A temporary construction building(s) or trailer(s) may be installed on a property during construction of a permanent building or structure, so long as the construction trailer is not used as a dwelling. Temporary construction buildings or trailers shall comply with the provisions of the Township Building Code and, if located on a site in excess of 180 days, it shall be located, in accordance with principal building requirements set forth in this chapter which are applicable to the district in which the property is located. All temporary construction trailers or buildings shall be removed within 14 days of completion of construction of the permanent building or buildings, or within 14 days of the expiration of the zoning and/or building permit for the project, whichever first occurs.