24 LIGHT INDUSTRIAL ZONES
ZONE REQUIREMENT | ZONE | |
|---|---|---|
LI | BP | |
1. Net Lot Area (sq. ft) | 20,000 | 20,000 |
2. Lot Width (ft.) | 100 | 100 |
3. Lot Depth (ft.) | 150 | 150 |
4. Front Yard Setback (ft.) | 20 | 20 |
5. Side Yard Setback (ft.) for each interior side | 10/10 | 10/10 |
6. Side Yard Setback (ft.) street side | 20 | 20 |
7. Rear Yard Setback (ft.) | 0 | 0 |
8. Lot Coverage (maximum %) | 40% | 40% |
9. Building Height (maximum) see Section 30.24.010C6 | 30 feet or 2 stories, whichever is less | |
10. Floor Area Ratio (maximum) | 0.75 | 0.75 |
11. Off-Street Parking | (See Ch. 30.54) | |
12. Landscaping | 15% | 15% |
24 LIGHT INDUSTRIAL ZONES
ZONE REQUIREMENT | ZONE | |
|---|---|---|
LI | BP | |
1. Net Lot Area (sq. ft) | 20,000 | 20,000 |
2. Lot Width (ft.) | 100 | 100 |
3. Lot Depth (ft.) | 150 | 150 |
4. Front Yard Setback (ft.) | 20 | 20 |
5. Side Yard Setback (ft.) for each interior side | 10/10 | 10/10 |
6. Side Yard Setback (ft.) street side | 20 | 20 |
7. Rear Yard Setback (ft.) | 0 | 0 |
8. Lot Coverage (maximum %) | 40% | 40% |
9. Building Height (maximum) see Section 30.24.010C6 | 30 feet or 2 stories, whichever is less | |
10. Floor Area Ratio (maximum) | 0.75 | 0.75 |
11. Off-Street Parking | (See Ch. 30.54) | |
12. Landscaping | 15% | 15% |