[Prior code § 17.0206(7)(d)]
Description. Extraction uses include and land uses involving the removal of soil, clay, sand, gravel, rock, minerals, peat, or other material in excess of that required for approved on-site development or agricultural activities.
A. Permitted by right: not applicable.
B. Special use regulations: not applicable.
C. Conditional use regulations (A-1):
1. Shall receive approval from Dane County prior to action by the Village of Darien, and shall comply with all county, state and federal regulations;
2. Facility shall provide a bufferyard with a minimum opacity of 1.00 along all borders of the property (see Section
17.68.100);
3. All buildings, structures, and activity areas shall be located a minimum of 300 feet from all lot lines;
4. Required site plans shall include detailed site restoration plans, which shall include at minimum, detailed grading and revegetation plans, and a detailed written statement indicating the timetable for such restoration. A surety bond, in an amount equivalent to 110% of the costs determined to be associated with the restoration (as determined by a third party selected by the Village), shall be filed with the Village by the petitioner (subject to approval by the Zoning Administrator), and shall be held by the Village for the purpose of ensuring that the site is restored to its proposed condition. (The requirement for the surety is waived for waste disposal facilities owned by public agencies.);
5. Shall comply with Section
17.72.040, standards and procedures applicable to all conditional uses.
D. Parking regulations: one space per each employee on the largest work shift.