7. - Land use permits.
11.7.1 Land use permit required.
A.
No building or land shall hereafter be used and no structure or sign or part thereof shall be erected, moved, or altered except in conformity with the regulations herein specified for the district in which it is located, except as hereinafter provided in this ordinance.
B.
No land shall be used or occupied and no building hereafter erected, structurally altered, or moved or its use changed, except in conformity with the provisions of this ordinance or except after written order from the board of adjustment.
C.
A building permit shall not be issued by the building inspector unless a land use permit has been issued by the Town of Angier.
D.
The issuance of a valid land use permit shall confer with it the right to undertake and complete the development and/or use of property under the terms and conditions of such permit provided that such action as authorized by the permit is commenced within six months of issuance and provided that all other permits are obtained. Otherwise the permit shall be void.
E.
The applicant must be the landowner, a lessee or person holding an option or contract to purchase or lease land, or an authorized agent of the landowner.
11.7.2 Land use permit not required. Notwithstanding any other provisions of this ordinance, no land use permit is necessary for the following uses, but shall not include utility structures:
A.
Street construction or repair;
B.
Electric power, telephone, telegraph, cable television, gas, water, and sewer lines, wires or pipes, together with supporting poles or structures, located within a public right-of-way;
C.
Specific signs exempted in chapter 10 of this ordinance;
D.
Mailboxes, newspaper boxes, walls, birdhouses, flag poles, pump covers, and doghouses;
E.
Interior alterations and renovations which do not alter the footprint, elevation, height, or use of an otherwise conforming use and/or structure.
11.7.3 Application procedures.
A.
For single-family and two-family residential structures, a plot plan and the following information shall be submitted to the administrator with the land use permit application and fee:
1.
The shape and dimensions of the lot on which the proposed building or use is to be erected or conducted,
2.
The location of said lot with respect to adjacent rights-of-way,
3.
The shape, dimensions, and location of all buildings, existing and proposed, on the said lot,
4.
The nature of the proposed use of the building or land, including the extent and location of the use, on the said lot,
5.
The location and dimensions off-street parking and driveways,
6.
The proposed impervious area including all buildings, driveways, sidewalks, and patios,
7.
Building elevations of the front façade, and
8.
Any other information which the administrator may deem necessary for consideration in enforcing the provisions of this ordinance.
B.
For all other developments requiring a land use permit, a site plan shall be submitted in accordance with the development plan requirements of chapter 12 and follow the approval process as outlined in this chapter prior to land use permit issuance by the administrator. Any development project requiring a special use permit, shall follow the board of adjustment approval process outlined in the chapter prior to land use permit issuance by the administrator.
11.7.4 Conditions of approval. Land use permits issued on the basis of an application and plan approved by the administrator authorize only the use, arrangement, and construction set forth in such approved applications and plans. Use, arrangement, or construction that differ from that authorized shall be deemed a violation of this ordinance and shall be punishable as indicated under chapter 15 of this ordinance.
11.7.5 Expiration of land use permit. Unless otherwise specified in this ordinance, any land use permit issued shall become invalid unless the work authorized by it shall have been commenced within 12 months from its date of issuance, or if the work authorized by it is suspended or abandoned for a period of 24 months.
11.7.6 Final zoning inspection. The administrator shall conduct a final zoning inspection of any new or expanded use or structure (except single-family and two-family residential uses) prior to the issuance of a certificate of occupancy by the building inspector. During the final zoning inspection, the administrator shall ensure that all minimum requirements and conditions of approval have been met and that the project matches the approved site plan. Pursuant to N.C.G.S. 160D-403(e), the administrator may enter the premises at all reasonable hours upon presentation of proper credentials; provided, however, that the appropriate consent has been given for inspection of areas not open to the public or that an appropriate inspection warrant has been secured.
11.7.7 Certificate of occupancy required. No structure hereafter erected, moved, structurally altered, or changed in use shall be used or occupied until a certificate of occupancy has been issued by the building inspector.
(Ord. of 6-1-2021)