Application for approval of the construction of such building or structure shall be made to the Building Board along with such drawing or plat as said Board considers adequate to show the proposed location of such building or structure, and also to show the proposed location and type of planting that will be made and maintained to shield such proposed building or structure from the right-of-way. If the Building Board determines such planting is adequate to so screen said proposed building or structure and the building or structure otherwise complies with the Code of the Village of Fox Point, it shall approve the construction of such accessory building or structure and the landscaping; otherwise, it shall disapprove. The planting approved for such screening shall be done not later than one year after the granting of a building permit for the building or structure, and after being planted shall be maintained in a neat manner, and in the event of the death of any such planting, replacement shall be made.