[Ord. No. 4-2022, 6/9/2022]
A nonconforming building, structure or land use which is partially damaged or entirely destroyed by accident or on purpose, may be replaced or expanded in conformance with § 27-2402 and shall be used for the same use as legally existed prior to the damage or destruction, provided that the replacement building, structure or land use shall create no new nonconformities. Such restoration must commence within six months of the time of damage or destruction and must be completed within 18 months of the damage or destruction, unless the Township Zoning Hearing Board grants an extension for these time limits on the basis of such restoration not being practical or possible within the time limits herein prescribed. Any nonconforming building, structure, or land use located within the Floodplain Overlay District must also comply with the applicable floodplain requirements. Applications to alter these time limitations for commencement of restoration shall be filed no later than six months after the time of damage or destruction.