32 ECOLOGICAL RESOURCE/OPEN SPACE/PARKS ZONE
ZONE REQUIREMENT | ER / OS ZONE |
|---|---|
1. Lot Coverage (maximum %) | 50% |
2. Building Height (maximum) | 30 ft. or 2 stories, whichever is less |
3. Off-Street Parking | (See Chapter 30.54) |
Notes: | |
|---|---|
* | Aquaculture operations shall be land-based and shall not require intake or discharge from coastal waters. The operations shall use closed loop circulation systems and must use municipal water and sewer. In addition, operations shall be planned, sited, designed and managed to protect the quality and biological productivity of coastal waters, including the ocean, rivers, streams, wetlands, estuaries, lakes, and groundwater. |
32 ECOLOGICAL RESOURCE/OPEN SPACE/PARKS ZONE
ZONE REQUIREMENT | ER / OS ZONE |
|---|---|
1. Lot Coverage (maximum %) | 50% |
2. Building Height (maximum) | 30 ft. or 2 stories, whichever is less |
3. Off-Street Parking | (See Chapter 30.54) |
Notes: | |
|---|---|
* | Aquaculture operations shall be land-based and shall not require intake or discharge from coastal waters. The operations shall use closed loop circulation systems and must use municipal water and sewer. In addition, operations shall be planned, sited, designed and managed to protect the quality and biological productivity of coastal waters, including the ocean, rivers, streams, wetlands, estuaries, lakes, and groundwater. |