Zoneomics Logo
search icon

Bertrand Township City Zoning Code

CHAPTER 9

- L - LANDFILL DISTRICT

Sec. 24-277.- Intent and purpose.

The regulations of the L district are intended to provide for lands where a municipal landfill can be operated, along with any uses accessory to a landfill. In addition, this district provides locations where landfill gases or other landfill byproducts can be utilized for energy generation. The district also provides for some end uses after the municipal landfill is closed and capped.

(Ord. of 2-1-2018, § 9.01)

Sec. 24-278. - Table of uses.

The following abbreviations apply to the table of uses:

P: Permitted use: Land and/or buildings in this district may be used for the purposes listed by right.
NP: Not permitted.
SLU: Special land use: The following uses may be permitted by obtaining special land use approval when all applicable standards cited in chapter 11 of this chapter are met.

 

Table of UsesL
Landfills owned by or contracted for use by municipalities P
Privately owned and operated landfills NP
Energy generation plants using landfill gas or other landfill byproducts as an energy source SLU
Farms P
Industrial uses on the landfill site that use energy generated on the landfill site as their primary energy source SLU
Greenhouses and plant nurseries P
Golf course or country club SLU
On-site service wind energy conversion systems (WECS), subject to section 24-105 P
Commercial WECS and WECS testing facilities associated with a commercial WECS SLU
Parks P
Solar panels SLU

 

(Ord. of 2-1-2018, § 9.02)

Sec. 24-279. - Spatial requirements.

(a)

Spatial requirements for L Landfill District are as follows:

Lot, Yard, and Building Requirements
RequirementL - Landfill
Minimum Lot Requirements Area 50 acres
Width 330 ft.
Width to depth ratio 1:4
Setback Requirements (see subsection (b) of this section) Front 50 ft.
Side Adjacent to nonresidential district 50 ft.
Adjacent to residential district or use lot 100 ft.
Rear Adjacent to nonresidential district 50 ft.
Adjacent to residential district 100 ft.
Building Requirements Maximum height 50 ft.

 

(b)

All excavation, compaction and filling activities shall be set back a minimum distance of 100 feet from all exterior lot lines.

(Ord. of 2-1-2018, § 9.03)