities proposed for recreation area.
(l) 
If common area or community buildings are proposed, then the site plan should indicate the responsibilities of the subdivision or condominium association, property owners, or other public entity, with regard to maintenance of the common areas or community property on a continuing basis.
(7) 
Information applicable to mobile home parks.
(a) 
Location and number of pads for mobile homes.
(b) 
Distance between mobile homes.
(c) 
Proposed placement of mobile home on each lot.
(d) 
Average and range of size of mobile home lots.
(e) 
Density calculations (dwelling units per acre).
(f) 
Lot coverage calculations.
(g) 
Garage and carport locations and details, if proposed.
(h) 
Pedestrian circulation system.
(i) 
Location and names of roads and internal drives.
(j) 
Community building location, dimensions, floor plans, and facade elevations, if applicable.
(k) 
Swimming pool fencing detail, including height and type of fence, if applicable.
(l) 
Location and size of recreation open areas.
(m) 
Indication of type of recreation facilities proposed for recreation area.
(8) 
Additional information.
(a) 
Information related to condominium development. The following information shall be provided with all site plans involving condominium development:
[1] 
Condominium documents, including the proposed master deed, condominium bylaws, and condominium subdivision plan.
[2] 
Condominium subdivision plan requirements, as specified in the Condominium Rules promulgated by the Department of Licensing and Regulatory Affairs, Bureau of Commercial Services and Corporations, or successor agency.
(b) 
Items not applicable. If any of the items listed are not applicable to a particular site, the following information should be provided on the site plan, or accompanying the site plan:
[1] 
A list of each item considered not applicable.
[2] 
The reason(s) why each listed item is not considered applicable.
(c) 
Other data that may be required. Other data may be required if deemed necessary by the Village administrative officials or Planning Commission to determine compliance with the provisions in this chapter. Such information may include, but need not be limited to, traffic studies, market analysis, environmental assessment and evaluation of the demand for public facilities and services.
G. 
Standards for site plan approval. The following criteria shall be used as a basis upon which site plans will be reviewed and approved. The Planning Commission shall approve a site plan only if it conforms to all of the following standards.
(1) 
Adequacy of information. The site plan shall include all required information in sufficiently complete and understandable form to provide an accurate description of the proposed uses and structures.
(2) 
Site design characteristics. All elements of the site design shall be harmoniously and efficiently organized in relation to topography, the size and type of parcel, the character of adjoining property, and the type and size of buildings. The site shall be developed so as not to impede the normal and orderly development or improvement of surrounding property for uses permitted by this chapter.
(3) 
Compliance with district requirements. The site plan shall comply with the district requirements for minimum floor space, height of building, lot size, open space, density and all other requirements set forth in the schedule of regulations unless otherwise provided in this chapter.
(4) 
Emergency vehicle access. All buildings or groups of buildings shall be so arranged as to permit convenient and direct emergency vehicle access.
(5) 
Ingress and egress. Every structure or dwelling unit shall be provided with adequate means of Ingress and egress via public or private streets.
(6) 
Exterior lighting. Exterior lighting shall be designed so that it is focused downward and deflected away from adjoining properties and so that it does not impede vision of drivers along adjacent streets.
(7) 
Public services. Adequate services and utilities, including water, sewage disposal, sanitary sewer, and stormwater control services, shall be available or provided, and shall be designed with sufficient capacity and durability to properly serve the development. All streets and roads, water, sewer, and drainage systems, and similar facilities shall conform to the design and construction standards of the Village or county, as appropriate.
(8) 
Screening. Off-street parking, loading and unloading areas, outside refuse storage areas, and other storage areas that are visible from adjacent homes or from public roads, shall be screened by walls or landscaping of adequate height and shall comply with this chapter.
(9) 
Coordination with adjacent sites. All site features, including circulation, parking, building orientation, landscaping, lighting, utilities, common facilities, and open space shall be coordinated with adjacent properties.
(10) 
Modifications. Given the ever-changing nature of technology, uses and design standards, the Planning Commission shall have the ability to modify the requirements and provisions of this article and accept a less restrictive standard, subject to the applicant providing justification for such modifications.

§ 475-12.04 Special Land Uses.

A. 
Intent. The procedures and standards in this section are intended to provide a consistent and uniform method for review of proposed plans for Special Land Uses (sometimes also referred to as Special Uses). Special Land Uses are uses, either public or private, which possess unique characteristics and therefore cannot be properly classified as a permitted use in a particular zoning district. This section contains standards for review of each Special Land Use proposal individually on its own merits to determine if it is an appropriate use for the district and specific location where it is proposed.
B. 
Procedures and requirements. Special Land Use proposals shall be reviewed in accordance with the procedures for site plan review, as follows:
(1) 
Public hearing required. A public hearing shall be scheduled by the Village and held by the Planning Commission, with notice as required by the Michigan Enabling Act, before a decision is made on a Special Land Use request.
(2) 
Planning commission action. The Planning Commission shall review the application for Special Land Use together with the public hearing findings and reports and recommendations from the Zoning Administrator, Village Public Safety officials, and other reviewers. The Planning Commission may approve, approval with conditions, or deny the Special Land Use application as follows:
(a) 
Approval. Upon determination by the Planning Commission that the final plan for Special Land Use is in compliance with the standards and requirements of this chapter and other applicable ordinances and laws, the Planning Commission shall approve the Special Land Use.
(b) 
Approval with conditions. The Planning Commission may impose reasonable conditions upon the approval of a Special Land Use, to the extent authorized by law, for the purposes of insuring that public services and facilities affected by the proposed development will be capable of accommodating increased public service loads caused by the development, protecting the natural environment and conserving natural resources and energy, insuring compatibility with adjacent uses of land, and promoting the use of land in a socially and economically desirable manner. Conditions imposed shall be designed to protect natural resources and the public health, safety and welfare of individuals in the development and those immediately adjacent, and the community as a whole. Conditions imposed shall also be necessary to meet the intent and purpose of this chapter.
(c) 
Denial. Upon determination by the Planning Commission that a Special Land Use proposal does not comply with the standards and regulations set forth in this chapter, or otherwise would be injurious to the public health, safety, welfare, and orderly development of the Village, the Planning Commission shall deny the Special Land Use.
(3) 
Recording of action. Each action taken with respect to a Special Land Use shall be duly recorded in the minutes of the Planning Commission. The minutes shall record the findings of fact relative to each Special Land Use proposal, the grounds for the action taken, and any conditions imposed in conjunction with approval.
(4) 
Effect of approval. Upon approval, a Special Land Use shall be deemed a conforming use permitted in the district in which it is proposed, subject to any conditions imposed and final approval of the site plan. Such approval shall affect only the lot or portion thereof on which the proposed use is located. Such approval shall remain valid regardless of change of ownership.
(5) 
Zoning Board of Appeals authority. The Zoning Board of Appeals shall not have the authority to consider an appeal of a decision concerning a Special Land Use proposal. The ZBA shall have the authority to consider variances associated with a Special Land Use that relate to specific requirements of this chapter, but not to the approval or denial or imposition of conditions regarding the Special Use as a whole.
(6) 
Application for a building permit. Prior to issuance of a building permit, the applicant shall submit proof of the following:
(a) 
Final approval of the Special Land Use application.
(b) 
Final approval of the site plan.
(c) 
Final approval of the engineering plans.
(d) 
Acquisition of all other applicable Village, county, or state permits.
(7) 
Expiration of Special Land Use approval. If construction has not commenced, or if the project has commenced but has not made reasonable progress within 18 months after final approval, the approval becomes null and void and a new application for Special Land Use approval shall be required. However, the applicant may apply in writing to the Planning Commission for an extension of Special Land Use approval. The Planning Commission may grant one or more extensions of up to a total of 18 months, upon request from the applicant prior to expiration of the previous approval and provided that it finds that the approved Special Land Use plan conforms to current Zoning Ordinance standards.
(8) 
Modification to approved Special Land Use. Special Land Use approval in accordance with provisions of this section may subsequently be modified, subject to a revised application being submitted, including payment of a fee, which shall be equal to half the fee for the original approval, notice provided to the public as required for all Special Use applications, and subject to the following requirements:
(a) 
Modifications that do not change the nature of the use or that do not affect the intensity of use may be reviewed and approved following normal site plan review procedures. In evaluating change in intensity of use, the Planning Commission shall consider the extent of increase of vehicular or pedestrian traffic, the change in demand for public services, extent to which the total floor area occupied by the proposed use will increase, increased demand for parking, off-site impacts from noise, fumes, drainage, etc., and similar considerations.
(b) 
Modifications that change the nature of the use or that result in an increase in the intensity of the use shall be reviewed in the same manner as a new Special Land Use proposal, following the procedures in this section.
(9) 
Special land use violation. In the event that construction or subsequent use is not in compliance with the approved Special Land Use application, the Zoning Administrator or his/her designee shall take corrective action, unless a revised Special Land Use application is submitted for Village review, following the normal Special Land Use review procedures. If the builder, developer, or current user fails to take corrective action or pursue approval of an amended plan, the Zoning Administrator or his/her designee may issue a citation, after which the Village Council may commence and pursue appropriate action in a court having jurisdiction.
(10) 
Performance guarantee. The Planning Commission may require that a performance guarantee be deposited with the Village to ensure faithful completion of the improvements.
C. 
Standards for granting Special Land Use approval. Approval of a Special Land Use proposal shall be based on the determination that the proposed use will be consistent with the intent and purposes of this chapter, will comply with all applicable requirements of this chapter, and the following standards:
(1) 
Compatibility with adjacent uses. The proposed Special Land Use shall be designed, constructed, operated and maintained to be compatible with uses on surrounding land. The site design of the proposed Special Land Use shall minimize the impact of site activity on surrounding properties. In determining whether this requirement has been met, consideration shall be given to:
(a) 
The location and screening of vehicular circulation and parking areas in relation to surrounding development.
(b) 
The location and screening of outdoor storage, outdoor activity or work areas, and mechanical equipment in relation to surrounding development.
(c) 
The hours of operation of the proposed use. Approval of a Special Land Use may be conditioned upon operation within specified hours considered appropriate to ensure minimal impact on surrounding uses.
(d) 
The bulk, placement, and materials of construction of the proposed use in relation to surrounding uses.
(e) 
Proposed landscaping and other site amenities. Additional landscaping over and above the requirements of this chapter may be required as a condition of approval of a Special Land Use.
(2) 
Compatibility with the Master Plan. The request satisfies the goals, objectives, narrative, and intent of the Village Master Plan.
(3) 
Public services. The proposed Special Land Use shall be located so as to be adequately served by essential public facilities and services, such as highways, roads, police and fire protection, drainage systems, water and sewage facilities, and schools, unless the proposal contains an acceptable plan for providing necessary services or evidence that such services will be available by the time the Special Land Use is established.
(4) 
Impact of traffic. The arrangement of public and common ways for vehicular and pedestrian circulation shall respect the pattern of existing or planned streets or pedestrian or bicycle pathways in the vicinity of the site. The width of streets shall be appropriate for the volume of traffic they will carry, based on Kalamazoo County Road Commission standards. In order to insure public safety and promote efficient traffic flow and turning movements, the applicant may be required to limit street access points, construct a secondary access road, install traffic controls or signage, or otherwise modify the circulation plan.
(5) 
Detrimental effects. The proposed Special Land Use shall not involve any activities, processes, materials, equipment, or conditions of operation, and shall not be located or designed so as to be detrimental or hazardous to persons or property or to public health, safety, and welfare. In determining whether this requirement has been met, consideration shall be given to the level of traffic, noise, vibration, smoke, fumes, odors, dust, glare, and light.
(6) 
Compatibility with natural environment. The proposed Special Land Use shall be compatible with the natural environment and conserve natural resources and energy.

§ 475-12.05 Decommissioning Plans.

A. 
Intent. The intent of this provision is to protect the Village from potentially adverse impacts of specific special land uses, should such be abandoned and/or vacated. The Village, to protect the health, safety and welfare of the community, may require a Decommissioning Plan (Agreement) in conjunction with site plan review approval and/or special land use review approval.
B. 
Authority. The Village of Vicksburg Planning Commission shall have the authority to require a Decommissioning Plan (Agreement) as part of site plan and/or special land use approval. The Village Manager, or designee, Village Clerk, Village President, Zoning Administrator and Planning Commission Chair shall be tasked with overseeing the Decommissioning Plan (Agreement).
C. 
General provisions. The Decommissioning Plan (Agreement) shall contain the following elements.
(1) 
Recording. The Decommissioning Plan (Agreement) shall be in a form recordable at the Kalamazoo County Register of Deeds.
(a) 
Such Plan shall be executed and recorded upon issuance of a building permit or if a building permit is not required, within 14 days prior to commencement of construction. A proposed draft of the Decommissioning Plan shall be provided to the Village within 30 days after site plan approval and/or special land use approval.
(2) 
Life of project. State the anticipated life of the project.
(3) 
Cost. Describe the estimated decommissioning costs in current dollars and provide that this figure will be updated every third-year after commercial operation of the facility/use. For the purpose of this provision, salvage value shall not be considered when determining decommissioning costs.
(4) 
Conditions. Define the conditions upon which decommissioning will be initiated (example: end of lease; vacant use for 18 months, etc.).
(5) 
Removal. State that all equipment, structures, fencing, roads, foundations and other non-natural improvements will be removed to a depth of four feet by the end of the decommissioning period.
(6) 
Restoration. Require property to be restored as near as reasonably possible to the condition it was in prior to the development of the facility/use.
(7) 
Timeline. Describe the timeframe for completion of decommissioning activities; however, such decommissioning shall be completed within 12 months of determination by the Village that the structure/facility is no longer being maintained in an operable state of good repair, unless the current responsible party provides substantial evidence to the Planning Commission of the intent to maintain and reinstate operations of the structure/facility.
(8) 
Agreement: Describe any agreement (example: lease) with the landowner/property owner regarding decommissioning.
(9) 
Responsible party. State the party currently responsible for decommissioning.
(10) 
Updates. Describe any plans or circumstances requiring an update of the decommissioning plan.
D. 
Financial assurance. The Decommissioning Plan shall include financial assurance in the form of either a bond, irrevocable letter of credit, or escrow balance, but excluding cash. The amount of the financial assurance shall not be less than the estimated cost of decommissioning the structure/facility. Salvage value shall not be included in the estimated cost of decommissioning. The financial assurance must be posted in full before the start of commercial operation and continuously maintained for the period of the life of the structure/facility. The Village must be notified in writing at least 45 days before the bond or other financial surety is set to expire. Failure to provide proper notification and updated bond information is a violation of this chapter.

§ 475-12.06 Variances and Appeals.

A. 
Intent. The purpose of this section is to provide guidelines and standards to be followed by the Zoning Board of Appeals (ZBA) to act on matters where this chapter or state law gives jurisdiction to the ZBA.
B. 
Authority of the Zoning Board of Appeals.
(1) 
General authority. The Zoning Board of Appeals (ZBA) shall have the authority to act on those matters where this chapter provides for administrative review/appeal, interpretation, or special approval/appeal, and shall have authority to authorize a variance as defined in this chapter and the laws of the State of Michigan. Such authority shall be subject to the rules and standards in this section. The ZBA shall not have the authority to alter or change zoning district classifications of any property, nor to make any change in the text of this chapter. The ZBA has no authority to grant variances to overturn decisions involving Special Land Uses or planned unit developments. The Village Council may require fees to cover the reasonable costs of ZBA processes.
(2) 
Administrative review. The ZBA shall have authority to hear and decide appeals where it is alleged that there is an error in an order, requirement, permit, decision, or refusal made by an official, board or commission in carrying out or enforcing any provisions of this chapter. Such an appeal shall be requested by the applicant within 30 days of the date of the order, refusal, requirement, or determination being appealed.
(a) 
In hearing and deciding appeals under this subsection, ZBA review shall be based upon the record of the administrative decision being appealed, and the ZBA shall not consider new information which had not been presented to the administrative official, board or commission from whom the appeal is taken. The ZBA shall not substitute its judgment for that of the administrative official, board or commission being appealed, and the appeal shall be limited to determining, based upon the record, whether the administrative official, board or commission breached a duty or discretion in carrying out this chapter.
(3) 
Interpretation. The ZBA shall have authority to hear and decide requests for interpretation of the Zoning Ordinance, including the zoning map. The ZBA shall make such decisions so that the spirit and intent of this chapter shall be observed. Text interpretations shall be limited to the issues presented and shall be based upon a reading of the Ordinance as a whole and shall not have the effect of amending the Ordinance. Map interpretations shall be made based upon rules in the Ordinance, and any relevant historical information. In carrying out its authority to interpret the Ordinance, the ZBA shall consider reasonable and/or practical interpretations which have been consistently applied in the administration of the Ordinance. Prior to deciding a request for an interpretation, the ZBA may confer with staff and/or consultants to determine the basic purpose of the provision subject to interpretation and any consequences which may result from differing decisions. A decision providing an interpretation may be accompanied by a recommendation for consideration of an amendment of the Ordinance.
(4) 
Variances. The ZBA shall have authority in specific cases to authorize one or more dimensional or "non-use" variances from the strict letter and terms of this chapter by varying or modifying any of its rules or provisions so that the spirit of this chapter is observed, public safety secured, and substantial justice done. A dimensional or non-use variance allows a deviation from the dimensional (i.e., height, bulk, setback) requirements of the Ordinance. A use variance authorizes the establishment of a use of land that is otherwise prohibited in a zoning district. The ZBA is not authorized to grant use variances by this chapter. Such authority shall be exercised in accordance with the following standards.
(a) 
The ZBA may grant a requested "non-use" variance only upon a finding that practical difficulties exist and that the need for the variance is due to unique circumstances peculiar to the property and not generally applicable in the area or to other properties in the same zoning district. In determining whether practical difficulties exist, the ZBA shall consider the following factors:
[1] 
Unique circumstances or conditions exist which apply to the land, structure or building involved and which are not applicable to other lands, structures, or buildings in the same zoning district.
[2] 
As a result of the unique circumstances or conditions, strict compliance with the provisions of this chapter would unreasonably prevent the use of the property for a permitted purpose or would be unnecessarily burdensome.
[3] 
The unique circumstances do not result from the actions of the applicant, including the knowing purchase of a property limited by existing non-conformities.
[4] 
The variance requested is the minimum variance which will make possible the reasonable use of the land, building or structure.
[5] 
The granting of the variance will be in harmony with the spirit and intent of this chapter, and will not be injurious to the neighborhood, or otherwise detrimental to the public health, safety and welfare.
(b) 
In all variance proceedings, it shall be the responsibility of the applicant to provide information, plans, testimony and/or evidence from which the ZBA may make the required findings. Administrative officials and other persons may, but shall not be required to, provide information, testimony and/or evidence on a variance request.
(5) 
Conditions. The ZBA may impose reasonable conditions in connection with an affirmative decision on an appeal, interpretation or variance request. Conditions imposed shall meet the following requirements:
(a) 
Be designed to protect natural resources, the health, safety and welfare and the social and economic well-being of those who will use the land use or activity under consideration, residents and landowners immediately adjacent to the proposed land use or activity, and the community as a whole.
(b) 
Be related to the valid exercise of the police power, and purposes which are affected by the proposed use or activity.
(c) 
Be necessary to meet the intent and purpose of the zoning ordinance, be related to the standards established in the ordinance, be related to the standards established in the ordinance for the land use or activity under consideration, and be necessary to insure compliance with those standards.
(6) 
Conditions imposed with respect to the approval of a variance shall be recorded as part of the ZBA minutes, and shall remain unchanged except upon the mutual consent of the ZBA and the landowner following notice and hearing as required in a new case.
C. 
Applications and notices.
(1) 
Application. All applications to the ZBA shall be filed with the Village, on forms provided by the Village, and shall be accompanied by the applicable fee established by resolution of the Vicksburg Village Council. Applications shall include one individually folded copy and one digital copy of all plans, studies and other information and data to be relied upon by the applicant. Additional copies of the application material may be requested from Village staff at their discretion. These materials shall be submitted to the Village no later than 30 days prior to the Zoning Board of Appeals meeting at which the review is requested.
(2) 
Plot plan. A plot plan shall be required with all variance requests. The plan, which shall accompany all variance requests, shall be based on a mortgage survey or land survey prepared by a licensed land surveyor. The plan shall be to scale and shall include all property lines and dimensions, setbacks and all existing and proposed structures.
(a) 
The Zoning Board of Appeals has the authority to require a land survey prepared by a licensed land surveyor when the ZBA determines it to be necessary to ensure accuracy of the plan.
(b) 
The ZBA shall have no obligation to consider and/or grant a request for relief unless and until a conforming and complete application has been filed, including relevant plans, studies and other information.
(3) 
Applications involving an appeal of administrative order. In a case involving an appeal from an action of an administrative official or entity, the administrative official, or the clerk or secretary of the administrative entity, as the case may be, upon notice from the Zoning Department, shall transmit to the ZBA copies of all papers constituting the record upon which the action was taken, together with a letter specifying an explanation of the action taken.
(4) 
Consent of property owner required. Applications to the ZBA shall be made with the full knowledge and written consent of all owners of the property in question. This requirement shall include the consent of a land contract seller to the relief sought by a land contract purchaser.
(5) 
Notice. Notice of a public hearing concerning a request for a dimensional variance, interpretation of the zoning ordinance, or an appeal of an administrative decision shall be given as follows:
(a) 
A notice stating the time, date, and place of the public hearing shall be published in a newspaper of general circulation in the Village and sent to the person requesting the interpretation not less than 15 days before the public hearing.
(b) 
If the request for a dimensional variance, interpretation, or appeal involves a specific parcel, written notice stating the nature of the request and the time, date, and place of the public hearing shall be sent by first-class mail or personal delivery to all persons to whom real property is assessed within 300 feet of the boundary of the property in question, and to the occupants of all structures within 300 feet of the boundary of the property in question. If a tenant's name is not known, the term "occupant" may be used.
(6) 
Stay of proceedings. An appeal shall have the effect of staying all proceedings in furtherance of the action being appealed unless the officer or entity from whom the appeal is taken certifies to the ZBA that, by reason of facts stated in such certification, a stay would in his or her opinion cause imminent peril to life or property, in which case proceedings shall not be stayed unless specifically determined by the ZBA, or by a court of competent jurisdiction.
(7) 
Decision by the Zoning Board of Appeals. The concurring vote of a majority of the membership of the ZBA shall be necessary to reverse any order, requirement, decision, or determination of an administrative official, board, or commission made in the administration of this chapter, to decide in favor of an applicant on any matter upon which the ZBA is required to pass under this chapter, or to grant a non-use variance from the terms of this chapter.
D. 
Disposition and duration of approval.
(1) 
The ZBA may reverse, affirm, vary of modify any order, requirement, decision, or determination presented in a case within the ZBA's jurisdiction, and to that end, shall have all of the powers of the officer, board or commission from whom the appeal is taken, subject to the ZBA's scope of review, as specified in this chapter and/or by law. The ZBA may remand a case for further proceedings and decisions, with or without instructions.
(2) 
Decision final. A decision by the ZBA shall be considered final as of the meeting at which the decision has been made, and the date of such meeting shall be deemed to be the date of notice of the decision to the applicant. To the extent that decisions are requested or required to be in writing, the minutes of the ZBA meeting, and decision, as proposed under supervision of the secretary, shall constitute the written decision.
(3) 
Period of validity. Any decision of the ZBA favorable to the applicant shall remain valid only as long as the information and data relating to such decision are found to be correct, and the conditions upon which the decision was based are maintained. The relief granted by the ZBA shall be valid for a period not longer than one year, unless otherwise specified by the ZBA, and within such period of effectiveness, actual on-site improvement of property in accordance with the approved plan and the relief granted, under a valid building permit, must be commenced or the grant of relief shall be deemed void.
(4) 
Record of proceedings. The Secretary of the Zoning Board of Appeals, in collaboration with Village administrative staff, shall prepare and keep minutes of the ZBA proceedings, showing the findings, decisions, conditions, if any, and votes of each member in each case, including a member's absence or failure to vote. The minutes shall be within the ultimate authority, and shall be the responsibility, of the secretary of the ZBA, and shall be subject to approval of the ZBA. To the extent that a written decision in a case is requested or required, the minutes, prepared under the supervision of the ZBA secretary, along with the plan submitted, shall serve as the written decision, even if the minutes are awaiting final ZBA approval.
(a) 
The official records of the ZBA proceedings shall be filed in the Village Hall and shall be public records.
(5) 
Appeal of a ZBA decision. Appeals of a ZBA decision shall be taken in the manner provided by law.
(6) 
New application for variance. If the ZBA denies a request for a variance, the decision of the ZBA shall not be subject to re-consideration for a period of one year, whereupon the applicant may submit a new application for the variance. However, the ZBA may waive the one-year period if conditions upon which their original decision was made change, or if information relating to the original decision are found to be incorrect or inaccurate.

§ 475-12.07 Amendments.

A. 
Initiation of amendment. The Village Council may amend, supplement, or change the district boundaries or the regulations herein, pursuant to the authority and procedures set forth in Michigan Public Act 110 of 2006, as amended. Text amendments may be proposed by any governmental body or any interested person or organization. Changes in district boundaries may be proposed by any governmental body, any person having a freehold interest in the subject property, or by the designated agent of a person having a freehold interest in the property.
B. 
Application for amendment. A petition for an amendment to the text of this chapter or an amendment to change the zoning classification of a particular property, shall be commenced by filing a petition on the forms provided by the Village and accompanied by the fees specified. The petition shall describe the proposed amendment and shall be signed by the applicant. Petitions for rezoning of a specific site shall be accompanied by a plot plan or survey, which shall contain the following information, as deemed appropriate by Village staff. These materials shall be submitted to the Village no later than 30 calendar days prior to the Planning Commission or Village Council meeting at which the review is requested.
(1) 
Applicant's name, address, and telephone number.
(2) 
Scale, north point, and dates of submittal and revisions.
(3) 
Zoning classification of petitioner's parcel and all abutting parcels.
(4) 
Existing lot lines, building lines, structures, parking areas, driveways, and other improvements on the site and within 50 feet of the site.
(5) 
Proposed lot lines and lot dimensions, and general layout of proposed structures, parking areas, driveways, and other improvements on the site.
(6) 
Dimensions, centerlines, and right-of-way widths of all abutting streets and alleys, both public and private.
(7) 
General location of existing drainage courses, floodplains, lakes and streams, and woodlots.
(8) 
All existing and proposed easements.
(9) 
Location of sanitary sewer or septic systems, existing and proposed.
(10) 
Location and size of water main, well sites, and building services, existing and proposed.
(11) 
Optional Conditional Rezoning (CR) Agreement. A CR Agreement, which is voluntarily offered by the applicant (or designee), may be submitted. If submitted, the Agreement shall set forth the Rezoning Conditions, together with any other term mutually agreed upon by the parties, including the following terms:
(a) 
Agreement and acknowledgement that the conditional rezoning was proposed by the applicant to induce the Village to grant the rezoning, and that the Village relied upon such proposal and would not have granted the rezoning but for the terms in the CR Agreement.
(b) 
Agreement and acknowledgement that the conditions and CR Agreement are authorized by all applicable state and federal laws and constitution, and that the CR Agreement is valid and was entered into on a voluntary basis, representing a permissible exercise of authority by the Village.
(c) 
Agreement and understanding that the property in question shall not be developed or used in a manner that is inconsistent with the CR Plan and CR Agreement.
(d) 
Agreement and understanding that the approval and CR Agreement shall be binding upon and inure to the benefit of the property owner and the Village, and their respective heirs, successors, assigns, and transferees.
(e) 
Agreement and understanding that, if a conditional zoning expires in the manner provided in this section, no development shall be undertaken or permits for development issued until a new zoning district classification of the property has been established.
(f) 
Agreement and understanding that each of the requirements and conditions in the CR Agreement represents a necessary and reasonable measure which, when considered with all other conditions and requirements, is roughly proportional to the increased impact created by the use represented in the approved conditional rezoning, taking into consideration the changed zoning district classification and the specific use authorization granted.
(g) 
Any other agreement voluntarily proposed by the applicant (or designee) that is consistent with all applicable state and federal laws and is agreed to by the Village.
C. 
Review procedures: After the completed petition and all required supporting materials have been received and fees paid, the petition shall be reviewed in accordance with the following procedures:
(1) 
Planning Commission review. The petition shall be placed on the agenda of the next regularly scheduled meeting of the Planning Commission, subject to meeting all notification requirements. The Planning Commission shall review the petition for amendment in accordance with the procedures and public hearing and notice requirements set forth in Michigan Public Act 110 of 2006, as amended, and schedule a public hearing for the request on the next available Planning Commission agenda.
(2) 
Action by the Planning Commission. Following the hearing on the proposed amendment, the Planning Commission shall make written findings of fact which it shall transmit to the Village Council, together with the comments made at the public hearing and its recommendations.
(3) 
Action by the Village Council. The Village Council may hold additional hearings if the Council considers it necessary, following the hearing and notice requirements of Michigan Public Act 110 of 2006, as amended. The Council may by majority vote of its membership adopt the proposed amendment, reject the proposed amendment, or refer the proposed amendment back to the Planning Commission for further review and recommendation within a specified time period. Thereafter, the Council may either adopt the amendment with or without the recommended revisions or reject it.
(4) 
Review considerations. The Planning Commission and Village Council shall at minimum, consider the following before taking action on any proposed amendment.
(a) 
Will the proposed amendment be in accordance with the basic intent and purpose of the Zoning Ordinance?
(b) 
Will the proposed amendment further the comprehensive planning goals of the Village as reflected in the Master Plan?
(c) 
Have conditions changed since the Zoning Ordinance was adopted or was there a mistake in the Zoning Ordinance that justifies the amendment?
(d) 
Will the amendment correct an inequitable situation created by the Zoning Ordinance, rather than merely grant special privileges?
(e) 
Will the amendment result in unlawful exclusionary zoning?
(f) 
Will the amendment set an inappropriate precedent, resulting in the need to correct future planning mistakes?
(g) 
If a rezoning is requested, is the proposed zoning consistent with the zoning classification of surrounding land?
(h) 
If a rezoning is requested, could all requirements in the proposed zoning classification be complied with on the subject parcel?
(i) 
If a rezoning is requested, is the proposed zoning consistent with the trends in land development in the general vicinity of the property in question?
(j) 
Will the proposed amendment be consistent with the purposes of this chapter and, in particular, will the proposed amendment promote the public health, safety and welfare?
(5) 
Notice of record of amendment adoption. Following adoption of an amendment by the Village Council, one notice of adoption shall be filed with the Village Clerk and one notice shall be published in newspaper of general circulation in the Village within 15 days after adoption, in accordance with Michigan Public Act 110 of 2006, as amended. A record of all amendments shall be maintained by the Clerk. A master Zoning Map shall be maintained by the Village, which shall identify all map amendments.
(6) 
Effects of approval of a Conditional Rezoning Agreement. If a Conditional Rezoning Agreement has been approved, the use of property in question shall conform to all regulations governing development and use in the zoning district to which the property has been rezoned, subject to the following:
(a) 
Development subject to Conditional Rezoning Requirements. Development and use of the property shall be subject to the more restrictive requirements specified on the CR Plan, in the Rezoning Conditions and in the CR Agreement, required as part of the Conditional Rezoning approval. Such requirements shall supersede all inconsistent regulations otherwise applicable under the Zoning Ordinance.
(b) 
Site plan review and other approvals required. Approval of the CR Plan and Agreement confirms only the rezoning of the property, subject to any conditions imposed as reflected in the CR Plan. Site plan, Special Land Use, plat, and condominium approval, as appropriate, shall be required, pursuant to procedures in this chapter, prior to any improvements to the property.
[1] 
Any use or development proposed as part of any offer of conditions that would require a variance under the terms of this chapter may only be commenced if a variance for such use or development is ultimately granted by the Zoning Board of Appeals in accordance with the provisions of this chapter.
(c) 
Recording and publication of CR Agreement. A conditional rezoning shall become effective following publication in the manner provided by law, and, after recordation of the CR Agreement, whichever is later.
D. 
Referendum. Within 30 days following the passage of the amendment, a petition signed by a number of qualified and registered voters as specified in Section 402 of Public Act 110 of 2006, as amended, may be filed with the Clerk requesting submission of an ordinance or part of an ordinance to the electors for their approval, in accordance with Section 402(2) of Michigan Public Act 110 of 2006, as amended.

§ 475-12.08 Filing fees.

All applications shall be accompanied by a filing fee which shall be established by resolution of the Village Council, in accordance with Section 406 of Public Act 110 of 2006, as amended. This filing fee may include a deposit toward the costs of any consultants retained by the Village for reviewing the application, such as consulting planning services, consulting engineering services, legal services, court reporter services, or similar services. The filing fee and deposit shall be paid before the review process begins. Upon notification of deficient payment of fees, administrative officials charged with enforcement of the Ordinance shall suspend further review of the application.
A. 
Any deposit toward the cost of any consultants shall be credited against the expense to the Village of such consultants, which shall be fully charged to the applicant. Any portion of the deposit not needed to pay such expense shall be refunded without interest to the applicant within 30 days of final action on the application.
B. 
A schedule of the current filing fees and deposit requirements shall be made available to anyone who requests it.
C. 
The assessment and payment of application fees does not affect the requirements for a performance guarantee.

§ 475-12.09 Violations and penalties.

A. 
Public nuisance. Buildings erected, altered, razed or converted (including tents, mobile homes, and trailer coaches), or uses carried on in violation of any provision of this chapter, are hereby declared to be a nuisance per se, and shall be subject to abatement or other action by a court of appropriate jurisdiction.
B. 
Violation defined. Any person, firm, corporation, or agent, or any employee, contractor, or subcontractor of same, who fails to comply with any of the provisions of this chapter or any of the regulations adopted in pursuance thereof, or who impedes or interferes with the enforcement of this chapter by the Zoning Administrator or other Enforcement Official shall be deemed in violation of this chapter.
C. 
Penalties. Any violation of this chapter shall constitute municipal civil infraction (as defined by Michigan Statute). The penalty for a municipal civil infraction shall be a civil fine determined by Council Resolution:
(1) 
In addition, the violator shall pay costs which may include all expenses, direct and indirect, which Village of Vicksburg has incurred in connection with the municipal civil infraction.
(2) 
Upon notice of a violation, the appropriate Village employee shall investigate any violation and then make a determination as to whether the penalty shall be imposed. This municipal civil infraction ticket shall serve as notice of the alleged violation. The imposition of a municipal civil infraction fine for any violation shall not excuse the violation or permit it to continue. Further violations subject the owner or occupant, or person or persons, agent, firm or corporation to subsequent municipal civil infraction violations.
(3) 
Furthermore, the owner or tenant of any building, structure, premise, or part thereof, and any architect, engineer, builder, contractor, agent, or other person who commits, participates in, assists in, or maintains any violation of the Ordinance may each be found guilty of a separate offense and may be subject to the penalties provided herein. The cost of prosecution shall also be assessed against the violator.
(4) 
The imposition of any sentence shall not exempt the offense from compliance with the requirement of this chapter.
D. 
Authority to pursue court action. The Village Council or its duly authorized representative is hereby empowered to commence and pursue any and all necessary and appropriate actions or proceedings in the Circuit Court, or any other court having jurisdiction, to restrain or prevent any non-compliance with, or violation of, any of the provisions of this chapter, and to correct, remedy, or abate such noncompliance or violation. Any person aggrieved or adversely affected by such noncompliance or violation may institute suit or join the Village Council in such a suit to abate the violation.
E. 
Other remedies. The rights and remedies set forth above shall not preclude the use of other remedies provided by law, including any additional rights of the Village to initiate proceedings in an appropriate court of law to restrain or prevent any noncompliance with any provisions of this chapter, or to correct, remedy, or abate such non-compliance.
F. 
Rights and remedies preserved. Any failure or omission to enforce the provisions of this chapter, and failure or omission to prosecute any violations of this chapter, shall not constitute a waiver of any rights and remedies provided by this chapter or by law, and shall not constitute a waiver or nor prevent any further prosecution of violations of this chapter.

§ 475-12.10 Records.

The Village shall keep accurate records of all decisions on all applications submitted pursuant to this chapter.

§ 475-12.11 Public notice.

The Village shall ensure that any application process requiring a public hearing shall comply with the requirements of PA 110 of 2006, as amended, and the procedures of this section.
A. 
Publication in a newspaper of general circulation. Notice of the request shall be published in a newspaper of general circulation not less than 15 days before the date the application will be considered for approval.
B. 
Personal and mailed notice.
(1) 
Notice shall be sent by mail or personal delivery to the owners of property for which approval is being considered.
(2) 
Notice shall be sent to all persons to whom real property is assessed within 300 feet of the property and to the occupants of all structures within 300 feet of the property, including the owners or occupants of structures located in adjacent cities or townships. If the name of the occupant is not known, the term "occupant" may be used in making notification.
(3) 
All notice delivered by mail or personal delivery must be given not less than 15 days before the date of the public hearing. Notice shall be deemed mailed by its deposit in the United States mail.
(4) 
The Village shall prepare a list of property owners and occupants to whom notice was mailed or delivered.
(5) 
Content. Any notice published in a newspaper or delivered by mail or personal delivery shall:
(a) 
Describe the nature of the request.
(b) 
Indicate the property that is the subject of the request.
(c) 
Include a listing of all existing street addresses within the property. If no such addresses exist, other means of identifying the property may be used.
(d) 
When and where the public hearing will occur.
(e) 
When and where written comments may be submitted concerning the request.